<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>eastbound &#8211; Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/eastbound/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.rctc.org</link>
	<description></description>
	<lastBuildDate>Wed, 23 Jul 2025 15:57:06 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>eastbound &#8211; Riverside County Transportation Commission (RCTC)</title>
	<link>https://www.rctc.org</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</title>
		<link>https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 27 Feb 2025 15:00:07 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=105441</guid>

					<description><![CDATA[The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column storyUpdate text-lead text-color-xsdn-color" ></p>
<p style="text-align: center;"><span style="color: #ffffff;">March 24, 2025 Update:<br />
The weeknight full closures of southbound 71 have been extended through April 4</span></p>
<p>
</div><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to be prepared for weeknight (Monday &#8211; Friday) full closures of southbound 71 from Butterfield Ranch Rd/Euclid Ave to the 91. The closures of southbound 71 will begin Monday, March 3 through Friday, April 11 as part of <a href="https://www.rctc.org/projects/71-91-interchange-project/">RCTC’s 71/91 Interchange Project</a>. The southbound 71 to eastbound and westbound 91 connectors will also be closed during this time.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and 11:59 p.m. to 6 a.m. on Friday nights. These nighttime closures will allow construction crews to safely remove support structures from the recently constructed new sections of the connector. Additional nighttime lane reduction configurations along eastbound and westbound 91 may also occur during these nightly closures.</p>
<p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100937" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png'"><img fetchpriority="high" decoding="async" class="wp-image-100937" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>The new non-tolled interchange is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, enhance traffic flow, and support continued movement of native wildlife through the area. Construction began in 2023 and is expected to be completed later this year. To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project <a href="https://www.rctc.org/projects/71-91-interchange-project/">webpage</a>. For the latest closure information, visit: <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a></p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</title>
		<link>https://www.rctc.org/westbound-91-full-weeknight-closures-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 25 Nov 2024 23:26:33 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=103625</guid>

					<description><![CDATA[The Point: Closures will allow crews to safely continue removing support structures above the 91]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely continue removing support structures above the 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling through Corona are advised to steer clear of full weeknight closures of westbound 91. Beginning December 2, 2024, the westbound 91 will be closed between the 71 and Green River Road on Monday through Wednesday nights as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a>. The closures are scheduled through Wednesday, December 18, 2024.</p>
<p><strong>Due to the holidays, no closures will be scheduled from December 20 through January 1, 2025. Closures are anticipated to restart on Monday, January 6, 2025.</strong></p>
<p>The full closure will allow crews to remove more than 40 beams of support structures that span above the westbound 91 lanes. This work requires precision and time to be completed safely. Over the summer, crews completed a similar operation with the removal of support structures over eastbound 91.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="h3 object-size self-video fluid-object" style="padding-top: 56.25%"><div style="width: 640px;" class="wp-video"><video class="wp-video-shortcode" id="video-103625-1" width="640" height="360" loop autoplay preload="metadata" controls="controls" playsinline data-keepplaying><source type="video/mp4" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4?_=1"><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4">https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4</a></video></div></div></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Motorists traveling on the westbound 91 and southbound 71 should plan extra time to reach local destinations and businesses in the area. Detailed closure information below:</p>
<table style="width: 100%;">
<colgroup>
<col style="width: 30%;" span="1" />
<col style="width: 70%;" span="1" /> </colgroup>
<tbody>
<tr>
<th style="text-align: center;">
<h4><strong>Date &amp; Time</strong></h4>
</th>
<th style="text-align: center;">
<h4><strong>Location</strong></h4>
</th>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
10 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full closure of westbound 91 lanes from the 71 to Green River Road</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full westbound 91 Express Lanes closures from I-15 to the Orange County/Riverside County Line</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 5 a.m.</td>
<td style="text-align: center;">Full southbound 71 to westbound 91 connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full northbound/southbound 15 to westbound 91 Express Lanes connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 4 a.m.</td>
<td style="text-align: center;">Westbound 91 Green River Road off-ramp closure</td>
</tr>
</tbody>
</table>
<p>To avoid lengthy traffic delays, motorists are highly advised to avoid the westbound 91 by using the northbound 71 to westbound 60 to southbound 57 to get around the closure. Construction activity is subject to change due to weather or other factors.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 74.5%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" class="pushed" data-active="1" data-lbox="ilightbox_single-103127" data-options="width:1198,height:893,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png'"><img decoding="async" class="wp-image-103127" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" width="1198" height="893" alt="1124 WB91 Closures Detour Map" srcset="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png 1198w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png 300w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-1024x763.png 1024w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-768x572.png 768w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-500x373.png 500w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-800x596.png 800w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-350x261.png 350w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-48x36.png 48w" sizes="(max-width: 1198px) 100vw, 1198px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">RCTC, in partnership with Caltrans, is reconstructing the 71/91 interchange in Corona. The project will replace the single-lane loop connector between the eastbound 91 and northbound 71 with a new, two-lane, direct connector ramp. The project is anticipated to be completed in 2025. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">To register for construction updates, text </span><i><span data-contrast="auto">7191interchange</span></i><span data-contrast="auto"> to (855) 793-2625 or sign up through the project </span><a href="https://www.rctc.org/projects/71-91-interchange-project/"><span data-contrast="none">webpage</span></a><span data-contrast="auto">. View the latest construction activity at: </span><a href="https://www.rctc.org/7191updates/"><span data-contrast="none">rctc.org/7191updates</span></a><span data-ccp-props="{}"> </span></p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</title>
		<link>https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 13 Sep 2024 22:05:09 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=101448</guid>

