<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>highway Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/highway/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Fri, 16 Oct 2026 19:16:03 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>highway Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>I-215/Van Buren Boulevard Interchange Improves Mobility and Access Along I-215 Corridor</title>
		<link>https://www.rctc.org/215-van-buren-interchange-improves-travel/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 25 Sep 2025 20:09:50 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[215]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[March Field]]></category>
		<category><![CDATA[Measure A Successes]]></category>
		<category><![CDATA[Van Buren Boulevard]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106555</guid>

					<description><![CDATA[<p>Key infrastructure project enhanced travel along I-215 </p>
<p>The post <a href="https://www.rctc.org/215-van-buren-interchange-improves-travel/">I-215/Van Buren Boulevard Interchange Improves Mobility and Access Along I-215 Corridor</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Key infrastructure project enhanced travel along I-215 </strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The I-215 serves as a crucial transportation corridor for the Inland Empire, connecting cities such as Riverside, San Bernardino, Murrieta, and Moreno Valley, while facilitating the movement of commuters and goods between major freeways and economic hubs. As the region continues to grow, this vital corridor plays an essential role in reducing congestion and supporting regional development.</p>
<p>One significant infrastructure project that has improved travel along this corridor is the I-215/Van Buren Boulevard Interchange Project, located near the March Air Reserve Base in Moreno Valley. Completed in 2015, the project began construction in 2012 and was a collaborative effort between the Riverside County Transportation Department (RCTD), Caltrans, the March Joint Powers Authority (March JPA), and the Riverside County Transportation Commission (RCTC). The project was designed to accommodate future growth by reconfiguring the previous tight diamond interchange. The enhancements included the addition of new on-ramps, realignment and widening of Van Buren Boulevard, and replacement of existing bridge structures over the railroad and freeway. Additionally, the I-215 was widened between Cactus Avenue and Harley Knox Boulevard, with a minor realignment of the southbound lanes to improve traffic flow.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.2%;"></div><img fetchpriority="high" decoding="async" class="wp-image-106558" src="https://www.rctc.org/wp-content/uploads/2025/05/I-215_Van-Buren-Interchange_1-uai-1992x1120.webp" width="1992" height="1120" alt="I 215 Van Buren Interchange 1"></div>
					</div>
				</div></div></div></div><figcaption>Image courtesy of Kimley-Horn and Associates, Inc.</figcaption></div><div class="uncode_text_column text-lead" ><p>Further improvements outside the interchange included new traffic signals and streetlights, upgraded lighting at the northbound ramps, auxiliary lanes along the I-215 between Van Buren Boulevard and Cactus Avenue, and acceleration and deceleration lanes south of Van Buren Boulevard.</p>
<p>Visual design elements were integrated into the bridge structures, retaining walls, and surrounding landscaping to reflect the area&#8217;s military heritage. Moreover, regional access to the Riverside National Cemetery and March Air Museum was significantly enhanced as a result of the new interchange. The project team was recognized with the American Planning Association’s 2015 IES-APA Urban Design Award for their work in urban planning and design.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><img decoding="async" class="wp-image-106563" src="https://www.rctc.org/wp-content/uploads/2025/05/0525_Point_Van_Buren_Construction-uai-2000x1125.jpg" width="2000" height="1125" alt="0525 Point Van Buren Construction"></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Funding for the project came from <a href="https://www.rctc.org/measure-a/">Measure A</a>, a voter-approved half-cent sales tax measure aimed at transportation improvements in Riverside County, which facilitated its progression to construction. The collaboration among RCTD, Caltrans, March JPA, and RCTC ensured that the interchange meets the transportation needs of the region.</p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/215-van-buren-interchange-improves-travel/">I-215/Van Buren Boulevard Interchange Improves Mobility and Access Along I-215 Corridor</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Accordingly! Extended Full Closure of the Rancho California Road Loop On-Ramp for Northbound I-15 Starts on August 14</title>
		<link>https://www.rctc.org/plan-accordingly-extended-full-closure-of-the-rancho-california-road-loop-on-ramp-for-northbound-i-15-starts-on-august-14/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 11 Aug 2025 23:51:58 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Murrieta]]></category>
		<category><![CDATA[Smart Freeway]]></category>
		<category><![CDATA[Temecula]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[closure]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Smart Freeways]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=107798</guid>

					<description><![CDATA[<p>Rancho California Road direct on-ramp closure will allow crews to safely reconstruct the on-ramp for the I-15 Smart Freeway Pilot Project</p>
<p>The post <a href="https://www.rctc.org/plan-accordingly-extended-full-closure-of-the-rancho-california-road-loop-on-ramp-for-northbound-i-15-starts-on-august-14/">Plan Accordingly! Extended Full Closure of the Rancho California Road Loop On-Ramp for Northbound I-15 Starts on August 14</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="TrackChangeTextInsertion TrackedChange SCXW126708717 BCX8"><span class="TextRun SCXW126708717 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW126708717 BCX8">The 10-day </span></span></span><span class="TrackChangeTextInsertion TrackedChange SCXW126708717 BCX8"><span class="TextRun SCXW126708717 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW126708717 BCX8">R</span></span></span><span class="TextRun SCXW126708717 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW126708717 BCX8">ancho California Road </span><span class="NormalTextRun SCXW126708717 BCX8">loop</span><span class="NormalTextRun SCXW126708717 BCX8"> on-ramp closure will allow crews to safely </span><span class="NormalTextRun SCXW126708717 BCX8">reconstruct t</span></span><span class="TrackChangeTextInsertion TrackedChange SCXW126708717 BCX8"><span class="TextRun SCXW126708717 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW126708717 BCX8">he on-ramp for the I-15 Smart Freeway Pilot Project</span></span></span></strong></p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Residents and motorists planning to travel northbound on I-15 from the Rancho California Road loop on-ramp are advised to plan ahead for an extended closure of the ramp. The extended full closure of the Rancho California Road loop on-ramp for northbound I-15 will begin on Thursday, August 14 at 9 p.m. through Monday, August 25 at 5 a.m. The closures are required to allow crews to safely extend a second lane of the on-ramp by several hundred feet and create a safety pocket for emergency vehicles.</p>
<p>While crews are completing work on the ramp, motorists are advised to travel east on Rancho California Road, northbound on Ynez Road, and west on Winchester Road to enter Northbound I-15.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><a class="single-media-link" href="https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-scaled.jpg" target="_blank"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-107763" src="https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-scaled.jpg" width="2560" height="1808" alt="Rancho Calif detour map loop (2)" srcset="https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-300x212.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-1024x723.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-768x542.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-1536x1085.jpg 1536w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-2048x1446.jpg 2048w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-350x247.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-24x17.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-36x25.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-48x34.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-500x353.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-800x565.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-1280x904.jpg 1280w, https://www.rctc.org/wp-content/uploads/2025/08/Rancho-Calif-detour-map_loop-2-1920x1356.jpg 1920w" sizes="(max-width: 2560px) 100vw, 2560px" /></div>
					</div>
				</div></div></div></a></div></div><div class="uncode_text_column text-lead" ><p>Closure dates are subject to change due to weather, site conditions, construction progress, and other factors.</p>
<p>The work will involve reconfiguring and realigning the ramp to create a merge point between the loop and the direct on-ramps for Rancho California Road.</p>
<p>The Smart Freeway Pilot Project will use ramp meters that work as a coordinated system that adapts to allow more or fewer vehicles to enter I-15 at any given time from the Temecula Parkway, Rancho California Road, and Winchester Road on-ramps. The project is anticipated to improve overall traffic flow and reduce rear-end collisions within the I-15 corridor, without highway expansion and related construction costs and impacts.</p>
<p>For more information about the Smart Freeway Pilot Project and the Temecula Parkway on-ramp closure, visit <a href="http://rctc.org/temeculaclosures" target="_blank" rel="noopener">rctc.org/temeculaclosures </a></p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/plan-accordingly-extended-full-closure-of-the-rancho-california-road-loop-on-ramp-for-northbound-i-15-starts-on-august-14/">Plan Accordingly! Extended Full Closure of the Rancho California Road Loop On-Ramp for Northbound I-15 Starts on August 14</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Ahead! Extended Full Closure of the Rancho California Road Direct On-Ramp for Northbound I-15 Starts on July 13</title>
