<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>91 Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/91/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Tue, 30 Jun 2026 17:54:26 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>91 Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</title>
		<link>https://www.rctc.org/new-71-91-interchange-opens/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 23 Jun 2025 15:14:20 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[71/91 interchange]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Green River Road]]></category>
		<category><![CDATA[highway]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[Measure A Successes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106999</guid>

					<description><![CDATA[<p>New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</p>
<p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: New, non-tolled eastbound 91 to northbound 71 connector will improve safety and access</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Over the past two years, the residents of the Corona, Chino, and Chino Hills communities – and countless travelers on the 71 and 91 – have seen the impressive 71/91 connector take shape. After the recent weekend closure of the eastbound 91 Green River Rd. on-ramp, where crews safely performed a traffic switch to get the new connector and on-ramp ready for vehicles, the new interchange is now open to motorists!</p>
<p>Crews opened the new eastbound 91 to northbound 71 connector to highway traffic on Saturday morning, June 21, and the realigned on-ramp on Monday, June 23.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107035" data-options="width:2560,height:1440,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg'"><img fetchpriority="high" decoding="async" class="wp-image-107035" src="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg" width="2560" height="1440" alt="default" srcset="https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-scaled.jpg 2560w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-300x169.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1024x576.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-768x432.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1536x864.jpg 1536w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-2048x1152.jpg 2048w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-350x197.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-36x20.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-48x27.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-500x281.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-800x450.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1280x720.jpg 1280w, https://www.rctc.org/wp-content/uploads/2025/06/062325_7191_01-1920x1080.jpg 1920w" sizes="(max-width: 2560px) 100vw, 2560px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction of the <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> began in January 2023. As part of the project, crews built a new eastbound 91 to northbound 71 connector bridge that spans over the 91 and Santa Ana River. This new, two-lane direct connector replaces the old single-lane loop connector. The existing eastbound 91 Green River Rd. on-ramp was also realigned to provide direct access to the new northbound 71 connector and eastbound 91 general purpose lanes. Crews also constructed a new eastbound 91 auxiliary lane for improved access and merging with the new connector.</p>
<p>During construction, crews excavated 400,000 cubic yards of roadway, used over 9 million pounds of rebar, constructed over 4,000 cubic yards of retaining walls, and are expected to pour over 36,000 cubic yards of concrete by the end of the project. The new connector measures an impressive 100 feet in height and 2,500 feet in length.</p>
</div><div class="vc_row wideGallery row-internal row-container"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107004" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-300x200.jpg'"><img decoding="async" class="wp-image-107004" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_Banner_Web-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 Banner Web"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-107006" data-options="width:2000,height:1333,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-300x200.jpg'"><img decoding="async" class="wp-image-107006" src="https://www.rctc.org/wp-content/uploads/2025/06/0625_Point_7191_01-uai-2000x1125.jpg" width="2000" height="1125" alt="0625 Point 7191 01"></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The new, non-tolled connector is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, and enhance traffic flow – providing long-lasting benefits to Riverside County residents and the greater southern California region. The project will also support continued movement through this area by native wildlife such as mountain lions, bobcats, and coyotes.</p>
<p>Funding for the $137 million project was provided by federal, state, and local sources, including <a href="https://www.rctc.org/measure-a/">Measure A</a>; the twice voter-approved sales tax measure for transportation improvements in Riverside County. The delivery of this project further advances RCTC’s goal to improve mobility for the people of Riverside County.</p>
<p>For more information about this project, please visit: <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a></p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/new-71-91-interchange-opens/">New 71/91 Interchange Opens, Improving Travel and Connectivity in Riverside County and Beyond</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>60/91/215 Interchange Dedicated to Joseph Tavaglione</title>
		<link>https://www.rctc.org/60-91-215-interchange-dedication-joseph-tavaglione/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 17 Mar 2025 14:00:05 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Celebration]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[215]]></category>
