<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Green River Road Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/green-river-road/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Tue, 30 Jun 2026 17:54:26 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>Green River Road Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</title>
		<link>https://www.rctc.org/new-71-91-interchange-opens/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 23 Jun 2025 15:14:20 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[71/91 interchange]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[Measure A Successes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106999</guid>

					<description><![CDATA[<p>New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</p>
<p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Over the past two years, the residents of the Corona, Chino, and Chino Hills communities – and countless travelers on the 71 and 91 – have seen the impressive 71/91 connector take shape. After the recent weekend closure of the eastbound 91 Green River Rd. on-ramp, where crews safely performed a traffic switch to get the new connector and on-ramp ready for vehicles, the new interchange is now open to motorists!</p>
<p>Crews opened the new eastbound 91 to northbound 71 connector to highway traffic on Saturday morning, June 21, and the realigned on-ramp on Monday, June 23.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107035" data-options="width:2560,height:1440,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg'"><img fetchpriority="high" decoding="async" class="wp-image-107035" src="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" width="2560" height="1440" alt="default" srcset="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1024x576.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-768x432.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1536x864.jpg 1536w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-2048x1152.jpg 2048w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-350x197.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-36x20.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-48x27.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-500x281.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-800x450.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1280x720.jpg 1280w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1920x1080.jpg 1920w" sizes="(max-width: 2560px) 100vw, 2560px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction of the <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> began in January 2023. As part of the project, crews built a new eastbound 91 to northbound 71 connector bridge that spans over the 91 and Santa Ana River. This new, two-lane direct connector replaces the old single-lane loop connector. The existing eastbound 91 Green River Rd. on-ramp was also realigned to provide direct access to the new northbound 71 connector and eastbound 91 general purpose lanes. Crews also constructed a new eastbound 91 auxiliary lane for improved access and merging with the new connector.</p>
<p>During construction, crews excavated 400,000 cubic yards of roadway, used over 9 million pounds of rebar, constructed over 4,000 cubic yards of retaining walls, and are expected to pour over 36,000 cubic yards of concrete by the end of the project. The new connector measures an impressive 100 feet in height and 2,500 feet in length.</p>
</div><div class="vc_row wideGallery row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107004" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-300x200.jpg'"><img decoding="async" class="wp-image-107004" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 Banner Web"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107006" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-300x200.jpg'"><img decoding="async" class="wp-image-107006" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 01"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The new, non-tolled connector is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, and enhance traffic flow – providing long-lasting benefits to Riverside County residents and the greater southern California region. The project will also support continued movement through this area by native wildlife such as mountain lions, bobcats, and coyotes.</p>
<p>Funding for the $137 million project was provided by federal, state, and local sources, including <a href="https://www.rctc.org/measure-a/">Measure A</a>; the twice voter-approved sales tax measure for transportation improvements in Riverside County. The delivery of this project further advances RCTC’s goal to improve mobility for the people of Riverside County.</p>
<p>For more information about this project, please visit: <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a></p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>May is National Bike Month: Put on your Helmet and Start Pedaling!</title>
		<link>https://www.rctc.org/may-national-bike-month/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 05 May 2022 15:18:21 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Coachella Valley]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[IE Commuter]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[bike]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[Santa Ana River]]></category>
		<category><![CDATA[Santa Ana River Trail]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=83222</guid>

					<description><![CDATA[<p>The Point: Check out these five fun reasons to saddle up in Riverside County</p>
<p>The post <a href="https://www.rctc.org/may-national-bike-month/">May is National Bike Month: Put on your Helmet and Start Pedaling!</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Check out these five fun reasons to saddle up in Riverside County </strong></p>
</div><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row vc_custom_1651707063312 row-container" style="margin-top: -50px ;" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Chances are, a lonely, dusty bicycle is waiting in your garage or storage unit to be cleaned up and taken outdoors for a spin. While riding a bike is good on any day, it’s even better in May because the weather is warm, birds are singing, and it’s National Bike Month.</p>
<p>Riding a bicycle is good for your physical and mental health. It also offers a fun alternative to driving and helps the environment by reducing greenhouse emissions. Here in Riverside County, we offer five more great reasons to hop on your bike this month:</p>
