<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>design-build Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/design-build/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Mon, 20 Apr 2020 20:33:23 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>design-build Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>RCTC Awards Contract to Design, Build Connection between 91 Express Lanes, 15 Express Lanes</title>
		<link>https://www.rctc.org/award-design-build-firm-15-91-connector/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 20 Apr 2020 20:31:30 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15-91 Connector]]></category>
		<category><![CDATA[award]]></category>
		<category><![CDATA[design-build]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[riverside]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=74413</guid>

					<description><![CDATA[<p>The Point: Design work starting now and construction to start in 2021; approximately 1,800 new jobs expected</p>
<p>The post <a href="https://www.rctc.org/award-design-build-firm-15-91-connector/">RCTC Awards Contract to Design, Build Connection between 91 Express Lanes, 15 Express Lanes</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 one-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: </strong><strong>Design work starting now and construction to start in 2021; approximately 1,800 new jobs expected</strong></p>
<p>One of the most requested improvements to the area near the 15 and 91 interchange in Corona is moving forward.</p>
<p>The Riverside County Transportation Commission approved a $165 million contract last month with Myers-Rados Joint Venture to design and build the <a href="https://www.rctc.org/projects/15-91-express-lanes-connector/">15/91 Express Lane Connector</a>, which will provide the missing link between the two tolled facilities. The total project cost is estimated at $270 million.</p>
<p>Although the COVID-19 crisis is continuing, the Governor’s Executive Order N-33-20 has designated employees of construction sites and projects as part of California’s essential workforce, so work on this project is proceeding.</p>
<p>When completed, drivers will be able to travel from the eastbound 91 Express Lanes to the northbound 15 Express Lanes that are under construction now, and from the future southbound 15 Express Lanes to the westbound 91 Express Lanes. These new structures will allow easier access to the 91 corridor for residents of Eastvale, Jurupa Valley, and Norco.</p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The project also will extend the eastbound 91 Express Lanes and an adjacent eastbound 91 general-purpose lane about one-half mile east to Promenade Avenue in Corona. This eastern extension will help with vehicle merging in this area.</p>
<p>The project will:</p>
<ul>
<li>Allow a seamless transition between the 91 and 15 tolled Express Lanes</li>
<li>Reduce traffic congestion at the interchange and along eastbound 91</li>
<li>Improve travel time reliability</li>
<li>Enhance safety by reducing lane merging</li>
<li>Add approximately 1,800 jobs, based on methodology from the Federal Highway Administration</li>
</ul>
<p>Design work will be under way through spring 2021, followed by construction. During construction, drivers should expect nighttime lane closures and connector closures, as well as weekend closures. The new connector is expected to open in 2023.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 77%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img fetchpriority="high" decoding="async" class="wp-image-74416" src="https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-scaled.jpg" width="1706" height="2560" alt="" srcset="https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-scaled.jpg 1706w, https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-200x300.jpg 200w, https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-683x1024.jpg 683w, https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-768x1152.jpg 768w, https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-1024x1536.jpg 1024w, https://www.rctc.org/wp-content/uploads/2020/03/5U5A5240-1365x2048.jpg 1365w" sizes="(max-width: 1706px) 100vw, 1706px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>“Building this connector will improve the way we travel in Riverside County and offer more choices for drivers,” said Commission Chair Ben J. Benoit, who also serves as a Wildomar City Council member. “Design work that is starting now will be performed using safe practices, with most staff working remotely. Projects like these reflect our Commission’s fiscal responsibility and are providing new jobs that are important for Riverside County’s economic recovery,” he said.</p>
<p>Funding totaling $180 million is provided by <a href="https://www.rctc.org/projects/rctec/">Senate Bill 132</a>, as well as $90 million from surplus toll revenue. Senate Bill 132 was a special transportation funding bill by State Assembly Member Sabrina Cervantes and State Senator Richard Roth that was approved by the Governor in 2017. The unprecedented legislation also funded four other transportation projects in Riverside County.</p>
<p>Revenue collected from tolls is used to operate and maintain the lanes and to repay the construction debt. Surplus revenue is reserved for additional transportation improvements in the corridor, including this project and the <a href="https://www.rctc.org/state-route-91-corridor-operations-project/">91 Corridor Operations Project</a>, a new westbound lane between Green River Road and Route 241, scheduled to start this fall.</p>
</div></div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/award-design-build-firm-15-91-connector/">RCTC Awards Contract to Design, Build Connection between 91 Express Lanes, 15 Express Lanes</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Shortlists Four Design-Build Firms for 15/91 Express Lanes Connector</title>
		<link>https://www.rctc.org/four-design-build-firms-15-91-express-lanes-connector/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 23 May 2019 15:02:23 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[15-91 Connector]]></category>
		<category><![CDATA[design-build]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[riverside]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[shortlist]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=71200</guid>

					<description><![CDATA[<p>Connector Will Provide Smooth Transition between 91 Express Lanes, 15 Express Lanes</p>
<p>The post <a href="https://www.rctc.org/four-design-build-firms-15-91-express-lanes-connector/">RCTC Shortlists Four Design-Build Firms for 15/91 Express Lanes Connector</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 one-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Connector Will Provide Smooth Transition between 91 Express Lanes, 15 Express Lanes</strong></p>
<p>Design and construction of the 15/91 Express Lanes Connector moved a step further with the selection of four firms to submit proposals for design and construction.</p>
<p>The Riverside County Transportation Commission received statements of qualifications in April from seven design-build teams and chose the following four to continue with the selection process:</p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>1. Flatiron West, Inc.</p>
<p>2. Guy F. Atkinson</p>
<p>3. MCM Construction, Inc.</p>
<p style="text-align: left;">4. Myers-Rados</p>
<p>Proposals are due in November. RCTC expects to choose a design-builder by early 2020. Construction may begin in fall 2020, and the connector is anticipated to open in late 2022.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 95%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-71201" src="https://www.rctc.org/wp-content/uploads/2019/05/pexels-photo-1329061.jpeg" width="2247" height="1500" alt="photo of hard hats" srcset="https://www.rctc.org/wp-content/uploads/2019/05/pexels-photo-1329061.jpeg 2247w, https://www.rctc.org/wp-content/uploads/2019/05/pexels-photo-1329061-300x200.jpeg 300w, https://www.rctc.org/wp-content/uploads/2019/05/pexels-photo-1329061-768x513.jpeg 768w, https://www.rctc.org/wp-content/uploads/2019/05/pexels-photo-1329061-1024x684.jpeg 1024w" sizes="(max-width: 2247px) 100vw, 2247px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The connector will link the eastbound 91 Express Lanes with the northbound 15 Express Lanes that are currently under construction. It also will link the southbound 15 Express Lanes that are being built with the westbound 91 Express Lanes. Linking the two tolled facilities will expand RCTC’s express lane network and provide more travel time savings and travel time certainty.</p>
<p>Funding to build the connector was not available as part of the 91 Project or the 15 Express Lane Project. Plans for the connector originally were included in the 91 Project, but a downturn in the economy required RCTC to reduce the scope of the project.</p>
<p>RCTC received $180 million in state funding for the Express Lanes Connector, which is estimated to cost $220 million. The balance of funding will be provided by toll revenue that has been collected from the 91 Express Lanes or from grant funding, if RCTC is successful in receiving funding from a federal grant application submitted in March.</p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/four-design-build-firms-15-91-express-lanes-connector/">RCTC Shortlists Four Design-Build Firms for 15/91 Express Lanes Connector</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