		<category><![CDATA[60]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[Joseph Tavaglione]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=105374</guid>

					<description><![CDATA[<p>The Point: Joseph Tavaglione brought together the region to improve transportation in Riverside County</p>
<p>The post <a href="https://www.rctc.org/60-91-215-interchange-dedication-joseph-tavaglione/">60/91/215 Interchange Dedicated to Joseph Tavaglione</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Joseph Tavaglione brought together the region to improve transportation in Riverside County</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Born in 1923, Joseph Tavaglione spent much of his life improving Riverside County through his community service for better transportation infrastructure across the region. Joe was appointed by Governor Gray Davis, Governor Arnold Schwarzenegger, Governor Jerry Brown, and Governor Gavin Newson to serve on the California Transportation Commission (CTC) where he was recognized as one of the longest serving members. As a CTC Commissioner, he took a part in approving billions of dollars in funding for transportation infrastructure in the Inland Empire.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 85%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.2%;"></div><img decoding="async" class="wp-image-105381" src="https://www.rctc.org/wp-content/uploads/2025/02/0225_Point_Tavaglione_Sign-uai-1047x588.jpg" width="1047" height="588" alt="0225 Point Tavaglione Sign"></div>
					</div>
				</div></div></div></div><figcaption>Joseph Tavaglione Memorial Interchange highway sign at the 60/91/215 interchange</figcaption></div><div class="uncode_text_column text-lead" ><p>On January 22, 2025, family, friends, and community leaders gathered in Riverside to honor the legacy and memory of Joe who passed away on August 1, 2024, at the age of 101. In recognition of his substantial contributions to our region’s transportation system, the California State Legislature officially designated the 60/91/215 interchange as the “Joseph Tavaglione Memorial Interchange.”</p>
<p>The 60/91/215 Interchange project, located at the heart of the Inland Empire, was completed in 2008 and is just one example of his tireless efforts to make sure that transportation projects in the Inland Empire were funded and completed. Joe’s leadership and vision united transportation leaders, elected officials, and community members not just in the Inland Empire but across California to work together to improve the state’s transportation system.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 85%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.2%;"></div><img decoding="async" class="wp-image-105436" src="https://www.rctc.org/wp-content/uploads/2025/02/0225_Point_Tavaglione_03-uai-1090x613.jpeg" width="1090" height="613" alt="0225 Point Tavaglione 03"></div>
					</div>
				</div></div></div></div><figcaption>Joe Tavaglione was a champion for Riverside County and the Inland Empire</figcaption></div><div class="uncode_text_column text-lead" ><p>Joe’s leadership ensured our communities received state funding for widening I-215, SR-91, I-15, and SR-60, and constructing the Perris Valley Line, railroad grade separations, interchanges, and active transportation projects across all corners of Riverside County. Joe’s contributions to transportation planning and infrastructure, economic development, and various charitable causes have not only left a lasting impact on Riverside County and the broader southern California region but brought our communities closer together.</p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/60-91-215-interchange-dedication-joseph-tavaglione/">60/91/215 Interchange Dedicated to Joseph Tavaglione</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</title>
		<link>https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 27 Feb 2025 15:00:07 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=105441</guid>

					<description><![CDATA[<p>The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes</p>
<p>The post <a href="https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/">Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column storyUpdate text-lead text-color-xsdn-color" ></p>
<p style="text-align: center;"><span style="color: #ffffff;">March 24, 2025 Update:<br />
The weeknight full closures of southbound 71 have been extended through April 4</span></p>
<p>
</div><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to be prepared for weeknight (Monday &#8211; Friday) full closures of southbound 71 from Butterfield Ranch Rd/Euclid Ave to the 91. The closures of southbound 71 will begin Monday, March 3 through Friday, April 11 as part of <a href="https://www.rctc.org/projects/71-91-interchange-project/">RCTC’s 71/91 Interchange Project</a>. The southbound 71 to eastbound and westbound 91 connectors will also be closed during this time.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and 11:59 p.m. to 6 a.m. on Friday nights. These nighttime closures will allow construction crews to safely remove support structures from the recently constructed new sections of the connector. Additional nighttime lane reduction configurations along eastbound and westbound 91 may also occur during these nightly closures.</p>
<p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100937" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png'"><img decoding="async" class="wp-image-100937" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>The new non-tolled interchange is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, enhance traffic flow, and support continued movement of native wildlife through the area. Construction began in 2023 and is expected to be completed later this year. To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project <a href="https://www.rctc.org/projects/71-91-interchange-project/">webpage</a>. For the latest closure information, visit: <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a></p>