</div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-2 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 158px;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83231" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1.jpg" width="297" height="297" alt="Bike Wheel No 1" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1.jpg 297w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1-24x24.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1-36x36.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_1-48x48.jpg 48w" sizes="(max-width: 297px) 100vw, 297px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-10 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column bulletsfont text-lead" ><p><strong>The Santa Ana River Trail Parking Lot at Green River Road in Corona is Open<br />
</strong>Earlier this year, the Santa Ana River Trail parking lot at Green River Road in Corona reopened after being closed for more than a year. As part of the 91 Corridor Operations Project, the parking lot at the trailhead was repaved and restriped for cyclists who wish to park their cars to pedal their way to Orange County. Amateur and hard-core cyclists alike can start their journey on fresh pavement!</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83259" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01.jpg" width="1200" height="700" alt="Bike Photo 01" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01.jpg 1200w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-300x175.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-1024x597.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-768x448.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-01-48x28.jpg 48w" sizes="(max-width: 1200px) 100vw, 1200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-2 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 158px;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83232" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2.jpg" width="297" height="297" alt="Bike Wheel No 2" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2.jpg 297w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2-24x24.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2-36x36.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_2-48x48.jpg 48w" sizes="(max-width: 297px) 100vw, 297px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-10 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column bulletsfont text-lead" ><p><strong>Use Metrolink to Extend Your Bike Ride<br />
</strong>Thinking about taking a longer trip? Metrolink is offering free fares to cyclists during Bike to Work Week, May 16 to 20. Train riders can use special bike cars to stow their equipment and have a chance to win an Aventon ebike and other goodies as part of the “Cycle SoCal” prize package. More information is available on <a href="https://metrolinktrains.com/bike-month?utm_medium=social-organic&amp;utm_source=partner&amp;utm_campaign=bikemonth&amp;utm_content=toolkit" target="_blank" rel="noopener">Metrolink’s website</a>.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83252" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02.jpg" width="1200" height="700" alt="Bike Photo 02" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02.jpg 1200w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-300x175.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-1024x597.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-768x448.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-02-48x28.jpg 48w" sizes="(max-width: 1200px) 100vw, 1200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-2 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 158px;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83233" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3.jpg" width="297" height="297" alt="Bike Wheel No 3" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3.jpg 297w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3-24x24.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3-36x36.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_3-48x48.jpg 48w" sizes="(max-width: 297px) 100vw, 297px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-10 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column bulletsfont text-lead" ><p><strong>IE Commuter $5/Day Rideshare Bike Incentive<br />
</strong>The RCTC IE Commuter program launched its $5/Day ridesharing incentive program in April. Biking to work is considered ridesharing! Start biking to work and earn $5 per day in gift card rewards for the first three months, up to $125. See the details at <a href="http://www.iecommuter.org/5day" target="_blank" rel="noopener">IECommuter.org/5day</a>.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-82915" src="https://www.rctc.org/wp-content/uploads/2022/04/0422_IE_5_Day_Home_Tile_RZ.jpg" width="1200" height="630" alt="0422 IE 5 Day Home Tile RZ" srcset="https://www.rctc.org/wp-content/uploads/2022/04/0422_IE_5_Day_Home_Tile_RZ.jpg 1200w, https://www.rctc.org/wp-content/uploads/2022/04/0422_IE_5_Day_Home_Tile_RZ-300x158.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/04/0422_IE_5_Day_Home_Tile_RZ-1024x538.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/04/0422_IE_5_Day_Home_Tile_RZ-768x403.jpg 768w" sizes="(max-width: 1200px) 100vw, 1200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-2 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 158px;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83234" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4.jpg" width="297" height="297" alt="Bike Wheel No 4" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4.jpg 297w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4-24x24.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4-36x36.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_4-48x48.jpg 48w" sizes="(max-width: 297px) 100vw, 297px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-10 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column bulletsfont text-lead" ><p><strong>CV Link<br />
</strong>Three segments of the CV Link pathway are open to bike riders in the Coachella Valley. The segments are located in Cathedral City, Palm Springs, and Palm Desert. The CV Link project envisions a 40-mile pathway accessible to bikes, pedestrians, and low-speed electric vehicles. Read more: <a href="http://www.coachellavalleylink.com" target="_blank" rel="noopener">www.coachellavalleylink.com</a></p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83263" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04.jpg" width="1200" height="700" alt="Bike Photo 04" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04.jpg 1200w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-300x175.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-1024x597.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-768x448.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-04-48x28.jpg 48w" sizes="(max-width: 1200px) 100vw, 1200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="vc_row row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-2 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 158px;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83230" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5.jpg" width="297" height="297" alt="Bike Wheel No 5" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5.jpg 297w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5-150x150.jpg 150w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5-24x24.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5-36x36.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike_Wheel_No_5-48x48.jpg 48w" sizes="(max-width: 297px) 100vw, 297px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-10 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column bulletsfont text-lead" ><p><strong>Riverside Bicycle Club<br />