		<link>https://www.rctc.org/full-closure-15-northbound-rancho-california-road-on-ramp/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 10 Jul 2025 20:19:48 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Murrieta]]></category>
		<category><![CDATA[Smart Freeway]]></category>
		<category><![CDATA[Temecula]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[closure]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Smart Freeways]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106707</guid>

					<description><![CDATA[<p>Rancho California Road direct on-ramp closure will allow crews to safely reconfigure and realign the ramp for the I-15 Smart Freeway Pilot Project</p>
<p>The post <a href="https://www.rctc.org/full-closure-15-northbound-rancho-california-road-on-ramp/">Plan Ahead! Extended Full Closure of the Rancho California Road Direct On-Ramp for Northbound I-15 Starts on July 13</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Rancho California Road direct on-ramp closure will allow crews to safely reconfigure and realign the ramp for the I-15 Smart Freeway Pilot Project</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Residents and motorists planning to travel northbound on I-15 using the Rancho California Road direct on-ramp are advised to plan ahead for an extended closure of the ramp. RCTC will require an extended full closure of the Rancho California Road on-ramp for northbound I-15 beginning on Sunday, July 13 at 9 p.m. through Monday, July 21 at 5 a.m. The closures are required to allow crews to safely extend a second lane of the on-ramp by several hundred feet and create a safety pocket for emergency vehicles.</p>
<p>While crews are completing work on the ramp, motorists are advised to travel west on Rancho California Road, northbound on Jefferson Avenue, and east on Winchester Road to enter Northbound I-15.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-106711" src="https://www.rctc.org/wp-content/uploads/2025/06/061025_Smart_Freeway_Rancho_California_Detour_Map_Reduced_Size.gif" width="1920" height="1080" alt="061025 Smart Freeway Rancho California Detour Map Reduced Size"></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Closure dates are subject to change due to weather, site conditions, construction progress, and other factors.</p>
<p>The work will also involve reconfiguring and realigning the ramp to create a merge point between the loop and the direct on-ramps for Rancho California Road. Later this summer, RCTC will require a similar closure of the northbound 15 Rancho California Road loop on-ramp.</p>
<p>The Smart Freeway Pilot Project will use ramp meters that work as a coordinated system that adapts to allow more or fewer vehicles to enter I-15 at any given time from the Temecula Parkway, Rancho California Road, and Winchester Road on-ramps. The project is anticipated to improve overall traffic flow and reduce rear-end collisions within the I-15 corridor, without highway expansion and related construction costs and impacts.</p>
<p>For more information about the Smart Freeway Pilot Project and the Temecula Parkway on-ramp closure, visit: <a href="https://www.rctc.org/temeculaclosures/">rctc.org/temeculaclosures</a></p>
</div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/full-closure-15-northbound-rancho-california-road-on-ramp/">Plan Ahead! Extended Full Closure of the Rancho California Road Direct On-Ramp for Northbound I-15 Starts on July 13</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</title>
		<link>https://www.rctc.org/new-71-91-interchange-opens/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 23 Jun 2025 15:14:20 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[71/91 interchange]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[Measure A Successes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106999</guid>

					<description><![CDATA[<p>New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</p>
<p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Over the past two years, the residents of the Corona, Chino, and Chino Hills communities – and countless travelers on the 71 and 91 – have seen the impressive 71/91 connector take shape. After the recent weekend closure of the eastbound 91 Green River Rd. on-ramp, where crews safely performed a traffic switch to get the new connector and on-ramp ready for vehicles, the new interchange is now open to motorists!</p>
<p>Crews opened the new eastbound 91 to northbound 71 connector to highway traffic on Saturday morning, June 21, and the realigned on-ramp on Monday, June 23.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107035" data-options="width:2560,height:1440,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg'"><img decoding="async" class="wp-image-107035" src="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" width="2560" height="1440" alt="default" srcset="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1024x576.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-768x432.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1536x864.jpg 1536w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-2048x1152.jpg 2048w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-350x197.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-36x20.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-48x27.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-500x281.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-800x450.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1280x720.jpg 1280w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1920x1080.jpg 1920w" sizes="(max-width: 2560px) 100vw, 2560px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction of the <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> began in January 2023. As part of the project, crews built a new eastbound 91 to northbound 71 connector bridge that spans over the 91 and Santa Ana River. This new, two-lane direct connector replaces the old single-lane loop connector. The existing eastbound 91 Green River Rd. on-ramp was also realigned to provide direct access to the new northbound 71 connector and eastbound 91 general purpose lanes. Crews also constructed a new eastbound 91 auxiliary lane for improved access and merging with the new connector.</p>
<p>During construction, crews excavated 400,000 cubic yards of roadway, used over 9 million pounds of rebar, constructed over 4,000 cubic yards of retaining walls, and are expected to pour over 36,000 cubic yards of concrete by the end of the project. The new connector measures an impressive 100 feet in height and 2,500 feet in length.</p>
</div><div class="vc_row wideGallery row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107004" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-300x200.jpg'"><img decoding="async" class="wp-image-107004" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 Banner Web"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107006" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-300x200.jpg'"><img decoding="async" class="wp-image-107006" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 01"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The new, non-tolled connector is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, and enhance traffic flow – providing long-lasting benefits to Riverside County residents and the greater southern California region. The project will also support continued movement through this area by native wildlife such as mountain lions, bobcats, and coyotes.</p>
<p>Funding for the $137 million project was provided by federal, state, and local sources, including <a href="https://www.rctc.org/measure-a/">Measure A</a>; the twice voter-approved sales tax measure for transportation improvements in Riverside County. The delivery of this project further advances RCTC’s goal to improve mobility for the people of Riverside County.</p>
<p>For more information about this project, please visit: <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a></p>
</div></div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Help is on the Way! Award-Winning Freeway Service Patrol Drivers Aid Motorists in Need</title>
		<link>https://www.rctc.org/freeway-service-patrol-awards-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 28 Mar 2024 14:24:00 +0000</pubDate>
				<category><![CDATA[Celebration]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[FSP]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Safety]]></category>
		<category><![CDATA[awards]]></category>
		<category><![CDATA[commuters]]></category>
		<category><![CDATA[Freeway Service Patrol]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[safety]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=98398</guid>

					<description><![CDATA[<p>The Point: RCTC honored top FSP drivers who helped keep motorists safe in western Riverside County</p>
<p>The post <a href="https://www.rctc.org/freeway-service-patrol-awards-2024/">Help is on the Way! Award-Winning Freeway Service Patrol Drivers Aid Motorists in Need</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: RCTC honored top FSP drivers who helped keep motorists safe in western Riverside County</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Awards season is upon us! RCTC held the annual Drivers’ Award meeting to celebrate the top Freeway Service Patrol (FSP) drivers of 2023. The awards recognized five drivers who provided exceptional service to stranded motorists on the busiest highways in western Riverside County. The entire team of FSP drivers also received recognition for their daily efforts to help keep commuters moving and traffic flowing.</p>
<p>The Freeway Service Patrol – or FSP – is a partnership between RCTC, the California Highway Patrol, and Caltrans to help stranded motorists with quick roadside assistance. These rapid assists keep motorists safe and allow traffic to keep flowing during peak commute times. From flat tires and dead batteries to overheated engines and empty gas tanks, FSP drivers come to the rescue to make these repairs and more at no charge. If they can’t get you back on the road, they will tow your vehicle to a safer location off the freeway.</p>
<p>Without further ado, here are the FSP drivers who won top honors:</p>
</div><div class="uncode_text_column FSPawards text-lead" ></p>
<p style="text-align: center;"><strong><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3c6.png" alt="🏆" class="wp-smiley" style="height: 1em; max-height: 1em;" /> Carlos Castillo </strong>| Top Driver Award<br />