</div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/">Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</title>
		<link>https://www.rctc.org/westbound-91-full-weeknight-closures-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 25 Nov 2024 23:26:33 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=103625</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely continue removing support structures above the 91</p>
<p>The post <a href="https://www.rctc.org/westbound-91-full-weeknight-closures-2024/">Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely continue removing support structures above the 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling through Corona are advised to steer clear of full weeknight closures of westbound 91. Beginning December 2, 2024, the westbound 91 will be closed between the 71 and Green River Road on Monday through Wednesday nights as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a>. The closures are scheduled through Wednesday, December 18, 2024.</p>
<p><strong>Due to the holidays, no closures will be scheduled from December 20 through January 1, 2025. Closures are anticipated to restart on Monday, January 6, 2025.</strong></p>
<p>The full closure will allow crews to remove more than 40 beams of support structures that span above the westbound 91 lanes. This work requires precision and time to be completed safely. Over the summer, crews completed a similar operation with the removal of support structures over eastbound 91.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="h3 object-size self-video fluid-object" style="padding-top: 56.25%"><div style="width: 640px;" class="wp-video"><video class="wp-video-shortcode" id="video-103625-1" width="640" height="360" loop autoplay preload="metadata" controls="controls" playsinline data-keepplaying><source type="video/mp4" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4?_=1"><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4">https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4</a></video></div></div></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Motorists traveling on the westbound 91 and southbound 71 should plan extra time to reach local destinations and businesses in the area. Detailed closure information below:</p>
<table style="width: 100%;">
<colgroup>
<col style="width: 30%;" span="1" />
<col style="width: 70%;" span="1" /> </colgroup>
<tbody>
<tr>
<th style="text-align: center;">
<h4><strong>Date &amp; Time</strong></h4>
</th>
<th style="text-align: center;">
<h4><strong>Location</strong></h4>
</th>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
10 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full closure of westbound 91 lanes from the 71 to Green River Road</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full westbound 91 Express Lanes closures from I-15 to the Orange County/Riverside County Line</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 5 a.m.</td>
<td style="text-align: center;">Full southbound 71 to westbound 91 connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full northbound/southbound 15 to westbound 91 Express Lanes connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 4 a.m.</td>
<td style="text-align: center;">Westbound 91 Green River Road off-ramp closure</td>
</tr>
</tbody>
</table>
<p>To avoid lengthy traffic delays, motorists are highly advised to avoid the westbound 91 by using the northbound 71 to westbound 60 to southbound 57 to get around the closure. Construction activity is subject to change due to weather or other factors.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 74.5%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" class="pushed" data-active="1" data-lbox="ilightbox_single-103127" data-options="width:1198,height:893,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png'"><img decoding="async" class="wp-image-103127" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" width="1198" height="893" alt="1124 WB91 Closures Detour Map" srcset="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png 1198w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png 300w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-1024x763.png 1024w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-768x572.png 768w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-500x373.png 500w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-800x596.png 800w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-350x261.png 350w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-48x36.png 48w" sizes="(max-width: 1198px) 100vw, 1198px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">RCTC, in partnership with Caltrans, is reconstructing the 71/91 interchange in Corona. The project will replace the single-lane loop connector between the eastbound 91 and northbound 71 with a new, two-lane, direct connector ramp. The project is anticipated to be completed in 2025. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">To register for construction updates, text </span><i><span data-contrast="auto">7191interchange</span></i><span data-contrast="auto"> to (855) 793-2625 or sign up through the project </span><a href="https://www.rctc.org/projects/71-91-interchange-project/"><span data-contrast="none">webpage</span></a><span data-contrast="auto">. View the latest construction activity at: </span><a href="https://www.rctc.org/7191updates/"><span data-contrast="none">rctc.org/7191updates</span></a><span data-ccp-props="{}"> </span></p>
</div></div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/westbound-91-full-weeknight-closures-2024/">Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Measure A Funding Working Hard for Riverside County Residents, Helped Build La Sierra Interchange</title>
		<link>https://www.rctc.org/measure-a-funding-working-hard-for-riverside-county-residents-helped-build-la-sierra-interchange/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 26 Sep 2024 16:44:21 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[la sierra]]></category>