</strong>The oldest continuous bike club west of the Mississippi, the Riverside Bicycle Club schedules rides for all levels, from rookie riders – check out the Saturday coffee cruises – to  Tour de France-hopefuls. Learn more:  <a href="https://www.riversidebicycleclub.com/" target="_blank" rel="noopener">www.riversidebicycleclub.com/</a></p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-83264" src="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05.jpg" width="1200" height="700" alt="Bike Photo 05" srcset="https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05.jpg 1200w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-300x175.jpg 300w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-1024x597.jpg 1024w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-768x448.jpg 768w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2022/05/Bike-Photo-05-48x28.jpg 48w" sizes="(max-width: 1200px) 100vw, 1200px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/may-national-bike-month/">May is National Bike Month: Put on your Helmet and Start Pedaling!</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Approves New Lane on Southbound Interstate 15</title>
		<link>https://www.rctc.org/new-southbound-lane-on-i-15/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 20 Sep 2021 21:55:25 +0000</pubDate>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15]]></category>
		<category><![CDATA[Corridor Operations Project]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[OCTA]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=80039</guid>

					<description><![CDATA[<p>The Point: Accelerated schedule may relieve traffic congestion in heavily traveled area</p>
<p>The post <a href="https://www.rctc.org/new-southbound-lane-on-i-15/">RCTC Approves New Lane on Southbound Interstate 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Accelerated schedule may relieve traffic congestion in heavily traveled area</strong></p>
<p>Increased traffic congestion on southbound Interstate 15 between Corona and the Temescal Valley has prompted RCTC, with the support of agency partners, to approve adding a new lane between the Cajalco Road interchange and the Weirick Road southbound off-ramp, next to the I-15 outer shoulder.</p>
<p>An expedited schedule would allow construction of the <a href="https://www.rctc.org/projects/interstate-15-interim-corridor-operations-project/" target="_blank" rel="noopener"><strong>I-15 Interim Corridor Operations Project</strong></a> (known as the 15 ICOP) to start next spring and potentially be open in late summer or early fall 2022.</p>
<p>“RCTC recognizes the difficulties that motorists face on a daily basis in this heavily traveled area, and we are expediting this project to help provide traffic relief,” said RCTC Chair Jan Harnik, who also serves as the Palm Desert Mayor Pro Tem. “This interim project may offer some relief, especially during the peak afternoon and evening hours on southbound I-15 through Jurupa Valley, Eastvale, Norco, Corona, and the Temescal Valley,” she said.</p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Since the opening of the 15 Express Lanes in April, traffic congestion has grown where the tolled lanes terminate at Cajalco Road in Corona, due to vehicles merging and weaving to the general-purpose lanes. During weekday afternoons and weekend peak hours, it can take 30 minutes for drivers to travel the five-mile stretch on southbound I-15 between the 91 and Cajalco Road.</p>
<p>The ICOP is the result of an agency task force led by staff from RCTC, Caltrans, the City of Corona, and the County of Riverside. The group began meeting in June to study alternatives and develop near-term improvements to help improve traffic flow. The CHP also has provided input regarding safety and vehicle pull-over locations.</p>
<p>To add the new lane, crews would strengthen the pavement of the outer and inner I-15 shoulders to handle traffic loads for an interim three-year period until RCTC’s <a href="https://www.rctc.org/15cop">15 Corridor Operations Project</a> could be completed.  The interim project would provide three 11-foot wide lanes, one 12-foot wide lane, a varying 3 to 8-foot wide outer shoulder, and a varying 2 to 5-foot wide inner shoulder on southbound I-15 between the Cajalco Road and Weirick Road interchanges.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 80%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-80022" src="https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-scaled.jpg" width="1726" height="2560" alt="" srcset="https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-scaled.jpg 1726w, https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-202x300.jpg 202w, https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-690x1024.jpg 690w, https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-768x1139.jpg 768w, https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-1036x1536.jpg 1036w, https://www.rctc.org/wp-content/uploads/2021/09/I-15-Toll-Lanes-5-28-21-19-1381x2048.jpg 1381w" sizes="(max-width: 1726px) 100vw, 1726px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC staff will immediately begin environmental studies and design for the project. An aggressive construction procurement schedule would allow staff to request Commission approval of the construction contract in early 2022. This approach will save time to allow the new lane to open and provide congestion relief as soon as possible. Funding for the $5 million project would be provided by Measure A sales tax revenue bond proceeds anticipated to be available from the 15 Express Lanes Project financing completed in July 2017.</p>
</div></div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-southbound-lane-on-i-15/">RCTC Approves New Lane on Southbound Interstate 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Approves New Southbound Lane on I-15 in South Corona, Temescal Valley</title>
		<link>https://www.rctc.org/new-15-southbound-lane/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 19 Oct 2020 22:45:44 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[Corridor Operations Project]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[OCTA]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[Route 91]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=77296</guid>

					<description><![CDATA[<p>The Point:  Project will help traffic flow between Cajalco Road, Weirick Road</p>