<strong><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3c6.png" alt="🏆" class="wp-smiley" style="height: 1em; max-height: 1em;" /> Alejandro Cotton </strong>| Driver of Excellence Award<br />
<strong><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3c6.png" alt="🏆" class="wp-smiley" style="height: 1em; max-height: 1em;" /> David Camberos </strong>| Driver of Excellence Award<br />
<strong><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3c6.png" alt="🏆" class="wp-smiley" style="height: 1em; max-height: 1em;" /> Robert Torres </strong>| People’s Choice Award<br />
<strong><img src="https://s.w.org/images/core/emoji/17.0.2/72x72/1f3c6.png" alt="🏆" class="wp-smiley" style="height: 1em; max-height: 1em;" /> Jonathon Moss </strong>| Rookie of the Year Award</p>
<p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading half-gutter" >
									<div id="gallery-400671" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-loop="true" data-dots="true" data-nav="true" data-navmobile="true" data-navskin="light" data-navspeed="400" data-autoplay="true" data-timeout="3000" data-stagepadding="0" data-lg="3" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-98407  tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 106.5%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award.jpg" class="pushed" aria-label="0324 C Castillo FSP Award"  data-active="1" data-lbox="ilightbox_gallery-400671" data-options="width:1100,height:1172,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-282x300.jpg'" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-98407" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award.jpg" width="1100" height="1172" alt="0324 C Castillo FSP Award" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award.jpg 1100w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-282x300.jpg 282w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-961x1024.jpg 961w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-768x818.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-500x533.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-800x852.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-350x373.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-34x36.jpg 34w, https://www.rctc.org/wp-content/uploads/2024/03/0324_C_Castillo_FSP_Award-45x48.jpg 45w" sizes="(max-width: 1100px) 100vw, 1100px" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Carlos Castillo</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-98406  tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 106.5%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award.jpg" class="pushed" aria-label="0324 A Cotton FSP Award"  data-active="1" data-lbox="ilightbox_gallery-400671" data-options="width:1100,height:1172,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-282x300.jpg'" data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-98406" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award.jpg" width="1100" height="1172" alt="0324 A Cotton FSP Award" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award.jpg 1100w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-282x300.jpg 282w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-961x1024.jpg 961w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-768x818.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-500x533.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-800x852.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-350x373.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-34x36.jpg 34w, https://www.rctc.org/wp-content/uploads/2024/03/0324_A_Cotton_FSP_Award-45x48.jpg 45w" sizes="(max-width: 1100px) 100vw, 1100px" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Alejandro Cotton</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-98408  tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 106.5%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award.jpg" class="pushed" aria-label="0324 D Camberos FSP Award"  data-active="1" data-lbox="ilightbox_gallery-400671" data-options="width:1100,height:1172,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-282x300.jpg'" data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-98408" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award.jpg" width="1100" height="1172" alt="0324 D Camberos FSP Award" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award.jpg 1100w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-282x300.jpg 282w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-961x1024.jpg 961w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-768x818.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-500x533.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-800x852.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-350x373.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-34x36.jpg 34w, https://www.rctc.org/wp-content/uploads/2024/03/0324_D_Camberos_FSP_Award-45x48.jpg 45w" sizes="(max-width: 1100px) 100vw, 1100px" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>David Camberos</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-98405  tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 106.5%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award.jpg" class="pushed" aria-label="0324 R Torres FSP Award"  data-active="1" data-lbox="ilightbox_gallery-400671" data-options="width:1100,height:1172,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-282x300.jpg'" data-lb-index="3"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-98405" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award.jpg" width="1100" height="1172" alt="0324 R Torres FSP Award" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award.jpg 1100w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-282x300.jpg 282w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-961x1024.jpg 961w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-768x818.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-500x533.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-800x852.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-350x373.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-34x36.jpg 34w, https://www.rctc.org/wp-content/uploads/2024/03/0324_R_Torres_FSP_Award-45x48.jpg 45w" sizes="(max-width: 1100px) 100vw, 1100px" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Robert Torres</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-98409  tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 106.5%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award.jpg" class="pushed" aria-label="0324 J Moss FSP Award"  data-active="1" data-lbox="ilightbox_gallery-400671" data-options="width:1100,height:1172,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-282x300.jpg'" data-lb-index="4"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-98409" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award.jpg" width="1100" height="1172" alt="0324 J Moss FSP Award" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award.jpg 1100w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-282x300.jpg 282w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-961x1024.jpg 961w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-768x818.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-500x533.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-800x852.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-350x373.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-34x36.jpg 34w, https://www.rctc.org/wp-content/uploads/2024/03/0324_J_Moss_FSP_Award-45x48.jpg 45w" sizes="(max-width: 1100px) 100vw, 1100px" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Jonathon Moss</span></p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p>FSP drivers make a substantial impact on the lives of western Riverside County motorists. In 2023 alone, the program helped over 56,000 county motorists that were stalled on local highways. The program was created in 1993 and marked 30 years of service in 2023 &#8211; assisting over a million motorists since its inception.</p>
<p>Motorist Alfonso R. shared some kind words about Carlos Castillo, this year’s Top Driver. “Carlos Castillo was incredibly helpful. Extremely safe. And very efficient. Thank you, Carlos, for helping me and my family! The service was amazing!” he said.</p>
<p>Driver of Excellence awardee David Camberos was also praised. Jenna G. said David, “was such a blessing. Saw us on the road and immediately helped. He was very kind, knowledgeable, and provided calmness in our chaos.”</p>
<p>And, of course, the People’s Choice winner, Robert Torres, received his share of praise from the public. Motorist Kayla J. had this to say, “Over the top professional and very helpful, if I were to get help again, I would love for Robert to be the one to help us.” Motorist Daniel T. shared, “Beyond exceptional professionalism, I was back on the road in less than five minutes. Robert was very helpful and had an immediate solution to my situation at hand.”</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 77%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-98403" src="https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story.jpg" width="2000" height="1153" alt="0324 The Point FSP Driver Story" srcset="https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story.jpg 2000w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-300x173.jpg 300w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-1024x590.jpg 1024w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-768x443.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-1536x886.jpg 1536w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-500x288.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-800x461.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-1280x738.jpg 1280w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-1920x1107.jpg 1920w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-350x202.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2024/03/0324_The_Point_FSP_Driver_Story-48x28.jpg 48w" sizes="(max-width: 2000px) 100vw, 2000px" /></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The Riverside County FSP program is ranked as one of the highest benefit/cost FSP programs across the state, meaning that it provides a lot of bang for the buck. The program is funded by Caltrans and RCTC and operates on the 91, on I-15 between the 60 and the 79, on the 60 from I-15 to Theodore Street, and the full length of I-215.</p>
<p>FSP operates Monday through Friday (except on some holidays) from 6:00 a.m. to 8:30 a.m. for the morning commute and from 1:30 p.m. to 6:00 p.m. for the afternoon commute. Friday afternoon service operates from 11:30 a.m. to 6:00 p.m. FSP also operates mid-day service and weekend service on select beats.</p>
