<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>60 &#8211; Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/tag/60/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.rctc.org</link>
	<description></description>
	<lastBuildDate>Wed, 23 Jul 2025 15:51:41 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>60 &#8211; Riverside County Transportation Commission (RCTC)</title>
	<link>https://www.rctc.org</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>60/91/215 Interchange Dedicated to Joseph Tavaglione</title>
		<link>https://www.rctc.org/60-91-215-interchange-dedication-joseph-tavaglione/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 17 Mar 2025 14:00:05 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Celebration]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[215]]></category>
		<category><![CDATA[60]]></category>
		<category><![CDATA[Interchange]]></category>
		<category><![CDATA[Joseph Tavaglione]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=105374</guid>

					<description><![CDATA[The Point: Joseph Tavaglione brought together the region to improve transportation in Riverside County]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Joseph Tavaglione brought together the region to improve transportation in Riverside County</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Born in 1923, Joseph Tavaglione spent much of his life improving Riverside County through his community service for better transportation infrastructure across the region. Joe was appointed by Governor Gray Davis, Governor Arnold Schwarzenegger, Governor Jerry Brown, and Governor Gavin Newson to serve on the California Transportation Commission (CTC) where he was recognized as one of the longest serving members. As a CTC Commissioner, he took a part in approving billions of dollars in funding for transportation infrastructure in the Inland Empire.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 85%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.2%;"></div><img fetchpriority="high" decoding="async" class="wp-image-105381" src="https://www.rctc.org/wp-content/uploads/2025/02/0225_Point_Tavaglione_Sign-uai-1047x588.jpg" width="1047" height="588" alt="0225 Point Tavaglione Sign"></div>
					</div>
				</div></div></div></div><figcaption>Joseph Tavaglione Memorial Interchange highway sign at the 60/91/215 interchange</figcaption></div><div class="uncode_text_column text-lead" ><p>On January 22, 2025, family, friends, and community leaders gathered in Riverside to honor the legacy and memory of Joe who passed away on August 1, 2024, at the age of 101. In recognition of his substantial contributions to our region’s transportation system, the California State Legislature officially designated the 60/91/215 interchange as the “Joseph Tavaglione Memorial Interchange.”</p>
<p>The 60/91/215 Interchange project, located at the heart of the Inland Empire, was completed in 2008 and is just one example of his tireless efforts to make sure that transportation projects in the Inland Empire were funded and completed. Joe’s leadership and vision united transportation leaders, elected officials, and community members not just in the Inland Empire but across California to work together to improve the state’s transportation system.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 85%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.2%;"></div><img decoding="async" class="wp-image-105436" src="https://www.rctc.org/wp-content/uploads/2025/02/0225_Point_Tavaglione_03-uai-1090x613.jpeg" width="1090" height="613" alt="0225 Point Tavaglione 03"></div>
					</div>
				</div></div></div></div><figcaption>Joe Tavaglione was a champion for Riverside County and the Inland Empire</figcaption></div><div class="uncode_text_column text-lead" ><p>Joe’s leadership ensured our communities received state funding for widening I-215, SR-91, I-15, and SR-60, and constructing the Perris Valley Line, railroad grade separations, interchanges, and active transportation projects across all corners of Riverside County. Joe’s contributions to transportation planning and infrastructure, economic development, and various charitable causes have not only left a lasting impact on Riverside County and the broader southern California region but brought our communities closer together.</p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Route 60 Truck Lanes Reach 60% Completion Milestone</title>
		<link>https://www.rctc.org/60-truck-lanes-60-percent/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 14 Apr 2021 18:17:55 +0000</pubDate>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Safety]]></category>
		<category><![CDATA[State Route 60]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[60]]></category>
		<category><![CDATA[milestone]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<category><![CDATA[Route 60 Truck Lanes]]></category>
		<category><![CDATA[SR-60]]></category>
		<category><![CDATA[truck lanes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=78706</guid>