<p>The post <a href="https://www.rctc.org/new-15-southbound-lane/">RCTC Approves New Southbound Lane on I-15 in South Corona, Temescal Valley</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Project will help traffic flow between Cajalco Road, Weirick Road</strong></p>
<p>Accelerating construction.  Planning ahead. Reinvesting in the I-15 corridor.</p>
<p>With the completion of the 15 Express Lanes in sight, RCTC Commissioners voted October 14 to fund a new project to improve a traffic hot-spot on southbound I-15 from Cajalco Road to Weirick Road in south Corona and Temescal Valley.</p>
<p>Once the 15 Express Lanes opens, I-15 will narrow from five lanes to three lanes at Cajalco Road to match the current lanes in this area</p>
<p>The 15 Corridor Operations Project – or 15 COP – will add a non-tolled lane on southbound I-15 from the Cajalco Road on-ramp to the Weirick Road off-ramp, a segment slightly less than one mile. The project will widen the existing I-15 median, shift vehicles to this new pavement, and convert the existing outside lane to a new travel lane. In addition, the 15 COP will widen the Bedford Canyon Wash Bridge.</p>
<p>Funding for the $38.3 million project is provided by $25 million of unspent budget from the 15 Express Lanes Project, due to effective cost management. The remaining $13.3 million will be from federal funds.</p>
</div></div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>“Southbound I-15 motorists have spoken loud and clear for years that they need more relief,” said RCTC Chair and Wildomar City Council Member Ben J. Benoit. “The RCTC Commission agreed and we took action to accelerate improvements that will make a difference. Thanks to RCTC’s staff, we have funds remaining from the current 15 Express Lanes Project to keep moving south.”</p>
<p>“We are putting local voter-approved transportation dollars to work on a project that will take a bite out of Riverside County’s traffic congestion. We still have more work to do, but opportunities like this to advance savings from one project and roll it forward to the next improvement is a win for the community,” said RCTC Commissioner and First District Supervisor Kevin Jeffries.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 90%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-77299" src="https://www.rctc.org/wp-content/uploads/2021/10/15-south_filter.png" width="940" height="788" alt="" srcset="https://www.rctc.org/wp-content/uploads/2021/10/15-south_filter.png 940w, https://www.rctc.org/wp-content/uploads/2021/10/15-south_filter-300x251.png 300w, https://www.rctc.org/wp-content/uploads/2021/10/15-south_filter-768x644.png 768w" sizes="(max-width: 940px) 100vw, 940px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC has adopted an aggressive schedule for engineering, environmental studies, project design, and construction. Work should break ground in mid-2023, and the new lane could open in late 2024.</p>
<p>The project is designed to offer interim traffic congestion relief in this section of I-15 before the opening of a longer-term project, the 15 Express Lanes Southern Extension ­– or 15 ELPSE – in approximately 2028. RCTC is conducting technical studies for the 15 ELPSE, which would add express lanes in both directions in the median of I-15 between Cajalco Road and Route 74/Central Avenue in Lake Elsinore.</p>
<p>Building the 15 COP follows RCTC’s strategy of making localized improvements after the 91 Express Lanes opened in Riverside County in 2017. Once those lanes opened, several areas of local congestion occurred, and RCTC made operational to improve traffic flow, including a new westbound lane between Green River Road and Route 241.</p>
<p>To sign up for 15 COP project updates, visit <a href="https://www.rctc.org/15cop">rctc.org/15cop</a></p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-15-southbound-lane/">RCTC Approves New Southbound Lane on I-15 in South Corona, Temescal Valley</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Awards Construction Contract for New Lane on Westbound 91</title>
		<link>https://www.rctc.org/award-construction-new-91-lane/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 14 Aug 2020 16:25:43 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[Corridor Operations Project]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[OCTA]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[Route 91]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=76678</guid>

					<description><![CDATA[<p>The Point:  Construction bids lower than expected; work to start in October </p>
<p>The post <a href="https://www.rctc.org/award-construction-new-91-lane/">RCTC Awards Construction Contract for New Lane on Westbound 91</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Construction bids lower than expected; work to start in October </strong></p>
<p>The Riverside County Transportation Commission is scheduled to start construction of a new lane on westbound 91 in October, helping to provide traffic relief and economic recovery in Riverside County. The new, non-tolled lane will extend about two miles, from the Green River Road on-ramp in Corona to the southbound 241 connector.</p>
<p>The 91 Corridor Operations Project, also known as the 91 COP, was developed two years ago and accelerated to construction based on information and traffic data gathered after the 91 Express Lanes opened in 2017 with input from RCTC Commissioners and area residents. RCTC will deliver the project in partnership with Caltrans, the Orange County Transportation Authority, the City of Corona, and the Transportation Corridor Agencies.</p>
</div></div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Local residents advocated for the development of the project, due to bottlenecks they experience each morning at the Green River Road westbound on-ramp and on the 91 between Green River Road and the connector to southbound 241. The current traffic congestion creates frustration among motorists on local streets in Corona and Coronita, as well as on the 91 for Riverside County residents.</p>
<p>RCTC awarded a construction contract to OHL USA on August 12. The $18.9 million contract came in 27 percent lower than anticipated, a $7 million savings to taxpayers. Project funding is provided by toll revenue from the 91 Express Lanes in Riverside County and Orange County and federal funds.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-74932" src="https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-scaled.jpg" width="2560" height="1707" alt="" srcset="https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-300x200.jpg 300w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-1024x683.jpg 1024w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-768x512.jpg 768w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-1536x1024.jpg 1536w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-2048x1365.jpg 2048w" sizes="(max-width: 2560px) 100vw, 2560px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The Commission also approved a $4.5 million construction management contract in May with Corona-based small business Falcon Engineering Services.</p>