<p>To learn more about this popular program, visit <a href="https://www.rctc.org/fsp" target="_blank" rel="noopener">www.rctc.org/fsp</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/freeway-service-patrol-awards-2024/">Help is on the Way! Award-Winning Freeway Service Patrol Drivers Aid Motorists in Need</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Route 60 Truck Lanes: A Construction Achievement</title>
		<link>https://www.rctc.org/route-60-truck-lanes-a-construction-achievement/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 27 Jun 2022 16:12:36 +0000</pubDate>
				<category><![CDATA[Coachella Valley]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[State Route 60]]></category>
		<category><![CDATA[Badlands]]></category>
		<category><![CDATA[Caltrans]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Route 60 Truck Lanes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=84881</guid>

					<description><![CDATA[<p>The Point: Ribbon-cutting ceremony saluted hardworking crews and project delivery partners</p>
<p>The post <a href="https://www.rctc.org/route-60-truck-lanes-a-construction-achievement/">Route 60 Truck Lanes: A Construction Achievement</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point:  Ribbon-cutting ceremony saluted hardworking crews and project delivery partners </strong></p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row vc_custom_1651707063312 row-container" style="margin-top: -50px ;" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>With the snip of a shiny purple ribbon on June 2, RCTC celebrated the opening of the Route 60 Truck Lanes, which now offer a safer and more efficient way to travel between the Coachella Valley and western Riverside County.</p>
<p>The eastbound truck-climbing lane and the westbound truck-descending lane opened May 20, ahead of schedule and within budget. RCTC began building the $138 million project in June 2019, with Caltrans providing design and construction oversight.</p>
<p>The lanes stretch 4.5 miles – from Gilman Springs Road to 1.4 miles west of Jack Rabbit Trail – between Moreno Valley and Beaumont through the formerly treacherous “Badlands.” Built next to the outer shoulders in both directions, the truck lanes separate slower-moving and faster-moving vehicles.</p>
<p>RCTC Chair V. Manuel Perez, who also is the Riverside County 4th District Supervisor, explained, “This project will provide a huge boost for the Coachella Valley tourism industry. This is a big deal for public safety reasons, a big deal for tourism reasons.”</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<iframe width="560" height="315" src="https://www.youtube.com/embed/F3Nwp4JN8iQ" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture" allowfullscreen></iframe>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>With the opening of the Route 60 Truck Lanes in May and the opening of the I-15 Railroad Canyon Interchange in Lake Elsinore in April, Perez noted that 2022 is shaping up to be a strong year for RCTC project delivery. The I-215 Placentia Avenue Interchange in Perris is scheduled to open later this year.</p>
<p>Highway construction projects are not easy to deliver. The 60 Truck Lanes Project was a collaboration between RCTC, Caltrans, project management consultants, and contractors, with a healthy dose of support from motorists who were able to see the project take shape during the past three years. All of these groups were recognized and celebrated during the ceremony.</p>
<p>Project closeout work will continue, with nighttime lane closures required. Please follow <a href="http://www.facebook.com/60trucklanes" target="_blank" rel="noopener">@60trucklanes</a> on social media or visit the project website, <a href="https://www.rctc.org/60trucklanes" target="_blank" rel="noopener">rctc.org/60trucklanes</a>, for updates. In addition, please follow <a href="http://www.facebook.com/therctc" target="_blank" rel="noopener">@theRCTC</a> on social media for ongoing transportation news throughout Riverside County.</p>
</div></div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/route-60-truck-lanes-a-construction-achievement/">Route 60 Truck Lanes: A Construction Achievement</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New Route 60 Truck Lanes Open May 20 in Riverside County’s Badlands</title>
		<link>https://www.rctc.org/route-60-truck-lanes-opening/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 19 May 2022 15:46:17 +0000</pubDate>
				<category><![CDATA[Coachella Valley]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[State Route 60]]></category>
		<category><![CDATA[Badlands]]></category>
		<category><![CDATA[Caltrans]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Route 60 Truck Lanes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=83662</guid>

					<description><![CDATA[<p>The Point: New lanes offer a safer, more efficient way to travel between the Coachella Valley and western Riverside County</p>
<p>The post <a href="https://www.rctc.org/route-60-truck-lanes-opening/">New Route 60 Truck Lanes Open May 20 in Riverside County’s Badlands</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-18"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: New lanes offer a safer, more efficient way to travel between the Coachella Valley and western Riverside County</strong></p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-18" data-row="script-row-unique-18" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-18"));</script></div></div></div><div data-parent="true" class="vc_row vc_custom_1651707063312 row-container" style="margin-top: -50px ;" id="row-unique-19"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Traveling between the desert and western Riverside County is safer and easier with the opening of the Riverside County Transportation Commission’s Route 60 Truck Lanes in the Badlands.</p>
<p>RCTC began construction of the $138 million highway investment in June 2019 with Caltrans providing design and construction oversight. The new lanes opened on time and within budget.</p>
<p>“This project has fully transformed the Route 60 corridor from a narrow, winding roadway to one that is wide open, safe, and a great new way to drive between the Coachella Valley and western Riverside County,” said RCTC Chair and Riverside County 4th District Supervisor V. Manuel Perez. “RCTC’s investment in Route 60 has provided a stronger way to connect our residents,” he said.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83670" src="https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT.jpg" width="1856" height="1044" alt="60TL Screencap EDIT" srcset="https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT.jpg 1856w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-300x169.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-1024x576.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-768x432.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-1536x864.jpg 1536w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-36x20.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_Screencap_EDIT-48x27.jpg 48w" sizes="(max-width: 1856px) 100vw, 1856px" /></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The project added an eastbound truck-climbing lane and a westbound truck-descending lane for 4.5 miles between Gilman Springs Road and 1.4 miles west of Jack Rabbit Trail. Built next to the outer shoulders in both directions of Route 60, the truck lanes help separate slower-moving big-rigs from passenger vehicles that can use the two left lanes in both directions.</p>
<p>In addition to adding the truck lanes, the project widened the inner and outer shoulders and excavated 2.1 million cubic yards of dirt from the steep hillsides to add another 30 feet next to the outer shoulders. The wider shoulders and open space provide safe pullout areas for motorists and emergency responders. The project also flattened the curving roadway to improve sight distance for drivers, another safety benefit.</p>
<p>Animals have a safer way to cross Route 60 as well, thanks to the construction of two 20-foot by 20-foot by 200-foot wildlife crossings and extension of culverts that allow coyotes, bobcats, mountain lions, deer, and other animals to travel beneath the highway to seek food and mates. The crossings also help prevent collisions between motorists and animals.</p>
</div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83665" src="https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1.jpg" width="2200" height="1238" alt="60TL WildlifeCrossings1" srcset="https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1.jpg 2200w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-300x169.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-1024x576.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-768x432.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-1536x864.jpg 1536w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-2048x1152.jpg 2048w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-36x20.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/60TL_WildlifeCrossings1-48x27.jpg 48w" sizes="(max-width: 2200px) 100vw, 2200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83673" src="https://www.rctc.org/wp-content/uploads/2022/05/0522_Bobcat_Crossing.gif" width="1440" height="810" alt="0522 Bobcat Crossing"></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Funding was provided by a combination of federal, state, and local sources and employed approximately 1,400 workers.</p>
<p>See our other project facts and figures:</p>
<ul>
<li>Crews installed 123 drainage systems with 15,000 feet of pipe</li>
<li>A 2,200 foot-long retaining wall was built using 60,000 blocks that support up to 3,750 tons of weight</li>
<li>A total of 155,000 cubic yards of concrete was used for the top layer of the lanes.</li>
</ul>
<p>Closeout work will continue during the weeks ahead with nighttime lane closures likely. Please continue to follow <a href="https://www.facebook.com/60TruckLanes/" target="_blank" rel="noopener">@60trucklanes</a> on social media or visit the project website, <a href="https://www.rctc.org/projects/route-60-truck-lanes/">rctc.org/60trucklanes</a> for updates.</p>