					<description><![CDATA[The Point: New Lanes to Improve Safety and Mobility; Lanes Set to Open Summer 2022 ]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: New Lanes to Improve Safety and Mobility; Lanes Set to Open Summer 2022 </strong></p>
<p>It’s a changing landscape along Route 60 in the Riverside County “Badlands.” The Riverside County Transportation Commission began construction of the Route 60 Truck Lanes between Gilman Springs Road and Jack Rabbit Trail in June 2019, and a great deal has changed along this formerly very narrow roadway. The project is now 60% completed, with the new lanes expected to open in summer 2022.</p>
<p>The project is adding a truck lane in both directions to this 4.5-mile section of highway. The new lanes will separate big rigs from passenger vehicles with the new far-right lane dedicated to trucks. In addition, the project is widening the roadway shoulders and adding 18 feet of unpaved exterior shoulders by removing portions of hillside to create a safer drive through this curving corridor.</p>
<p>“This focus of this project is safety,” said RCTC Chair and Palm Desert Mayor Pro Tem Jan Harnik. “With the work that has been completed so far, we already have a wider and safer way to travel between the desert communities and Riverside. It’s been exciting to see how much progress our crews have made so far,” she said.</p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-78707" src="https://www.rctc.org/wp-content/uploads/2021/04/RCTC-SR-60-Construction-Infographic-031121-D2.png" width="1487" height="1066" alt="" srcset="https://www.rctc.org/wp-content/uploads/2021/04/RCTC-SR-60-Construction-Infographic-031121-D2.png 1487w, https://www.rctc.org/wp-content/uploads/2021/04/RCTC-SR-60-Construction-Infographic-031121-D2-300x215.png 300w, https://www.rctc.org/wp-content/uploads/2021/04/RCTC-SR-60-Construction-Infographic-031121-D2-1024x734.png 1024w, https://www.rctc.org/wp-content/uploads/2021/04/RCTC-SR-60-Construction-Infographic-031121-D2-768x551.png 768w" sizes="(max-width: 1487px) 100vw, 1487px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_parent col-lg-6 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Crews have paved the new westbound alignment and are preparing to pave the eastbound roadbed. Other ongoing work has included building 123 drainage systems, nearly 2 million cubic yards of dirt, and constructing two large wildlife crossings to provide safe passage for animals beneath Route 60.</p>
<p>The project has had its share of challenges. One westbound lane was fully closed from August 2019 to March 2020 to excavate the steep hillsides. During excavation, sections of slopes were unstable, which required a full closure of westbound Route 60 and a lane closure on eastbound 60 for crews to safely remove giant boulders in October 2019.</p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>More recently, crews have been repairing sections of roadway damaged by winter rains on both the westbound and eastbound lanes. Another challenge has been unsafe drivers who exceed the 55 mile per hour speed limit, despite enhanced traffic enforcement by the San Gorgonio Pass CHP.</p>
<p>Despite the challenges, the project is on schedule to open in summer 2022 to offer a new safer route for travel.</p>
<p>Funding for the $113 construction effort is provided by a combination of federal, state, and local sources, including Measure A, the half-cent sales tax for transportation improvements in Riverside County.</p>
<p>To stay connected to construction news and to see great drone footage, follow @60Truck Lanes on Facebook, Twitter, and Instagram or visit <a href="https://www.rctc.org/60trucklanes">rctc.org/60trucklanes</a>. Please direct questions to <a href="mailto:60trucklanes@rctc.org">60trucklanes@rctc.org</a> or 866-413-6060.</p>
</div></div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Puts Brakes on Study of New Express Lanes</title>
		<link>https://www.rctc.org/rctc-breaks-on-study/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 27 Sep 2019 20:15:24 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[State Route 60]]></category>
		<category><![CDATA[Study]]></category>
		<category><![CDATA[215]]></category>
		<category><![CDATA[60]]></category>
		<category><![CDATA[60/215]]></category>
		<category><![CDATA[Carpool]]></category>
		<category><![CDATA[HOT Lanes]]></category>
		<category><![CDATA[hov]]></category>
		<category><![CDATA[HOV Lanes]]></category>
		<category><![CDATA[RCTC]]></category>
		<category><![CDATA[Riverside County Transportation Commission]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=72096</guid>

					<description><![CDATA[The public will have opportunities to comment on project studies, alternatives]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>The Point: Study to be postponed for about two years   </strong></p>
<p>A study to weigh the possibility of new express lanes is on hold, following a vote by RCTC Commissioners on September 11.</p>
<p>Earlier this year, RCTC completed a feasibility study for new express lanes on State Route 91 in Riverside, State Route 60 between Jurupa Valley and Moreno Valley, and State Route 60/Interstate 215 between Riverside and Moreno Valley. The study looked at converting current carpool lanes to express lanes and, in some cases, also adding a new lane.  The Commission then voted to pursue more in-depth studies of the carpool lanes in these three areas, including analysis of multiple options on these routes.</p>
<p>Simultaneously, Caltrans is conducting studies of carpool lanes in Riverside County and San Bernardino County.</p>
<p>The Riverside City Council adopted a resolution August 20 opposing conversion of the carpool lane on State Route 91 into an express lane.  The Riverside County Board of Supervisors adopted a resolution September 10 to oppose converting carpool lanes to express lanes that do not allow two-person carpools to ride without a fee. After several RCTC Commissioners raised questions and concerns, the Commission placed the study on hold on Sept. 11.</p>
<p>At the meeting, Riverside Mayor and RCTC Commissioner Rusty Bailey noted the need to gather information to make an informed decision about expanding express lanes, but questioned the timing of conducting the study.</p>
<p>“Given the concerns raised by the Board of Supervisors and Riverside City Council and given that Caltrans has plans to do similar mobility analysis, I don’t believe this is the best use of our limited resources at this time,” he said.</p>
<p>Through a vote of 25-5, the Commission voted to place the study on hold until Caltrans concludes its analysis or until staff recommends that the Commission discuss the item further. The Caltrans studies are anticipated to take about two years.</p>
<p>In the meantime, RCTC is continuing construction of the 15 Express Lanes Project between State Route 60 and Cajalco Road, with the new lanes planned to open during the second half of 2020. RCTC also is conducting engineering and environmental studies of the 15 Express Lanes Southern Extension between Cajalco Road and State Route 74. In 2020, construction will begin on the 15/91 Express Lanes Connector, which will provide a direct connection to the 91 Express Lanes from southbound Interstate 15.</p>
</div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div>
</div>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