<p>Construction is expected to take about one year. The contractor may earn two early completion bonuses totaling up to $472,500 if schedule milestones are advanced. There also are financial penalties for not reaching these milestones.</p>
<p>“Traffic levels are starting to return to pre-pandemic levels and the 91 continues to be a challenge for Riverside County residents,” said RCTC Chair and Wildomar City Council Member Ben J. Benoit. “We never stopped moving forward because we planned ahead and we know how important it is to keep our economy moving, especially right now.”</p>
</div></div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 88%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-74933" src="https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-scaled.jpg" width="2560" height="1748" alt="" srcset="https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-300x205.jpg 300w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-1024x699.jpg 1024w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-768x524.jpg 768w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-1536x1049.jpg 1536w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Feat-2048x1398.jpg 2048w" sizes="(max-width: 2560px) 100vw, 2560px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>To add the new westbound lane, the 91 COP will:</p>
<ul>
<li>Widen outer pavement along the 91 by 9 to 10 feet in some locations and restripe lanes in other locations</li>
<li>Widen the County Line Creek Undercrossing</li>
<li>Build retaining walls approximately 3,200 feet long and 6 to 28 feet tall on the north side of the 91</li>
<li>Rebuild a portion of Green River Road near the Green River Golf Club entrance</li>
<li>Replace overhead signs and add lighting</li>
</ul>
<p>
</div></div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-18"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Once aboard, the contractor will develop a construction schedule and RCTC will share this information with the community. Motorists, residents, and users of the Santa Ana River Trail are invited to register for construction updates using the form below and to follow @therctc on social media for the latest information. Please watch for lane closures, narrower lanes, construction crews and equipment, and changing conditions on both the 91 and Green River Road. Noisy work also may occur.</p>
<p>This project is one of several that RCTC has launched this year. This spring, construction began on the I-15 Railroad Canyon Interchange in Lake Elsinore and the Pachappa Underpass in Riverside. Design started on the 15/91 Express Lanes Connector in Corona and construction is expected to kick off in 2021. In Perris, construction of the I-215 Placentia Avenue Interchange, the first contract of the Mid County Parkway, will start later this summer. Each of these projects will generate employment and economic activity to help with Riverside County’s recovery from the current recession.</p>
</div></div></div></div></div></div><script id="script-row-unique-18" data-row="script-row-unique-18" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-18"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-19"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><noscript class="ninja-forms-noscript-message">
	Notice: JavaScript is required for this content.</noscript>
<div id="nf-form-14-cont" class="nf-form-cont" aria-live="polite" aria-labelledby="nf-form-title-14" aria-describedby="nf-form-errors-14" role="form">

    <div class="nf-loading-spinner"></div>

</div>
        <!-- That data is being printed as a workaround to page builders reordering the order of the scripts loaded-->
        <script>var formDisplay=1;var nfForms=nfForms||[];var form=[];form.id='14';form.settings={"ninjaForms":"Ninja Forms","changeEmailErrorMsg":"Please enter a valid email address.","changeDateErrorMsg":"Please enter a valid date!","confirmFieldErrorMsg":"These fields must match!","fieldNumberNumMinError":"Please enter a number that is not below the minimum.","fieldNumberNumMaxError":"Please enter a number that is not above the maximum.","fieldNumberIncrementBy":"Please increment by %s","fieldTextareaRTEInsertLink":"Insert Link","fieldTextareaRTEInsertMedia":"Insert Media","fieldTextareaRTESelectAFile":"Select a file","fieldsTermsAdd":"Add New","fieldsTermsNewName":"New term name","tableInsertRowAbove":"Insert Row Above","tableInsertRowBelow":"Insert Row Below","tableInsertColumnLeft":"Insert Column Left","tableInsertColumnRight":"Insert Column Right","tableDeleteRow":"Delete Row","tableDeleteColumn":"Delete Column","tableDeleteTable":"Delete Table","tableLegacyNotice":"This content has tables in the old editor format. Custom styles are preserved until converted. Editing will update to the new format.","tableLegacyConvert":"Convert Now","tableInsertTable":"Insert Table","dismiss":"Dismiss","insertLink":"Insert Link","formErrorsCorrectErrors":"Please correct errors before submitting this form.","formErrorsSubmissionFailed":"Something went wrong and your form wasn&#039;t sent. Please check your connection and try again.","formHoneypot":"If you are a human seeing this field, please leave it empty.","validateRequiredField":"This is a required field.","honeypotHoneypotError":"This form could not be submitted. Please reload the page and try again.","fileUploadOldCodeFileUploadInProgress":"File Upload in Progress.","fileUploadOldCodeFileUpload":"File Upload","currencySymbol":"&#36;","fieldsMarkedRequired":"Fields marked with an <span class=\"ninja-forms-req-symbol\">*<\/span> are required","thousands_sep":",","decimal_point":".","siteLocale":"en_US","dateFormat":"m\/d\/Y","longDateFormat":"l, F j, Y","startOfWeek":"1","of":"%1$s of %2$s","previousMonth":"Previous Month","nextMonth":"Next Month","months":["January","February","March","April","May","June","July","August","September","October","November","December"],"monthsShort":["Jan","Feb","Mar","Apr","May","Jun","Jul","Aug","Sep","Oct","Nov","Dec"],"weekdays":["Sunday","Monday","Tuesday","Wednesday","Thursday","Friday","Saturday"],"weekdaysShort":["Sun","Mon","Tue","Wed","Thu","Fri","Sat"],"weekdaysMin":["Su","Mo","Tu","We","Th","Fr","Sa"],"recaptchaConsentMissing":"reCAPTCHA validation couldn&#039;t load.","recaptchaMissingCookie":"reCaptcha v3 validation couldn&#039;t load the cookie needed to submit the form.","recaptchaConsentEvent":"Accept reCAPTCHA cookies before sending the form.","hourPlaceholder":"Hour","minutePlaceholder":"Minute","am":"AM","pm":"PM","paypalCancelled":"The PayPal payment was cancelled. Your form has not been sent \u2014 you can approve the payment to finish.","paypalError":"PayPal couldn&#039;t complete your payment. You have not been charged. Please try again.","paypalNoMethods":"No PayPal payment method is available for this payment. Your form has not been sent.","paypalTestApprove":"Approve test