</div></div></div></div></div></div><script id="script-row-unique-19" data-row="script-row-unique-19" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-19"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-20"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-20" data-row="script-row-unique-20" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-20"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/route-60-truck-lanes-opening/">New Route 60 Truck Lanes Open May 20 in Riverside County’s Badlands</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Crews, K-rail, and Trucks are Ready! Construction to Start this Month to Add Southbound Lane to Interstate 15</title>
		<link>https://www.rctc.org/i15-icop-begins-construction/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 16 May 2022 14:00:26 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[15]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Temescal Valley]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=83443</guid>

					<description><![CDATA[<p>The Point: Sign up to stay informed of work this spring and summer</p>
<p>The post <a href="https://www.rctc.org/i15-icop-begins-construction/">Crews, K-rail, and Trucks are Ready! Construction to Start this Month to Add Southbound Lane to Interstate 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-21"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Sign up to stay informed of work this spring and summer</strong></p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-21" data-row="script-row-unique-21" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-21"));</script></div></div></div><div data-parent="true" class="vc_row vc_custom_1651707063312 row-container" style="margin-top: -50px ;" id="row-unique-22"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Construction is just around the corner for a new lane on southbound Interstate 15 in Corona and Temescal Valley.</p>
<p>Work is scheduled to start the second half of May on RCTC’s <a href="https://www.rctc.org/15icop">I-15 Interim Corridor Operations Project</a>, which will add a non-tolled lane from the Cajalco Road on-ramp to the Weirick Road off-ramp, next to the outer shoulder.</p>
<p>The highway is wide enough to accommodate the new lane, and crews will strengthen the shoulder pavement to handle the weight of traveling vehicles and restripe the lanes. Once completed, southbound I-15 in this area will include four lanes.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-82367" src="https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map.png" width="1646" height="1030" alt="15 ICOP MAP" srcset="https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map.png 1646w, https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map-300x188.png 300w, https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map-1024x641.png 1024w, https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map-768x481.png 768w, https://www.rctc.org/wp-content/uploads/2022/03/15-ICOP-map-1536x961.png 1536w" sizes="(max-width: 1646px) 100vw, 1646px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>RCTC approved a construction contract this spring. The new lane is anticipated to open in three to four months, with financial incentives for the contractor to complete work ahead of schedule.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83462" src="https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop.png" width="940" height="498" alt="0522 15 ICOP Point Article Crop" srcset="https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop.png 940w, https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop-300x159.png 300w, https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop-768x407.png 768w, https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop-24x13.png 24w, https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop-36x19.png 36w, https://www.rctc.org/wp-content/uploads/2022/05/0522_15_ICOP_Point_Article_Crop-48x25.png 48w" sizes="(max-width: 940px) 100vw, 940px" /></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Although the lane addition is less than one mile, it is expected to help relieve traffic congestion where the 15 Express Lanes end at Cajalco Road. It also will:</p>
<ul>
<li>Add space for emergency vehicles along the inner shoulder</li>
<li>Add or upgrade guardrails</li>
<li>Improve drainage systems</li>
<li>Install new overhead signs</li>
</ul>
<p>With construction coming soon, drivers will be seeing k-rail, reduced lane and shoulder widths, construction signs, and equipment. Please watch for nighttime lane and ramp closures and follow the 55 mile per hour speed limit in the project area.</p>
<p>Sign up for alerts below or text <strong>15iCOP </strong>to (844) 771-0995 for text message alerts. Make sure to follow us at <a href="http://www.facebook.com/therctc">@theRCTC</a> on social media for project updates too.</p>
</div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-3 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><noscript class="ninja-forms-noscript-message">
	Notice: JavaScript is required for this content.</noscript>
<div id="nf-form-33-cont" class="nf-form-cont" aria-live="polite" aria-labelledby="nf-form-title-33" aria-describedby="nf-form-errors-33" role="form">

    <div class="nf-loading-spinner"></div>

</div>
        <!-- That data is being printed as a workaround to page builders reordering the order of the scripts loaded-->
        <script>var formDisplay=1;var nfForms=nfForms||[];var form=[];form.id='33';form.settings={"ninjaForms":"Ninja Forms","changeEmailErrorMsg":"Please enter a valid email address.","changeDateErrorMsg":"Please enter a valid date!","confirmFieldErrorMsg":"These fields must match!","fieldNumberNumMinError":"Please enter a number that is not below the minimum.","fieldNumberNumMaxError":"Please enter a number that is not above the maximum.","fieldNumberIncrementBy":"Please increment by %s","fieldTextareaRTEInsertLink":"Insert Link","fieldTextareaRTEInsertMedia":"Insert Media","fieldTextareaRTESelectAFile":"Select a file","fieldsTermsAdd":"Add New","fieldsTermsNewName":"New term name","tableInsertRowAbove":"Insert Row Above","tableInsertRowBelow":"Insert Row Below","tableInsertColumnLeft":"Insert Column Left","tableInsertColumnRight":"Insert Column Right","tableDeleteRow":"Delete Row","tableDeleteColumn":"Delete Column","tableDeleteTable":"Delete Table","tableLegacyNotice":"This content has tables in the old editor format. Custom styles are preserved until converted. Editing will update to the new format.","tableLegacyConvert":"Convert Now","tableInsertTable":"Insert Table","dismiss":"Dismiss","insertLink":"Insert Link","formErrorsCorrectErrors":"Please correct errors before submitting this form.","formHoneypot":"If you are a human seeing this field, please leave it empty.","validateRequiredField":"This is a required field.","honeypotHoneypotError":"This form could not be submitted. Please reload the page and try again.","fileUploadOldCodeFileUploadInProgress":"File Upload in Progress.","fileUploadOldCodeFileUpload":"File Upload","currencySymbol":"&#36;","fieldsMarkedRequired":"Fields marked with an <span class=\"ninja-forms-req-symbol\">*<\/span> are required","thousands_sep":",","decimal_point":".","siteLocale":"en_US","dateFormat":"m\/d\/Y","startOfWeek":"1","of":"%1$s of %2$s","previousMonth":"Previous Month","nextMonth":"Next Month","months":["January","February","March","April","May","June","July","August","September","October","November","December"],"monthsShort":["Jan","Feb","Mar","Apr","May","Jun","Jul","Aug","Sep","Oct","Nov","Dec"],"weekdays":["Sunday","Monday","Tuesday","Wednesday","Thursday","Friday","Saturday"],"weekdaysShort":["Sun","Mon","Tue","Wed","Thu","Fri","Sat"],"weekdaysMin":["Su","Mo","Tu","We","Th","Fr","Sa"],"recaptchaConsentMissing":"reCAPTCHA validation couldn&#039;t load.","recaptchaMissingCookie":"reCaptcha v3 validation couldn&#039;t load the cookie needed to submit the form.","recaptchaConsentEvent":"Accept reCAPTCHA cookies before sending the form.","hourPlaceholder":"Hour","minutePlaceholder":"Minute","am":"AM","pm":"PM","paypalCancelled":"The PayPal payment was cancelled. Your form has not been sent \u2014 you can approve the payment to finish.","paypalError":"PayPal couldn&#039;t complete your payment. You have not been charged. Please try again.","paypalNoMethods":"No PayPal payment method is available for this payment. Your form has not been sent.","paypalTestApprove":"Approve test payment","paypalApprovalNeeded":"Almost done! Select your preferred payment option below to complete your payment.","paypalApprovalRegion":"PayPal payment approval","objectType":"Form Setting","editActive":true,"title":"I-15 Interim Corridor Operations Project (Updates)","created_at":"2022-05-10 10:19:44","default_label_pos":"above","show_title":"1","clear_complete":"1","hide_complete":"1","logged_in":"","wrapper_class":"","element_class":"","key":"","add_submit":"0","currency":"","unique_field_error":"A form with this value has already been submitted.","not_logged_in_msg":"","sub_limit_msg":"The form has reached its submission limit.","calculations":[],"formContentData":[{"order":1,"cells":[{"order":0,"fields":["i_would_like_to_1597358092118"],"width":"100"}]},{"order":2,"cells":[{"order":0,"fields":["first_name_1652140513631"],"width":"100"}]},{"order":3,"cells":[{"order":0,"fields":["last_name_1652140497534"],"width":"100"}]},{"order":4,"cells":[{"order":0,"fields":["email_1586528674554"],"width":"100"}]},{"order":5,"cells":[{"order":0,"fields":["phone_1586528680898"],"width":"100"}]},{"order":6,"cells":[{"order":0,"fields":["zip_1597358929820"],"width":"100"}]},{"order":7,"cells":[{"order":0,"fields":["html_1597358195143"],"width":"100"}]},{"order":8,"cells":[{"order":0,"fields":["message_1586529035788"],"width":"100"}]},{"order":9,"cells":[{"order":0,"fields":["submit_request_1652198460874"],"width":"100"}]}],"container_styles_show_advanced_css":"0","title_styles_show_advanced_css":"0","row_styles_show_advanced_css":"0","row-odd_styles_show_advanced_css":"0","success-msg_styles_show_advanced_css":"0","error_msg_styles_show_advanced_css":"0","conditions":[{"collapsed":false,"process":1,"connector":"all","when":[{"connector":"AND","key":"i_would_like_to_1597358092118","comparator":"contains","value":"Subscribe to RCTCs e-newsletter The Point.","type":"field","modelType":"when"}],"then":[{"key":183,"trigger":"activate_action","value":"","type":"action","modelType":"then"}],"else":[{"key":183,"trigger":"deactivate_action","type":"action","modelType":"else"}]}],"drawerDisabled":false,"repeatable_fieldsets":"","allow_public_link":0,"embed_form":"","currency_symbol":"","beforeForm":"","beforeFields":"","afterFields":"","afterForm":""};form.fields=[{"objectType":"Field","objectDomain":"fields","editActive":false,"order":1,"idAttribute":"id","type":"listcheckbox","label":"I