		<category><![CDATA[Measure A Successes]]></category>
		<category><![CDATA[overcrossing]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=101710</guid>

					<description><![CDATA[<p>The Point: Essential infrastructure in the region made possible by Measure A funding</p>
<p>The post <a href="https://www.rctc.org/measure-a-funding-working-hard-for-riverside-county-residents-helped-build-la-sierra-interchange/">Measure A Funding Working Hard for Riverside County Residents, Helped Build La Sierra Interchange</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="NormalTextRun SCXW6753132 BCX8">Essential infrastructure in the region</span><span class="NormalTextRun SCXW6753132 BCX8"> made possible by Measure A funding</span></strong></p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-3 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="fluid-svg"><span id="icon-785836" style="width:px" class="icon-media"><img decoding="async" src="https://www.rctc.org/wp-content/uploads/2024/04/2023_Measure_A_Logo_Blue.svg" alt="2023 Measure A Logo Blue"></span></div></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-9 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>For nearly three decades, Measure A has provided Riverside County residents with an opportunity to invest in their future by raising much-needed funding for transportation projects that help keep our communities connected and maintain the region’s mobility options. Measure A was approved by voters in 1988 and again in 2002. The funds are exclusively used for transportation improvements countywide and in every city. In many cases, Measure A dollars are leveraged for additional state and federal funding needed to pay for highways, public transportation, local streets and roads improvements, as well as alternative transportation needs throughout the region.</p>
</div></div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>The La Sierra Interchange Project is a crucial example of a significant project partially funded by Measure A. Located on the western side of Riverside County, it was made possible through a partnership between the City of Riverside, California Department of Transportation (Caltrans), Western Riverside Council of Governments, and Riverside County Transportation Commission (RCTC). Construction for the $38 million project began in October 2007 and was completed in 2009.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit.png" class="pushed" data-active="1" data-lbox="ilightbox_single-101765" data-options="width:1920,height:1080,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-300x169.png'"><img decoding="async" class="wp-image-101765" src="https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit.png" width="1920" height="1080" alt="La Sierra EDit" srcset="https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit.png 1920w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-300x169.png 300w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-1024x576.png 1024w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-768x432.png 768w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-1536x864.png 1536w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-500x281.png 500w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-800x450.png 800w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-1280x720.png 1280w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-350x197.png 350w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-24x14.png 24w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-36x20.png 36w, https://www.rctc.org/wp-content/uploads/2024/09/La-Sierra-EDit-48x27.png 48w" sizes="(max-width: 1920px) 100vw, 1920px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The bridge located on La Sierra Avenue between Diana Street and Indiana Street had only two lanes in each direction. The completed project added additional lanes in each direction with dual left turn lanes implemented to streamline entry on the expanded La Sierra on-ramp. The completed 6-lane bridge stretches over the BNSF railroad tracks and above the 91 freeway. The city of Riverside led the La Sierra on-ramp improvements, which was widened to three lanes, constructed retaining walls along the ramps, and included landscaping for the surrounding area.</p>
<p>Measure A contributed $4,184,742 in funding for this essential project. The project has improved connectivity, enhanced traffic flow, and increased safety for Riverside County residents.</p>
</div><div class="empty-space empty-double" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/measure-a-funding-working-hard-for-riverside-county-residents-helped-build-la-sierra-interchange/">Measure A Funding Working Hard for Riverside County Residents, Helped Build La Sierra Interchange</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</title>
		<link>https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 13 Sep 2024 22:05:09 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=101448</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely build support structures for the new connector</p>
<p>The post <a href="https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/">Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely build support structures for the new connector</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to stay alert for weeknight full closures of southbound 71 at Butterfield Ranch Rd/Euclid Ave. The Monday through Friday nighttime closures of southbound 71 are scheduled from Monday, September 16 through late-October as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project.</a> The southbound 71 to eastbound and westbound 91 connectors will also be closed.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and midnight to 6 a.m. on Friday nights. During these nighttime closures, construction crews will be building a new portion of support structures for the new eastbound 91 to northbound 71 connector. Additional nighttime lane reductions along eastbound and westbound 91 may also occur during these nightly closures.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/iHQLK-pg33M" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>. For the latest closure information, visit <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/">Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</title>