payment","paypalApprovalNeeded":"Almost done! Select your preferred payment option below to complete your payment.","paypalApprovalRegion":"PayPal payment approval","objectType":"Form Setting","editActive":false,"title":" Route 91 Corridor Operations Project","show_title":1,"allow_public_link":0,"embed_form":"","clear_complete":1,"hide_complete":1,"default_label_pos":"above","wrapper_class":"","element_class":"","key":"","add_submit":0,"currency":"","unique_field_error":"A form with this value has already been submitted.","logged_in":false,"not_logged_in_msg":"","sub_limit_msg":"The form has reached its submission limit.","calculations":[],"formContentData":[{"order":1,"cells":[{"order":0,"fields":["i_would_like_to_1597358092118"],"width":"100"}]},{"order":2,"cells":[{"order":0,"fields":["name_1586528834419"],"width":"100"}]},{"order":3,"cells":[{"order":0,"fields":["email_1586528674554"],"width":"100"}]},{"order":4,"cells":[{"order":0,"fields":["zip_1597358929820"],"width":"100"}]},{"order":5,"cells":[{"order":0,"fields":["phone_1586528680898"],"width":"100"}]},{"order":6,"cells":[{"order":0,"fields":["html_1597358195143"],"width":"100"}]},{"order":7,"cells":[{"order":0,"fields":["this_is_my_first_inquiry_about_this_subject_1586529013884"],"width":"100"}]},{"order":8,"cells":[{"order":0,"fields":["message_1586529035788"],"width":"100"}]},{"order":9,"cells":[{"order":0,"fields":["send_request_1586529084067"],"width":"100"}]}],"container_styles_show_advanced_css":0,"title_styles_show_advanced_css":0,"row_styles_show_advanced_css":0,"row-odd_styles_show_advanced_css":0,"success-msg_styles_show_advanced_css":0,"error_msg_styles_show_advanced_css":0,"conditions":[],"repeatable_fieldsets":"","currency_symbol":"","beforeForm":"","beforeFields":"","afterFields":"","afterForm":""};form.fields=[{"objectType":"Field","objectDomain":"fields","editActive":false,"order":1,"idAttribute":"id","type":"listcheckbox","label":"I WOULD LIKE TO: ","key":"i_would_like_to_1597358092118","label_pos":"above","required":1,"options":[{"errors":[],"max_options":0,"label":"Receive construction updates and information on the 91 Corridor Operations Project.","value":"Receive construction updates and information on the 91 Corridor Operations Project.","calc":"","selected":0,"order":0,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"label":"Have a project representative contact me about speaking to my organization.","value":"Have a project representative contact me about speaking to my organization.","calc":"","selected":0,"order":1,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"label":"Request help with my question\/comment (see comment field below)","value":"Request help with my questioncomment see comment field below","calc":"","selected":0,"order":2,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true},{"errors":[],"max_options":0,"order":3,"new":false,"options":[],"label":"Subscribe to RCTC\u2019s e-newsletter The Point.","value":"Subscribe to RCTCs e-newsletter The Point.","calc":"","selected":0,"settingModel":{"settings":false,"hide_merge_tags":false,"error":false,"name":"options","type":"option-repeater","label":"Options <a href=\"#\" class=\"nf-add-new\">Add New<\/a> <a href=\"#\" class=\"extra nf-open-import-tooltip\"><i class=\"fa fa-sign-in\" aria-hidden=\"true\"><\/i> Import<\/a>","width":"full","group":"","value":[{"label":"One","value":"one","calc":"","selected":0,"order":0},{"label":"Two","value":"two","calc":"","selected":0,"order":1},{"label":"Three","value":"three","calc":"","selected":0,"order":2}],"columns":{"label":{"header":"Label","default":""},"value":{"header":"Value","default":""},"calc":{"header":"Calc Value","default":""},"selected":{"header":"<span class=\"dashicons dashicons-yes\"><\/span>","default":0}}},"manual_value":true}],"container_class":"","element_class":"","admin_label":"","help_text":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"list_item_row_styles_border":"","list_item_row_styles_height":"","list_item_row_styles_width":"","list_item_row_styles_font-size":"","list_item_row_styles_margin":"","list_item_row_styles_padding":"","list_item_row_styles_float":"","list_item_row_styles_show_advanced_css":0,"list_item_label_styles_border":"","list_item_label_styles_height":"","list_item_label_styles_width":"","list_item_label_styles_font-size":"","list_item_label_styles_margin":"","list_item_label_styles_padding":"","list_item_label_styles_float":"","list_item_label_styles_show_advanced_css":0,"list_item_element_styles_border":"","list_item_element_styles_height":"","list_item_element_styles_width":"","list_item_element_styles_font-size":"","list_item_element_styles_margin":"","list_item_element_styles_padding":"","list_item_element_styles_float":"","list_item_element_styles_show_advanced_css":0,"cellcid":"c4354","drawerDisabled":false,"id":209,"beforeField":"","afterField":"","value":"","parentType":"list","element_templates":["listcheckbox","input"],"old_classname":"list-checkbox","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":2,"idAttribute":"id","type":"firstname","label":"Name","key":"name_1586528834419","label_pos":"hidden","required":1,"default":"","placeholder":"Name*","container_class":"","element_class":"","admin_label":"","help_text":"","custom_name_attribute":"fname","personally_identifiable":1,"value":"","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4358","id":159,"beforeField":"","afterField":"","parentType":"firstname","element_templates":["firstname","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":3,"idAttribute":"id","type":"email","label":"Email","key":"email_1586528674554","label_pos":"hidden","required":1,"default":"","placeholder":"Email*","container_class":"one-third first","element_class":"","admin_label":"","help_text":"","custom_name_attribute":"email","personally_identifiable":1,"value":"","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4361","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":160,"beforeField":"","afterField":"","parentType":"email","element_templates":["email","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":4,"idAttribute":"id","type":"zip","label":"Zip","key":"zip_1597358929820","label_pos":"hidden","required":false,"default":"","placeholder":"Zip","container_class":"one-third second","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":false,"admin_label":"","help_text":"","mask":"","custom_mask":"","custom_name_attribute":"zip","personally_identifiable":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"cellcid":"c4364","value":"","drawerDisabled":false,"id":211,"beforeField":"","afterField":"","parentType":"zip","element_templates":["zip","textbox","input","textbox","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":5,"idAttribute":"id","type":"phone","label":"Phone","key":"phone_1586528680898","label_pos":"hidden","required":false,"default":"","placeholder":"Mobile Phone","container_class":"one-third