WOULD LIKE TO: ","key":"i_would_like_to_1597358092118","label_pos":"above","required":1,"options":[{"errors":[],"max_options":0,"label":"Receive construction updates and information about the I-15 Interim Corridor Operations Project.","value":"Receive construction updates and information about the I-15 Interim Corridor Operations Project.","calc":"","selected":0,"order":0,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"order":1,"new":false,"options":[],"label":"Subscribe to RCTC\u2019s e-newsletter, The Point.","value":"Subscribe to RCTCs e-newsletter The Point.","calc":"","selected":0,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"label":"Have a project representative contact me about speaking to my organization.","value":"Have a project representative contact me about speaking to my organization.","calc":"","selected":0,"order":2,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"label":"Request help with my question\/comment (see message box below).","value":"Request help with my question or comment","calc":"","selected":0,"order":3,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true}],"container_class":"","element_class":"","admin_label":"","help_text":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"list_item_row_styles_border":"","list_item_row_styles_height":"","list_item_row_styles_width":"","list_item_row_styles_font-size":"","list_item_row_styles_margin":"","list_item_row_styles_padding":"","list_item_row_styles_float":"","list_item_row_styles_show_advanced_css":0,"list_item_label_styles_border":"","list_item_label_styles_height":"","list_item_label_styles_width":"","list_item_label_styles_font-size":"","list_item_label_styles_margin":"","list_item_label_styles_padding":"","list_item_label_styles_float":"","list_item_label_styles_show_advanced_css":0,"list_item_element_styles_border":"","list_item_element_styles_height":"","list_item_element_styles_width":"","list_item_element_styles_font-size":"","list_item_element_styles_margin":"","list_item_element_styles_padding":"","list_item_element_styles_float":"","list_item_element_styles_show_advanced_css":0,"cellcid":"c4656","drawerDisabled":false,"field_label":"I WOULD LIKE TO: ","field_key":"i_would_like_to_1597358092118","id":367,"beforeField":"","afterField":"","value":"","parentType":"list","element_templates":["listcheckbox","input"],"old_classname":"list-checkbox","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":2,"idAttribute":"id","cellcid":"c4660","field_label":"First Name","field_key":"first_name_1652140513631","label":"First Name","type":"firstname","label_pos":"hidden","key":"first_name_1652140513631","required":1,"default":"","placeholder":"First Name*","container_class":"one-half first","element_class":"","admin_label":"","help_text":"","custom_name_attribute":"fname","personally_identifiable":1,"value":"","drawerDisabled":"","wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":361,"beforeField":"","afterField":"","parentType":"firstname","element_templates":["firstname","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":3,"idAttribute":"id","label_styles_padding":"","label_styles_font-size":"","label_styles_margin":"","label_styles_border":"","label_styles_width":"","wrap_styles_float":"","wrap_styles_padding":"","wrap_styles_margin":"","wrap_styles_width":"","wrap_styles_border":"","element_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"wrap_styles_show_advanced_css":0,"value":"","drawerDisabled":"","personally_identifiable":1,"custom_name_attribute":"fname","help_text":"","admin_label":"","element_class":"","container_class":"one-half second","placeholder":"Last Name*","default":"","required":1,"key":"last_name_1652140497534","label_pos":"hidden","type":"firstname","label":"Last Name","field_key":"last_name_1652140497534","field_label":"Last Name","cellcid":"c4663","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":364,"beforeField":"","afterField":"","parentType":"firstname","element_templates":["firstname","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":4,"idAttribute":"id","custom_name_attribute":"email","help_text":"","admin_label":"","element_class":"","container_class":"one-third first","placeholder":"Email*","default":"","required":1,"label_pos":"hidden","key":"email_1586528674554","label":"Email","type":"email","personally_identifiable":1,"value":"","drawerDisabled":"","wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4666","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","field_label":"Email","field_key":"email_1586528674554","id":362,"beforeField":"","afterField":"","parentType":"email","element_templates":["email","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":5,"idAttribute":"id","type":"phone","label":"Phone","key":"phone_1586528680898","label_pos":"hidden","required":"","default":"","placeholder":"Mobile Phone","container_class":"one-third second","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":"","admin_label":"","help_text":"","mask":"","custom_mask":"","custom_name_attribute":"phone","personally_identifiable":1,"value":"","drawerDisabled":"","wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4669","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","field_label":"Phone","field_key":"phone_1586528680898","id":363,"beforeField":"","afterField":"","parentType":"textbox","element_templates":["tel","textbox","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":6,"idAttribute":"id","type":"zip","label":"Zip","key":"zip_1597358929820","label_pos":"hidden","required":"","default":"","placeholder":"Zip","container_class":"one-third third","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":"","admin_label":"","help_text":"","mask":"","custom_mask":"","custom_name_attribute":"zip","personally_identifiable":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"cellcid":"c4672","value":"","drawerDisabled":"","field_label":"Zip","field_key":"zip_1597358929820","id":369,"beforeField":"","afterField":"","parentType":"zip","element_templates":["zip","textbox","input","textbox","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":7,"idAttribute":"id","type":"html","label":"HTML","default":"<sup><em>By providing your mobile phone number, you consent to receiving construction updates by text message. Text messaging rates from your mobile carrier will apply.<\/em><\/sup>","container_class":"","element_class":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"cellcid":"c4675","key":"html_1597358195143","drawerDisabled":false,"field_label":"HTML","field_key":"html_1597358195143","id":368,"beforeField":"","afterField":"","value":"<sup><em>By providing your mobile phone number, you consent to receiving construction updates by text message. Text messaging rates from your mobile carrier will apply.<\/em><\/sup>","label_pos":"above","parentType":"html","element_templates":["html","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":8,"idAttribute":"id","type":"textarea","label":"Message","key":"message_1586529035788","label_pos":"hidden","required":"","default":"","placeholder":"Message","container_class":"","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":"","admin_label":"","help_text":"","textarea_rte":"","disable_rte_mobile":"","textarea_media":"","value":"","drawerDisabled":"","wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4678","field_label":"Message","field_key":"message_1586529035788","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":365,"beforeField":"","afterField":"","parentType":"textarea","element_templates":["textarea","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":9,"idAttribute":"id","type":"submit","label":"Submit Request","processing_label":"Processing","container_class":"","element_class":"","key":"submit_request_1652198460874","drawerDisabled":"","wrap_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"submit_element_hover_styles_show_advanced_css":0,"cellcid":"c4681","field_label":"Submit Request","field_key":"submit_request_1652198460874","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","submit_element_hover_styles_border":"","submit_element_hover_styles_width":"","submit_element_hover_styles_font-size":"","submit_element_hover_styles_margin":"","submit_element_hover_styles_padding":"","submit_element_hover_styles_float":"","id":366,"beforeField":"","afterField":"","value":"","label_pos":"above","parentType":"textbox","element_templates":["submit","button","input"],"old_classname":"","wrap_template":"wrap-no-label"}];nfForms.push(form);</script>
                <script id="nf-tmpl-cell" type="text/template">
            <nf-fields></nf-fields>
        </script>

        <script id="nf-tmpl-row" type="text/template">
            <nf-cells></nf-cells>
        </script>

        </div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-3 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Also, please note that this temporary lane will be in place for three to four years. RCTC and project partners are working on engineering and environmental studies for the <a href="https://www.rctc.org/projects/interstate-15-corridor-operations-project/" target="_blank" rel="noopener">Interstate 15 Corridor Operations Project</a>, which will add a permanent lane to this section of southbound I-15, create wider lanes and shoulders, modify the southbound I-15 Cajalco Road on-ramp and Weirick Road off-ramp, widen the Bedford Wash Bridge, build retaining walls, and improve drainage.</p>
</div></div></div></div></div></div><script id="script-row-unique-22" data-row="script-row-unique-22" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-22"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-23"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-23" data-row="script-row-unique-23" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-23"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/i15-icop-begins-construction/">Crews, K-rail, and Trucks are Ready! Construction to Start this Month to Add Southbound Lane to Interstate 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Freeway Service Patrol Drivers Go Beyond the Call of Duty</title>
		<link>https://www.rctc.org/2022-fsp-awards/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 07 Apr 2022 21:40:25 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[FSP]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[2021]]></category>
		<category><![CDATA[awards]]></category>
		<category><![CDATA[Freeway Service Patrol]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[motorist]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=82645</guid>