					<description><![CDATA[The Point: Closures will allow crews to safely build support structures for the new connector]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely build support structures for the new connector</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to stay alert for weeknight full closures of southbound 71 at Butterfield Ranch Rd/Euclid Ave. The Monday through Friday nighttime closures of southbound 71 are scheduled from Monday, September 16 through late-October as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project.</a> The southbound 71 to eastbound and westbound 91 connectors will also be closed.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and midnight to 6 a.m. on Friday nights. During these nighttime closures, construction crews will be building a new portion of support structures for the new eastbound 91 to northbound 71 connector. Additional nighttime lane reductions along eastbound and westbound 91 may also occur during these nightly closures.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/iHQLK-pg33M" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>. For the latest closure information, visit <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</title>
		<link>https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 14 Aug 2024 14:00:38 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100704</guid>

					<description><![CDATA[The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists making their way south through Chino and Chino Hills should avoid the southbound 71 or be prepared to face heavy traffic delays. RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> will require a full weekend closure beginning Friday, August 16 at 10 p.m. through Monday, August 19 at 5 a.m.</p>
<p>The full closure will safely allow crews to pave and stripe the final portion of the newly aligned southbound 71 lanes. During the weekend closure, crews will also perform a traffic switch to shift traffic onto these new lanes. This shift will extend southbound 71, create additional space for the new connector, and allow it to connect to northbound 71 lanes.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/L3Ngvy37SM4" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid lengthy traffic delays, motorists are highly advised to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on the southbound 71 will be rerouted to the Butterfield Ranch Rd./Euclid Ave. off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave. to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>Make sure to stay informed by signing up for construction updates &#8211; text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Ahead &#8211; Weeknight Closures of Eastbound 91 in Corona to Begin July 15</title>
		<link>https://www.rctc.org/weeknight-closures-eastbound-91-july-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 17:44:58 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100171</guid>

					<description><![CDATA[The Point: Closures will allow crews to safely remove support structures above the eastbound 91]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely remove support structures above the eastbound 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Traveling through Corona at night this summer? There are road closures in the works that you should know about. Motorists driving on the eastbound 91 Monday through Wednesday nights should plan ahead for traffic delays. Starting Monday, July 15, weeknight closures of the eastbound 91 general purpose lanes and Express Lanes are scheduled as part of the <a href="https://www.rctc.org/7191closures/">71/91 Interchange Project</a> in Corona. The eastbound Green River Road on-ramp will also be closed at night.</p>
<p><strong>Closures are as scheduled:</strong></p>
<ul>
<li><strong>LOCATION: Eastbound 91, from Green River Rd. to Serfas Club Dr./Auto Center Dr.</strong>
<ul>
<li>Includes eastbound 91 general purpose lanes, Express Lanes, and Green River Rd. on-ramp</li>
</ul>
</li>
<li><strong>DAYS &amp; TIMES: Nightly, Monday through Wednesday from 11:00 p.m. to 5:00 a.m.</strong></li>
<li><strong>DURATION: July 15 – August 14, 2024</strong></li>
</ul>
<p><strong>The southbound 71 connectors to eastbound and westbound 91 will remain open.</strong></p>
<p>The closures will allow crews to safely remove support structures above the eastbound 91 that were constructed in 2023 and early 2024. These support structures were used to form the foundation of the new connector. The removal process will take place over several weeks, Monday through Wednesday nights, beginning July 15.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 63.5%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-100180" data-options="width:2000,height:1270,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-300x191.jpg'"><img decoding="async" class="wp-image-100180" src="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg" width="2000" height="1270" alt="0724 Point 7191 EB91 Closures Falsework Construction" srcset="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg 2000w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-300x191.jpg 300w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1024x650.jpg 1024w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-768x488.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1536x975.jpg 1536w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-500x318.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-800x508.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1280x813.jpg 1280w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1920x1219.jpg 1920w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-350x222.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-24x15.jpg 24w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-36x23.jpg 36w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-48x30.jpg 48w" sizes="(max-width: 2000px) 100vw, 2000px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Motorists traveling on the eastbound 91 are advised to avoid the area and use northbound 57 to eastbound 60 to the southbound 71. Corona residents may use Green River Rd. to Palisades Drive to Serfas Club Dr./Auto Center Dr. to enter eastbound 91. Motorists should allow extra travel time to reach local businesses, which will remain open. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 74.2%;"></div><a href="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png" class="pushed" data-active="1" data-lbox="ilightbox_single-93081" data-options="width:2479,height:1839,thumbnail: 'https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-300x223.png'"><img decoding="async" class="wp-image-93081" src="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png" width="2479" height="1839" alt="RCTC 7191 FalseworkClosures RegionalDetour EB V1" srcset="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png 2479w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-300x223.png 300w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1024x760.png 1024w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-768x570.png 768w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1536x1139.png 1536w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-2048x1519.png 2048w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-500x371.png 500w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-800x593.png 800w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1280x950.png 1280w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1920x1424.png 1920w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-350x260.png 350w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-48x36.png 48w" sizes="(max-width: 2479px) 100vw, 2479px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p><em>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</em></p>
<p>To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Weeknight Closures of Eastbound 91 in Corona Continuing Through November 21</title>
		<link>https://www.rctc.org/plan-ahead-for-weeknight-closures-of-eastbound-91-in-corona-starting-on-october-16/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 16 Oct 2023 23:03:23 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[october]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=93058</guid>