		<link>https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 14 Aug 2024 14:00:38 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100704</guid>

					<description><![CDATA[<p>The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes</p>
<p>The post <a href="https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/">Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-18"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-18" data-row="script-row-unique-18" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-18"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-19"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists making their way south through Chino and Chino Hills should avoid the southbound 71 or be prepared to face heavy traffic delays. RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> will require a full weekend closure beginning Friday, August 16 at 10 p.m. through Monday, August 19 at 5 a.m.</p>
<p>The full closure will safely allow crews to pave and stripe the final portion of the newly aligned southbound 71 lanes. During the weekend closure, crews will also perform a traffic switch to shift traffic onto these new lanes. This shift will extend southbound 71, create additional space for the new connector, and allow it to connect to northbound 71 lanes.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/L3Ngvy37SM4" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid lengthy traffic delays, motorists are highly advised to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on the southbound 71 will be rerouted to the Butterfield Ranch Rd./Euclid Ave. off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave. to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>Make sure to stay informed by signing up for construction updates &#8211; text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-19" data-row="script-row-unique-19" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-19"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-20"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-20" data-row="script-row-unique-20" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-20"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/">Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Ahead &#8211; Weeknight Closures of Eastbound 91 in Corona to Begin July 15</title>
		<link>https://www.rctc.org/weeknight-closures-eastbound-91-july-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Tue, 09 Jul 2024 17:44:58 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100171</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely remove support structures above the eastbound 91</p>
<p>The post <a href="https://www.rctc.org/weeknight-closures-eastbound-91-july-2024/">Plan Ahead &#8211; Weeknight Closures of Eastbound 91 in Corona to Begin July 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-21"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely remove support structures above the eastbound 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-21" data-row="script-row-unique-21" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-21"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-22"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Traveling through Corona at night this summer? There are road closures in the works that you should know about. Motorists driving on the eastbound 91 Monday through Wednesday nights should plan ahead for traffic delays. Starting Monday, July 15, weeknight closures of the eastbound 91 general purpose lanes and Express Lanes are scheduled as part of the <a href="https://www.rctc.org/7191closures/">71/91 Interchange Project</a> in Corona. The eastbound Green River Road on-ramp will also be closed at night.</p>
<p><strong>Closures are as scheduled:</strong></p>
<ul>
<li><strong>LOCATION: Eastbound 91, from Green River Rd. to Serfas Club Dr./Auto Center Dr.</strong>
<ul>
<li>Includes eastbound 91 general purpose lanes, Express Lanes, and Green River Rd. on-ramp</li>
</ul>
</li>
<li><strong>DAYS &amp; TIMES: Nightly, Monday through Wednesday from 11:00 p.m. to 5:00 a.m.</strong></li>
<li><strong>DURATION: July 15 – August 14, 2024</strong></li>
</ul>
<p><strong>The southbound 71 connectors to eastbound and westbound 91 will remain open.</strong></p>
<p>The closures will allow crews to safely remove support structures above the eastbound 91 that were constructed in 2023 and early 2024. These support structures were used to form the foundation of the new connector. The removal process will take place over several weeks, Monday through Wednesday nights, beginning July 15.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 63.5%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-100180" data-options="width:2000,height:1270,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-300x191.jpg'"><img decoding="async" class="wp-image-100180" src="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg" width="2000" height="1270" alt="0724 Point 7191 EB91 Closures Falsework Construction" srcset="https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction.jpg 2000w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-300x191.jpg 300w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1024x650.jpg 1024w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-768x488.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1536x975.jpg 1536w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-500x318.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-800x508.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1280x813.jpg 1280w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-1920x1219.jpg 1920w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-350x222.