third","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":false,"admin_label":"","help_text":"","mask":"","custom_mask":"","custom_name_attribute":"phone","personally_identifiable":1,"value":"","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4367","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":161,"beforeField":"","afterField":"","parentType":"textbox","element_templates":["tel","textbox","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":6,"idAttribute":"id","type":"html","label":"HTML","default":"<sup><em>By providing your mobile phone number, you consent to receiving construction updates by text message. Text messaging rates from your mobile carrier will apply<\/em><\/sup>","container_class":"","element_class":"","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","wrap_styles_show_advanced_css":0,"label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","label_styles_show_advanced_css":0,"element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","element_styles_show_advanced_css":0,"cellcid":"c4370","key":"html_1597358195143","drawerDisabled":false,"id":210,"beforeField":"","afterField":"","value":"<sup><em>By providing your mobile phone number, you consent to receiving construction updates by text message. Text messaging rates from your mobile carrier will apply<\/em><\/sup>","label_pos":"above","parentType":"html","element_templates":["html","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":7,"idAttribute":"id","type":"checkbox","label":"This is my first inquiry about this subject.","key":"this_is_my_first_inquiry_about_this_subject_1586529013884","label_pos":"right","required":false,"container_class":"","element_class":"","manual_key":false,"admin_label":"","help_text":"","default_value":"unchecked","checked_value":"Checked","unchecked_value":"Unchecked","checked_calc_value":"","unchecked_calc_value":"","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4373","wrap_styles_border":"","wrap_styles_width":"","wrap_styles_margin":"","wrap_styles_padding":"","wrap_styles_float":"","label_styles_border":"","label_styles_width":"","label_styles_font-size":"","label_styles_margin":"","label_styles_padding":"","label_styles_float":"","element_styles_border":"","element_styles_width":"","element_styles_font-size":"","element_styles_margin":"","element_styles_padding":"","element_styles_float":"","id":162,"beforeField":"","afterField":"","value":"","parentType":"checkbox","element_templates":["checkbox","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":8,"idAttribute":"id","type":"textarea","label":"Message","key":"message_1586529035788","label_pos":"hidden","required":false,"default":"","placeholder":"Message","container_class":"","element_class":"","input_limit":"","input_limit_type":"characters","input_limit_msg":"Character(s) left","manual_key":false,"admin_label":"","help_text":"","textarea_rte":"","disable_rte_mobile":"","textarea_media":"","value":"","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"label_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"cellcid":"c4376","id":163,"beforeField":"","afterField":"","parentType":"textarea","element_templates":["textarea","input"],"old_classname":"","wrap_template":"wrap"},{"objectType":"Field","objectDomain":"fields","editActive":false,"order":9,"idAttribute":"id","type":"submit","label":"Send Request","processing_label":"Processing","container_class":"","element_class":"","key":"send_request_1586529084067","drawerDisabled":false,"wrap_styles_show_advanced_css":0,"element_styles_show_advanced_css":0,"submit_element_hover_styles_show_advanced_css":0,"cellcid":"c4379","id":164,"beforeField":"","afterField":"","value":"","label_pos":"above","parentType":"textbox","element_templates":["submit","button","input"],"old_classname":"","wrap_template":"wrap-no-label"}];nfForms.push(form);</script>
                <script id="nf-tmpl-cell" type="text/template">
            <nf-fields></nf-fields>
        </script>

        <script id="nf-tmpl-row" type="text/template">
            <nf-cells></nf-cells>
        </script>

        </div></div></div></div></div><script id="script-row-unique-19" data-row="script-row-unique-19" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-19"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-20"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-20" data-row="script-row-unique-20" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-20"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/award-construction-new-91-lane/">RCTC Awards Construction Contract for New Lane on Westbound 91</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>New 91 Westbound Lane Moves Closer to Construction</title>
		<link>https://www.rctc.org/new-91-westbound-lane/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 13 May 2020 20:13:28 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[Corridor Operations Project]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[OCTA]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[Route 91]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=74931</guid>

					<description><![CDATA[<p>The Point:  Commission approves construction management contract for new lane between Green River Road and 241; next step is construction bids</p>
<p>The post <a href="https://www.rctc.org/new-91-westbound-lane/">New 91 Westbound Lane Moves Closer to Construction</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-21"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><b>The Point: <strong>Commission approves construction management contract for new lane between Green River Road and 241; next step is construction bids</strong></b></p>
<p>Traffic relief and economic recovery are on the way. The Riverside County Transportation Commission (RCTC) awarded a $4.9 million construction management contract to Riverside County-based small business Falcon Engineering Services on May 13, paving the way for work to start on the 91 Corridor Operations Project later this year.</p>
<p>The project will add a general-purpose lane for approximately two miles on westbound 91 from the Green River Road on-ramp to Route 241. Developed in 2018, the project was accelerated based on facts and data collected in the months after opening lanes from the 91 Corridor Improvement Project, with input from Commissioners and residents. Environmental studies and design were completed this spring, and RCTC will advertise for construction bids this summer. Construction of the $36 million project is scheduled to start this fall; the new lane is expected to open by the end of 2021.</p>
</div></div></div></div></div></div><script id="script-row-unique-21" data-row="script-row-unique-21" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-21"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-22"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>“Traveling on the 91 continues to be a challenge in Riverside County. Although stay-at-home orders have lessened traffic delays, drivers are starting to return to work, and traffic congestion will return with them,” said Commission Chair Ben J. Benoit, who also serves as a member of the Wildomar City Council. “The 91 Corridor Operations Project will add capacity to the 91 and aid in our region’s economic recovery,” he said.</p>