					<description><![CDATA[The Point: Closures will allow crews to safely construct new connector formwork and support structures across the entire width of the 91]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures allow crews to safely construct new connector formwork and support structures across the entire width of the 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists heading east should steer clear of eastbound 91 in Corona or plan for heavy traffic delays due to full eastbound 91 closures Monday through Wednesday nights starting Monday, October 16 through Tuesday, November 21.</p>
<p>Closures allow crews to safely construct support structures extending across the entire width of the 91 as part of the <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a>. Support formwork for the new connector on top of the tunnel will be approximately 30 feet tall and utilize over 200 beams that will be positioned.</p>
<p>The weeknight closures include:</p>
<ul>
<li>Full eastbound closure of 91 lanes from Green River Road to Serfas Club Drive, Monday through Wednesday from 11 p.m. to 5 a.m.</li>
<li>Full eastbound 91 Express Lanes will be closed in Riverside and Orange counties from Monday – Wednesday 10 p.m. to 6 a.m.</li>
<li>Eastbound on-ramp closure at Green River Road from Monday &#8211; Wednesday 10 p.m. to 6 a.m.</li>
</ul>
<p>During the weeknight closures, motorists can reduce time in traffic by using northbound 57 to eastbound 60 to southbound 71. Please use caution during travel and plan extra time to arrive to your destination. The suggested detour route is shown below.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 90%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 75.1%;"></div><a href="https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH.png" class="pushed" data-active="1" data-lbox="ilightbox_single-93019" data-options="width:2473,height:1857,thumbnail: 'https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-300x225.png'"><img decoding="async" class="wp-image-93019" src="https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH.png" width="2473" height="1857" alt="7191 FalseworkClosures RegionalDetour EB V1 SPANISH" srcset="https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH.png 2473w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-300x225.png 300w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-1024x769.png 1024w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-768x577.png 768w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-1536x1153.png 1536w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-2048x1538.png 2048w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-500x375.png 500w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-800x601.png 800w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-1280x961.png 1280w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-1920x1442.png 1920w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-350x263.png 350w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2023/10/7191_FalseworkClosures_RegionalDetour_EB_V1_SPANISH-48x36.png 48w" sizes="(max-width: 2473px) 100vw, 2473px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>West Corona residents may utilize the eastbound 91 exit at Green River Road to Palisades Drive or Serfas Club Drive to re-enter to eastbound 91. Access will remain available for fire, police, and ambulance for emergency response.</p>
<p>Construction activity is subject to change due to weather or unforeseen circumstances. Weeknight westbound 91 full closures are expected to begin following the completion of the eastbound support structure work.</p>
<p>The 71/91 Interchange began construction in February and the anticipated opening of the connector is slated for 2025. This project will create a two-lane direct connector between eastbound 91 and northbound 71 to replace the existing single-lane loop connector. This enhancement is intended to improve safety, develop alternative modes of transportation, reduce greenhouse gas emissions, and optimize traffic flow. The $137 million investment is providing 1,677 jobs during construction.</p>
<p>To register for construction updates, text 7191INTERCHANGE to 77222 or sign up through the project webpage, <a href="https://www.rctc.org/7191closures">rctc.org/7191closures</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