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-24x15.jpg 24w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-36x23.jpg 36w, https://www.rctc.org/wp-content/uploads/2024/07/0724_Point_7191_EB91_Closures_Falsework_Construction-48x30.jpg 48w" sizes="(max-width: 2000px) 100vw, 2000px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Motorists traveling on the eastbound 91 are advised to avoid the area and use northbound 57 to eastbound 60 to the southbound 71. Corona residents may use Green River Rd. to Palisades Drive to Serfas Club Dr./Auto Center Dr. to enter eastbound 91. Motorists should allow extra travel time to reach local businesses, which will remain open. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 74.2%;"></div><a href="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png" class="pushed" data-active="1" data-lbox="ilightbox_single-93081" data-options="width:2479,height:1839,thumbnail: 'https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-300x223.png'"><img decoding="async" class="wp-image-93081" src="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png" width="2479" height="1839" alt="RCTC 7191 FalseworkClosures RegionalDetour EB V1" srcset="https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1.png 2479w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-300x223.png 300w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1024x760.png 1024w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-768x570.png 768w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1536x1139.png 1536w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-2048x1519.png 2048w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-500x371.png 500w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-800x593.png 800w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1280x950.png 1280w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-1920x1424.png 1920w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-350x260.png 350w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2023/10/RCTC_7191_FalseworkClosures_RegionalDetour_EB_V1-48x36.png 48w" sizes="(max-width: 2479px) 100vw, 2479px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p><em>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</em></p>
<p>To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-22" data-row="script-row-unique-22" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-22"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-23"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-23" data-row="script-row-unique-23" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-23"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/weeknight-closures-eastbound-91-july-2024/">Plan Ahead &#8211; Weeknight Closures of Eastbound 91 in Corona to Begin July 15</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>$12.5 Million in RCTC’s Congressional Requests Advance</title>
		<link>https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 10 Jun 2024 20:30:15 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Commission]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Federal Funding]]></category>
		<category><![CDATA[Funding]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Train]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[91 Corridor]]></category>
		<category><![CDATA[91/PVL]]></category>
		<category><![CDATA[metrolink]]></category>
		<category><![CDATA[Mid County Parkway]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=99977</guid>

					<description><![CDATA[<p>The Point: Federal funding requests would benefit numerous passenger rail and highway projects in Riverside County</p>
<p>The post <a href="https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/">$12.5 Million in RCTC’s Congressional Requests Advance</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-24"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Federal funding requests would benefit numerous passenger rail and highway projects in Riverside County</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-24" data-row="script-row-unique-24" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-24"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-25"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">The Riverside County Transportation Commission (RCTC) continues to make headways in the pursuit of much-needed federal funding for transportation improvements in Riverside County. Four Community Project Funding (CPF) projects totaling $12.5 million have received support from local members of Congress in the Fiscal Year 2025 Appropriations bill. These requests follow RCTC’s recent accomplishment of securing $9.5 million in federal funding.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Representative Young Kim has championed RCTC’s request for $4 million for the <a href="https://www.rctc.org/projects/91-eastbound-corridor-operations-project/">State Route 91 Eastbound Corridor Operations Project</a> (91 ECOP). The 91 ECOP will alleviate traffic congestion along eastbound </span><span data-contrast="auto">SR-</span><span data-contrast="auto">91 between the 241 Toll Road connector and SR-71 in Corona, especially during peak afternoon commute</span><span data-contrast="auto">s</span><span data-contrast="auto"> between Orange County and Riverside County</span><span data-contrast="auto">.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Senators Alex Padilla and Laphonza Butler have been instrumental in advancing RCTC’s request of $3 million for the <a href="https://www.rctc.org/projects/mid-county-parkway-ramona/">Mid County Parkway: Ramona Expressway Project</a>. This project, spanning an 8.6-mile stretch of road in the rapidly growing communities of Perris, San Jacinto, Nuevo, and Lakeview, is a significant step towards enhancing safety and furthering the vision of a multimodal corridor. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-667233" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-loop="true" data-dots="true" data-nav="true" data-navmobile="true" data-navskin="light" data-navspeed="400" data-autoplay="true" data-timeout="3000" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-90841  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="0523 Point 91ECOP Banner"  data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-90841" src="https://www.rctc.org/wp-content/uploads/2023/05/0523_Point_91ECOP_Banner-uai-2000x1125.jpg" width="2000" height="1125" alt="0523 Point 91ECOP Banner" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>State Route 91 Eastbound Corridor Operations Project</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-89043  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="0123 PVLDowntown 2571"  data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-89043" src="https://www.rctc.org/wp-content/uploads/2023/01/0123_PVLDowntown_2571-uai-2100x1181.jpg" width="2100" height="1181" alt="0123 PVLDowntown 2571" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>91/Perris Valley Line</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-67680  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="RCTC Mid-County Parkway Photo"  data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-67680" src="https://www.rctc.org/wp-content/uploads/2018/04/MCP-Photo-uai-1920x1080.jpg" width="1920" height="1080" alt="RCTC Mid-County Parkway Photo" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Mid County Parkway: Ramona Expressway</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-88127  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="1122 I 15 Express Lanes Point Cover"  data-lb-index="3"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-88127" src="https://www.rctc.org/wp-content/uploads/2022/11/1122_I-15_Express_Lanes_Point_Cover-uai-2100x1181.jpg" width="2100" height="1181" alt="1122 I 15 Express Lanes Point Cover" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Interstate 15 Express Lanes</span></p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p><span data-contrast="auto">Representative Ken Calvert has requested $3 million for the <a href="https://www.rctc.org/projects/i15-express-southern-extension/">Interstate 15 Express Lanes Project Southern Extension</a>. The project will extend the existing I-15 Express Lanes south by 14.5 miles between Corona and Lake Elsinore and will significantly improve traffic operations and enhance safety. For residents in the surrounding communities, I-15 is the lifeline connecting them to jobs, education, and regional destinations. Once completed, the project will increase travel choices</span><span data-contrast="auto">, allow for commuter buses,</span> <span data-contrast="auto">and improve travel time reliability</span><span data-contrast="auto">.</span></p>
<p><span data-contrast="auto">Representative Mark Takano has advanced RCTC’s $2.5 million request for the <a href="https://www.rctc.org/projects/metrolink-double-track-project-moreno-valley-perris/">Metrolink Double Track Project: Moreno Valley to Perris</a>. The project will upgrade 6.5 miles of existing freight track on the 91/Perris Valley Line between the Moreno Valley/March Field Station and just north of the Perris-Downtown Station. The historic tracks are currently rated for much slower speeds than passenger trains require, and the upgrade would improve the reliability of Metrolink service, increase access to jobs and education, and reduce air pollution in this rapidly expanding area of Riverside County.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">RCTC appreciates the leadership and efforts of Senators Padilla and Butler, as well as Representatives Calvert, Kim, and Takano, to bring federal transportation funding to Riverside County to enhance mobility and quality of life for its residents.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
</div></div></div></div></div></div><script id="script-row-unique-25" data-row="script-row-unique-25" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-25"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-26"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-26" data-row="script-row-unique-26" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-26"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/">$12.5 Million in RCTC’s Congressional Requests Advance</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Switching Sides: Weeknight Full Closures of Westbound 91 in Corona to Begin December 11</title>
		<link>https://www.rctc.org/weeknight-full-closures-of-westbound-91-in-corona-to-begin-december-11/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 06 Dec 2023 23:00:47 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Commission]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[71/91 interchange]]></category>
		<category><![CDATA[commute]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[projects]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=95208</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely continue construction of new connector formwork and support structures</p>
<p>The post <a href="https://www.rctc.org/weeknight-full-closures-of-westbound-91-in-corona-to-begin-december-11/">Switching Sides: Weeknight Full Closures of Westbound 91 in Corona to Begin December 11</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-27"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely continue construction of new connector formwork and support structures</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-27" data-row="script-row-unique-27" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-27"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-28"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Heading out of the Inland Empire on weeknights? Motorists are advised to stay alert for full westbound 91 closures between State Route 71 and Green River Road in Corona. Following the successful weeknight closures of eastbound 91 during October and November, full closure of westbound 91 will take place Monday through Wednesday nights starting on December 11 through January 24, 2024.</p>