					<description><![CDATA[<p>The Point:  RCTC honors FSP drivers who have helped thousands of motorists in western Riverside County</p>
<p>The post <a href="https://www.rctc.org/2022-fsp-awards/">Freeway Service Patrol Drivers Go Beyond the Call of Duty</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-24"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: RCTC honors FSP drivers who have helped thousands of motorists in western Riverside County<br />
</strong></p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-24" data-row="script-row-unique-24" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-24"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-25"><div class="row one-top-padding single-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Awards season is upon us. Locally, RCTC rolled out the red carpet in late March to celebrate Freeway Service Patrol drivers who provided exceptional service to motorists on our busiest Riverside County highways.</p>
<p>A partnership between RCTC, the California Highway Patrol, and Caltrans, the Freeway Service Patrol program – or FSP &#8212; helps stranded motorists by quickly providing roadside assistance. This helps traffic flow safely in western Riverside County.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 half-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 50%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-67981" src="https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo.jpg" width="350" height="349" alt="RCTC Freeway Service Patrol Logo" srcset="https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo.jpg 350w, https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo-300x300.jpg 300w, https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo-45x45.jpg 45w, https://www.rctc.org/wp-content/uploads/2018/05/fsp_logo-100x100.jpg 100w" sizes="(max-width: 350px) 100vw, 350px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-25" data-row="script-row-unique-25" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-25"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-26"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Get a flat tire, need a battery jump, or did your car overheat? FSP drivers come to the rescue at no charge to make these speedy repairs and more. If they can’t get you back on the road, they will tow your vehicle to a designated CHP location.</p>
<p><strong>Now, without further ado…the envelopes please!<br />
</strong>• In the Top Driver Award category, the award goes to Alexandro Alvarado of Coastal PrideTowing.<br />
• In the Driver of Excellence category, John Materne of Pepe&#8217;s Towing won top honors.<br />
• Carlos Castillo Jr. of Royal Coaches won top honors in the Driver of Excellence category.<br />
• The Rookie of the Year award went to Manuel Gebara Jr. of Pepe&#8217;s Towing.<br />
• And the People’s Choice award was presented to David Camberos of Pepe&#8217;s Towing</p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-122264" class="owl-carousel owl-element owl-height-auto" data-navmobile="false" data-navspeed="400" data-autoplay="true" data-timeout="3000" data-stagepadding="0" data-lg="5" data-md="5" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-middle tmb-overlay-text-left tmb-image-anim tmb-bordered tmb-id-82663  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 133.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit.png"  class="pushed" data-active="1" data-lbox="ilightbox_gallery-122264" data-options="width:1512,height:2016,thumbnail: 'https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit-225x300.png'" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-82663" src="https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit.png" width="1512" height="2016" alt="A. Alvarado" srcset="https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit.png 1512w, https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit-225x300.png 225w, https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit-768x1024.png 768w, https://www.rctc.org/wp-content/uploads/2022/04/A.-Alvarado-1-edit-1152x1536.png 1152w" sizes="(max-width: 1512px) 100vw, 1512px" /></a></div>
					</div>
				</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-middle tmb-overlay-text-left tmb-image-anim tmb-bordered tmb-id-82664  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 133.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-scaled.jpg"  class="pushed" data-active="1" data-lbox="ilightbox_gallery-122264" data-options="width:1920,height:2560,thumbnail: 'https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-225x300.jpg'" data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-82664" src="https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-scaled.jpg" width="1920" height="2560" alt="J. Materne" srcset="https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-scaled.jpg 1920w, https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-225x300.jpg 225w, https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-768x1024.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-1152x1536.jpg 1152w, https://www.rctc.org/wp-content/uploads/2022/04/J.-Materne-1536x2048.jpg 1536w" sizes="(max-width: 1920px) 100vw, 1920px" /></a></div>
					</div>
				</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-middle tmb-overlay-text-left tmb-image-anim tmb-bordered tmb-id-82651  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 133.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3.jpg"  class="pushed" data-active="1" data-lbox="ilightbox_gallery-122264" data-options="width:1512,height:2016,thumbnail: 'https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3-225x300.jpg'" data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-82651" src="https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3.jpg" width="1512" height="2016" alt="M. Gebara 3" srcset="https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3.jpg 1512w, https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3-225x300.jpg 225w, https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3-768x1024.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/04/M.-Gebara-3-1152x1536.jpg 1152w" sizes="(max-width: 1512px) 100vw, 1512px" /></a></div>
					</div>
				</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-middle tmb-overlay-text-left tmb-image-anim tmb-bordered tmb-id-82665  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 133.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-scaled.jpg"  class="pushed" data-active="1" data-lbox="ilightbox_gallery-122264" data-options="width:1920,height:2560,thumbnail: 'https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-225x300.jpg'" data-lb-index="3"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-82665" src="https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-scaled.jpg" width="1920" height="2560" alt="D. Camberos" srcset="https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-scaled.jpg 1920w, https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-225x300.jpg 225w, https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-768x1024.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-1152x1536.jpg 1152w, https://www.rctc.org/wp-content/uploads/2022/04/D.-Camberos-1536x2048.jpg 1536w" sizes="(max-width: 1920px) 100vw, 1920px" /></a></div>
					</div>
				</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-middle tmb-overlay-text-left tmb-image-anim tmb-bordered tmb-id-82650  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 133.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2.jpg"  class="pushed" data-active="1" data-lbox="ilightbox_gallery-122264" data-options="width:1512,height:2016,thumbnail: 'https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2-225x300.jpg'" data-lb-index="4"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-82650" src="https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2.jpg" width="1512" height="2016" alt="C. Castillo 2" srcset="https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2.jpg 1512w, https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2-225x300.jpg 225w, https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2-768x1024.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/04/C.-Castillo-2-1152x1536.jpg 1152w" sizes="(max-width: 1512px) 100vw, 1512px" /></a></div>
					</div>
				</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p>FSP drivers affect the lives of western Riverside County motorists every day. Sherry W. rated John Materne “an 11 out of 10,” noting that she “had a tire blow out and had pulled over with cars zipping by me. He saw me and pulled up behind me, gave me the brochure and offered to change my tire. He did so quickly and efficiently. I was in a dangerous area and was so thankful.”</p>
<p><img decoding="async" class="wp-image-79049 alignleft" title="Freeway Safety Patrol 2017 -24" src="https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-1024x683.jpg" alt="" width="350" height="233" srcset="https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-1024x683.jpg 1024w, https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-300x200.jpg 300w, https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-768x512.jpg 768w, https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-1536x1024.jpg 1536w, https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-2048x1365.jpg 2048w, https://www.rctc.org/wp-content/uploads/2021/05/Freeway-Safety-Patrol-2017-24-scaled.jpg 2560w" sizes="(max-width: 350px) 100vw, 350px" /></p>
<p>The Riverside County FSP program is ranked as one of the highest benefit/cost FSP programs in the state and is funded by Caltrans and RCTC, with additional funding from the Mobile Source Air Pollution Reduction for weekend service. FSP operates Monday through Friday (except on some holidays) from 5:30 a.m. to 8:30 a.m. for the morning commute and from 2:30 p.m. to 6:30 p.m. for the afternoon commute. Friday afternoon service operates from 12:30 p.m. to 6:30 p.m. Midday and weekend service is also available on select highway segments.</p>
<p>FSP in Riverside County operates on the 91, on I-15 between the 60 and the 79, on the 60 from I-15 to Theodore Street, and on the full length of I-215.</p>
<p>For more information about the FSP program, visit <a href="https://www.rctc.org/fsp">www.rctc.org/fsp</a></p>