<p>In addition to constructing the new lane, the project will widen the County Line Creek Undercrossing, build retaining walls north of the 91, rebuild a portion of Green River Road, replace overhead signs, and install new lighting.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-74932" src="https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-scaled.jpg" width="2560" height="1707" alt="" srcset="https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-300x200.jpg 300w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-1024x683.jpg 1024w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-768x512.jpg 768w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-1536x1024.jpg 1536w, https://www.rctc.org/wp-content/uploads/2020/05/GR_Blog-2048x1365.jpg 2048w" sizes="(max-width: 2560px) 100vw, 2560px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-22" data-row="script-row-unique-22" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-22"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-23"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC will deliver the project in partnership with Caltrans, the Orange County Transportation Authority, the City of Corona, and Transportation Corridor Agencies.</p>
<p>This project is one of several that RCTC is starting this year. Last month, construction began on the Pachappa Underpass in Riverside and design started on the 15/91 Express Lanes Connector in Corona. Construction of the I-15 Railroad Canyon Road Interchange in Lake Elsinore will begin this month, followed by construction of the I-215 Placentia Avenue Interchange in Perris this fall. Each of these projects will add new jobs to help the economy recover from jobs lost during the COVID-19 pandemic.</p>
</div></div></div></div></div></div><script id="script-row-unique-23" data-row="script-row-unique-23" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-23"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-24"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-24" data-row="script-row-unique-24" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-24"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-91-westbound-lane/">New 91 Westbound Lane Moves Closer to Construction</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Route 91 Corridor Operations Project in Corona Moves Another Step Closer to Construction</title>
		<link>https://www.rctc.org/octa-approval-funds-cop/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 15 Jan 2020 22:45:36 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Funding]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[Corridor Operations Project]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[OCTA]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[Route 91]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=73557</guid>

					<description><![CDATA[<p>The Point:  New westbound lane will help provide traffic relief</p>
<p>The post <a href="https://www.rctc.org/octa-approval-funds-cop/">Route 91 Corridor Operations Project in Corona Moves Another Step Closer to Construction</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-25"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><b>The Point: New westbound lane will help provide traffic relief</b></p>
</div></div></div></div></div></div><script id="script-row-unique-25" data-row="script-row-unique-25" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-25"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-26"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="uncode-single-media-wrapper single-advanced"><div class="tmb tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-overlay-text-left tmb-image-anim  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg" ><div class="t-inside" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 57.8%;"></div><a  class="inactive-link pushed"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-73605" src="https://www.rctc.org/wp-content/uploads/2021/01/Green-River-1.jpg" width="1000" height="578" alt="" srcset="https://www.rctc.org/wp-content/uploads/2021/01/Green-River-1.jpg 1000w, https://www.rctc.org/wp-content/uploads/2021/01/Green-River-1-300x173.jpg 300w, https://www.rctc.org/wp-content/uploads/2021/01/Green-River-1-768x444.jpg 768w" sizes="(max-width: 1000px) 100vw, 1000px" /></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>It’s official: The Route 91 Corridor Operations Project in Corona advanced another step toward construction, following the Orange County Transportation Authority’s (OCTA) approval on Monday of $15 million to help fund the project.</p>
<p>Led by RCTC, the project will add a regular, general-purpose lane on westbound 91 from the westbound Green River Road on-ramp to Route 241. This project was created in 2018 and accelerated in response to Riverside County residents and local leaders.</p>
</div></div></div></div></div></div><script id="script-row-unique-26" data-row="script-row-unique-26" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-26"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-27"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Both OCTA and RCTC are funding the $36.2 million construction effort with surplus toll revenue from the 91 Express Lanes. Environmental studies and design are underway now, and construction is scheduled to begin in the second half of 2020. RCTC anticipates the new lane to open by the end of 2021.</p>
<p>“Leaders from Riverside and Orange Counties are working together to address traffic congestion on the 91. I thank the OCTA Board of Directors for recognizing the significance of this project to residents and businesses on both sides of the county line,” said RCTC Chair and Wildomar City Council Member Ben Benoit. “Many residents ask what we do with toll revenue from the 91. Adding this lane to the 91 for westbound commuters, which the community has asked for, is a great example of how the 91 Express Lanes makes traffic relief solutions possible that we otherwise couldn’t do.”</p>
<p>The 91 Corridor Operations Project is one of four projects that leaders on the boards of directors for RCTC, OCTA, the Transportation Corridor Agencies, and executive leadership of Caltrans, agreed last month to coordinate construction to save costs, time, and impacts on motorists. Other upcoming projects include the 15/91 Express Lanes Connector, the 71/91 Connector, and the 241/91 Express Connector.</p>
</div></div></div></div></div></div><script id="script-row-unique-27" data-row="script-row-unique-27" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-27"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/octa-approval-funds-cop/">Route 91 Corridor Operations Project in Corona Moves Another Step Closer to Construction</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