<p><strong>Due to the holidays, no closures will be scheduled from December 22 through January 1, 2024. Nighttime closures will resume on Tuesday, January 2, 2024. </strong></p>
<p>The westbound 91 closures are needed to allow crews to safely construct support structures extending across the entire width of the 91 as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a>. The support formwork on top of the tunnel for the new connector will be approximately 30 feet in height with over 200 beams being positioned during these weeknight closures.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 80%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 57.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-95215" data-options="width:1700,height:979,thumbnail: 'https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-300x173.jpg'"><img decoding="async" class="wp-image-95215" src="https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework.jpg" width="1700" height="979" alt="1223 Point Westbound 91 Closures Falsework" srcset="https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework.jpg 1700w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-300x173.jpg 300w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-1024x590.jpg 1024w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-768x442.jpg 768w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-1536x885.jpg 1536w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-500x288.jpg 500w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-800x461.jpg 800w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-1280x737.jpg 1280w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-350x202.jpg 350w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-24x14.jpg 24w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-36x21.jpg 36w, https://www.rctc.org/wp-content/uploads/2023/12/1223_Point_Westbound_91_Closures_Falsework-48x28.jpg 48w" sizes="(max-width: 1700px) 100vw, 1700px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The weeknight closures include:</p>
<ul>
<li>Full closure of westbound 91 lanes from the 71 to Green River Road
<ul>
<li>Monday &#8211; Wednesday from 10 p.m. to 4 a.m.</li>
</ul>
</li>
<li>Full southbound 71 to westbound 91 closure
<ul>
<li>Monday &#8211; Wednesday from 9 p.m. to 5 a.m.</li>
</ul>
</li>
<li>Full westbound 91 Express Lanes closures from the 15/91 Interchange to the Orange County/Riverside County Line
<ul>
<li>Monday – Wednesday 8 p.m. to 4 a.m.</li>
</ul>
</li>
<li>Full southbound 15 to westbound 91 Express Lanes closures
<ul>
<li>Monday – Wednesday 8 p.m. to 4 a.m.</li>
</ul>
</li>
<li>Full northbound 15 to westbound 91 Express Lanes closures
<ul>
<li>Monday – Wednesday 8 p.m. to 4 a.m.</li>
</ul>
</li>
<li>Westbound 91 Green River Road off-ramp closure
<ul>
<li>Monday &#8211; Wednesday 9 p.m. to 4 a.m.</li>
</ul>
</li>
</ul>
<p>Motorists are advised to use the northbound 71 to westbound 60 to southbound 57 to navigate around the closure. Please use caution traveling through this area and plan extra time to arrive to your destination. The suggested detour route is shown below.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 80%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-95222" src="https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1.png" width="2460" height="1839" alt="RCTC 7191 FalseworkClosure RegionalDetour WB V1" srcset="https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1.png 2460w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-300x224.png 300w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-1024x766.png 1024w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-768x574.png 768w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-1536x1148.png 1536w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-2048x1531.png 2048w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-500x374.png 500w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-800x598.png 800w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-1280x957.png 1280w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-1920x1435.png 1920w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-350x262.png 350w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2023/12/RCTC_7191_FalseworkClosure_RegionalDetour_WB_V1-48x36.png 48w" sizes="(max-width: 2460px) 100vw, 2460px" /></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Access will remain available for fire, police, and ambulance units in case of emergency response. Construction activity is subject to change due to weather or unforeseen circumstances.</p>
<p>The 71/91 Interchange began construction in February and the anticipated opening of the connector is slated for 2025. This project will create a two-lane direct connector between eastbound 91 and northbound 71 to replace the existing single-lane loop connector. This enhancement is intended to improve safety, develop alternative modes of transportation, reduce greenhouse gas emissions, and optimize traffic flow. The $137 million investment is providing 1,677 jobs during construction.</p>
<p>To register for construction updates, text 7191INTERCHANGE to 77222 or sign up through the project webpage, <a href="https://www.rctc.org/7191closures">rctc.org/7191closures</a>.</p>
</div><div class="empty-space empty-double desktop-hidden tablet-hidden" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-28" data-row="script-row-unique-28" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-28"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-29"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-29" data-row="script-row-unique-29" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-29"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/weeknight-full-closures-of-westbound-91-in-corona-to-begin-december-11/">Switching Sides: Weeknight Full Closures of Westbound 91 in Corona to Begin December 11</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