</div></div></div></div></div></div><script id="script-row-unique-26" data-row="script-row-unique-26" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-26"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-27"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-27" data-row="script-row-unique-27" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-27"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/2022-fsp-awards/">Freeway Service Patrol Drivers Go Beyond the Call of Duty</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Inland Empire Caucus Seeks Transportation Project Funding from State of California</title>
		<link>https://www.rctc.org/inland-empire-caucus-seeks-transportation-project-funding-from-state-of-california/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 25 Feb 2022 00:02:28 +0000</pubDate>
				<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Funding]]></category>
		<category><![CDATA[I-10]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Banning]]></category>
		<category><![CDATA[Bypass]]></category>
		<category><![CDATA[Cabazon]]></category>
		<category><![CDATA[coachella]]></category>
		<category><![CDATA[Grade Separation]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[riverside]]></category>
		<category><![CDATA[Third Street]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=82278</guid>

					<description><![CDATA[<p>The Point: Legislators request funds for local projects to provide immediate mobility solutions</p>
<p>The post <a href="https://www.rctc.org/inland-empire-caucus-seeks-transportation-project-funding-from-state-of-california/">Inland Empire Caucus Seeks Transportation Project Funding from State of California</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-28"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Legislators request funds for local projects to provide immediate mobility solutions</strong></p>
</div><div class="uncode_text_column text-lead" ><p>Seventeen California senators and assemblymembers who comprise the Inland Empire Caucus called on Governor Gavin Newsom, Senate President Pro Tem Toni Atkins, and Assembly Speaker Anthony Rendon earlier this year to fund projects in Riverside and San Bernardino counties. This funding would provide much-needed relief to the region’s transportation network.</p>
<p>The request was made as the Legislature and Governor begin discussions to formulate the 2022-23 state budget.</p>
<p>Under the leadership of Senator Rosilicie Ochoa Bogh, Chair of the Inland Empire Caucus, the legislators sent a letter on January 6 to request $2.2 billion in budget funding to deliver key transportation infrastructure projects in the two-county region, which has experienced dramatic population and goods movement growth during recent years. The convergence of this growth creates daily competition for limited space on our roadways between semi-trucks transporting goods and our residents commuting to work, making now an ideal time to seek funding for immediate solutions.</p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-28" data-row="script-row-unique-28" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-28"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-29"><div class="row one-top-padding single-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 half-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 85%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 75%;"></div><img decoding="async" class="wp-image-82288" src="https://www.rctc.org/wp-content/uploads/2022/02/BefordCajalco_0012-scaled-uai-1917x1438.jpg" width="1917" height="1438" alt="BefordCajalco 0012"></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>“The current budget year surplus and the $31 billion surplus projected for the 2022-23 budget year, combined with robust cap and trade revenues and considerable new federal transportation dollars, present an opportunity that the residents and businesses of the Inland Empire cannot afford to miss,” the IE Caucus letter said. The surplus was most recently projected by Governor Newsom to be $45.7 billion.</p>
</div></div></div></div></div></div><script id="script-row-unique-29" data-row="script-row-unique-29" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-29"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-30"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-30" data-row="script-row-unique-30" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-30"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-31"><div class="row one-top-padding single-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 half-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Both the Riverside County Transportation Commission and the San Bernardino County Transportation Authority have compiled a group of transportation solutions to connect diverse communities, offer more mobility options, promote economic prosperity, reduce traffic congestion, streamline goods movement, and secure a climate resilient future across the Inland Empire. Residents in both counties approved half-cent sales tax measures (Measure A in Riverside County and Measure I in San Bernardino County) to combine with state and federal funds for transportation improvements.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 80%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 75%;"></div><img decoding="async" class="wp-image-82303" src="https://www.rctc.org/wp-content/uploads/2022/02/IMG_7718-scaled-uai-2276x1707.jpg" width="2276" height="1707" alt="IMG 7718"></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-31" data-row="script-row-unique-31" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-31"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-32"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The Riverside County projects include:</p>
<p><strong>Coachella Valley-San Gorgonio Rail Corridor Service Project</strong> – Caltrans and RCTC propose daily passenger rail service between Los Angeles and the Coachella Valley. The project would be transformational for the region, creating economic opportunity in disadvantaged communities, improving access to job centers and attractions, providing alternatives to traveling on I-10, and reducing emissions to improve air quality. The $50 million request would help fund preliminary engineering along the 76-mile eastern section of track as well as project-level environmental clearance for up to six stations, a new third main track, and associated grade crossings and signal improvements on the eastern end of the corridor.</p>
<p><strong>Interstate 10 Bypass Project </strong>– The County of Riverside Transportation Department proposes constructing an Interstate 10 bypass route in Banning and Cabazon. There is a stretch between the City of Banning and the unincorporated community of Cabazon and the Morongo Reservation, in which I-10 is the only road available to motorists. Should this stretch of I-10 ever close, the critical link between western Riverside and San Bernardino counties and the inland desert communities would be severed. The proposed I-10 Bypass Project would mitigate this nightmarish scenario with construction of a new road south of I-10, linking Banning to Cabazon. The $95 million request would fund final design, right of way acquisition, and construction of a two-lane roadway with bridges and grading for a future four-lane facility.</p>
<p><strong>Third Street Grade Separation Project</strong> – The City of Riverside proposes reducing public safety risks by redirecting vehicle/pedestrian/bicycle traffic above or below the busy railroad tracks at Third Street. Riverside is trisected by two freight rail lines, Burlington Northern Santa Fe Railway and Union Pacific Railroad. These rail lines carry more than 75% of the freight handled by the Ports of L.A. and Long Beach through Riverside. Every day, approximately 128 trains pass through the city. At-grade crossings pose safety risks, create traffic delays, increase emissions from idling vehicles, and delay emergency response. The $30 million request would allow construction of the project to separate Third Street from the railroad tracks.</p>
<p><strong>15 Express Lanes Project Southern Extension</strong> – RCTC proposes extending the 15 Express Lanes by an additional 14.5 miles, from Cajalco Road in Corona, through the Temescal Valley, to Route 74/Central Avenue in Lake Elsinore. Once built, the project would improve traffic operations and travel times, expand travel choice through carpooling and mass transit, increase travel time reliability, and manage long-term traffic congestion spurred by increased goods movement and population growth. The $500 million request would fund final design, right of way acquisition, and construction of the new lanes.</p>
<p><strong>Fullerton Junction to Riverside Triple Track Completion</strong> – Metrolink proposes triple tracking the Burlington Northern Santa Fe rail line from Fullerton through Riverside, as part of a suite of upgrades to Metrolink’s system in time for the 2028 Olympics. Not only is this project critical to improved passenger rail service in Riverside County, it also will enhance the movement of freight and goods from the Ports of L.A. and Long Beach to reduce road congestion and associated emissions. The $200 million request would fund project development, include environmental approvals, final design, and construction of segments from the Prado Dam to Riverside.</p>
<p>Click <a href="https://www.rctc.org/wp-content/uploads/2022/02/Inland-Empire-State-Legislative-Caucus-Letter-and-Project-List.pdf">here</a> to read the full IE Caucus letter, which also includes details about requested funding for San Bernardino County projects.</p>
<p><strong>To register your support for securing more funding for Inland Empire projects, please visit our <a href="https://www.rctc.org/support-funding/">support page</a>.</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-32" data-row="script-row-unique-32" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-32"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-33"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-33" data-row="script-row-unique-33" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-33"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-34"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ></div></div></div></div></div><script id="script-row-unique-34" data-row="script-row-unique-34" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-34"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/inland-empire-caucus-seeks-transportation-project-funding-from-state-of-california/">Inland Empire Caucus Seeks Transportation Project Funding from State of California</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
