<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Express Lanes Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/category/express-lanes/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Mon, 19 Oct 2026 14:56:43 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>Express Lanes Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Commission’s Express Lanes Debt Rating Upgraded to A+</title>
		<link>https://www.rctc.org/commission-91-express-lanes-debt-rating-upgrade/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 19 Oct 2026 14:55:57 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Finance]]></category>
		<category><![CDATA[91 Express Lanes]]></category>
		<category><![CDATA[finance]]></category>
		<category><![CDATA[Financing]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=116824</guid>

					<description><![CDATA[<p>The Point: Rating upgrade recognizes RCTC’s responsible management of the 91 Express Lanes</p>
<p>The post <a href="https://www.rctc.org/commission-91-express-lanes-debt-rating-upgrade/">Commission’s Express Lanes Debt Rating Upgraded to A+</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Rating upgrade recognizes RCTC’s responsible management of the 91 Express Lanes<br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC has received a credit rating upgrade for bonds tied to the 91 Express Lanes, a reflection of the Commission’s disciplined financial management of the SR-91 toll revenue program, strong operational performance, and reliable express lane operations. Fitch upgraded RCTC’s $613 million senior lien SR-91 toll revenue bonds from A to A+ and its $75.7 million subordinate lien SR-91 toll revenue bonds from A- to A. Fitch also assigned a Stable Outlook to both ratings.</p>
<p>The upgrades strengthen RCTC’s position in the credit markets and recognize the continued financial resilience of the 91 Express Lanes, including effective toll operations, revenue performance, and ongoing investment in technology to support reliable service. The rating upgrades may also help reduce future borrowing costs, strengthening the Commission’s ability to deliver transportation improvements while providing long-term value to Riverside County taxpayers.</p>
<p>RCTC financed and built the eight-mile Riverside County extension of the 91 Express Lanes. Jointly operated by RCTC and the Orange County Transportation Authority as part of the larger 91 Express Lanes network, the extension has provided motorists with a reliable travel option since the lanes first opened in 2017.</p>
<p>Revenue from the 91 Express Lanes funds operations and maintenance and repays bonds issued to build the infrastructure. Toll revenue also supports future transportation improvements within the 91 corridor, including non-toll projects. Recent corridor improvements include the <a href="https://www.rctc.org/projects/state-route-91-corridor-operations-project/">91 Corridor Operations Project</a> and <a href="https://www.rctc.org/projects/i15-91-express-lanes-connector/">15/91 Express Lanes Connector</a>, which have enhanced travel in both the Express Lanes and general-purpose lanes.</p>
<p>The future <a href="https://www.rctc.org/projects/91-eastbound-corridor-operations-project/">91 Eastbound Corridor Operations Project</a> is expected to include toll revenue funding, subject to applicable approvals and funding requirements.</p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/commission-91-express-lanes-debt-rating-upgrade/">Commission’s Express Lanes Debt Rating Upgraded to A+</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Commission Awards Contract to Extend I-15 Express Lanes from Corona to Lake Elsinore</title>
		<link>https://www.rctc.org/commission-awards-contract-extend-15-express-lanes-south/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 01 Jun 2026 22:19:27 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Lake Elsinore]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=111522</guid>

					<description><![CDATA[<p>The Point: Extension of the 15 Express Lanes to southwest Riverside County will be one of the first to use the progressive design method on the state highway system</p>
<p>The post <a href="https://www.rctc.org/commission-awards-contract-extend-15-express-lanes-south/">Commission Awards Contract to Extend I-15 Express Lanes from Corona to Lake Elsinore</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Extension of the 15 Express Lanes to southwest Riverside County will be one of the first to use the progressive design method on the state highway system<br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC took a significant step to advance the <a href="https://www.rctc.org/projects/i15-express-southern-extension/">I-15 Express Lanes Project Southern Extension</a> with the approval of a Progressive Design-Build Phase 1 contract. The project is a major investment aimed at reducing congestion and improving travel for Riverside County residents along one of the region’s busiest transportation corridors.</p>
<p>“The I-15 corridor is a heavily traveled route in Riverside County and a critical connection for residents, commuters, and goods movement throughout our region,” said Raymond Gregory, Mayor of Cathedral City and Chair of RCTC. “This project is an important step toward helping people spend less time stuck in traffic.”</p>
<p>As a major first for a highway infrastructure project in California, RCTC is utilizing a Progressive Design-Build method to accelerate the delivery of the project. Phase 1 includes the preliminary design along with validating the project scope and negotiating the cost for Phase 2. Phase 2 will include final design and construction.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 42.8%;"></div><img fetchpriority="high" decoding="async" class="wp-image-101975" src="https://www.rctc.org/wp-content/uploads/2019/01/100924_15_ELPSE_Project_Website_Banner-uai-2100x899.jpg" width="2100" height="899" alt="100924 15 ELPSE Project Website Banner"></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The project will extend the existing I-15 Express Lanes approximately 15.8 miles south by adding two Express Lanes in each direction from Cajalco Road in Corona to State Route 74 (Central Avenue) in Lake Elsinore. The project includes widening up to 15 bridges, constructing auxiliary lanes, installing electronic toll collection systems, and implementing drainage and noise reduction features along existing right-of-way.</p>
<p>Based on available funding, the project could begin construction in late 2027 and open to traffic by 2030. Once completed, the project is expected to improve traffic flow and help Riverside County residents and commuters traveling through the I-15 corridor spend less time in traffic.</p>
<p>For more information about the I-15 Express Lanes Project Southern Extension and to sign up for updates, please visit: <a href="https://www.rctc.org/projects/i15-express-southern-extension/">rctc.org/15projectsouth</a></p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/commission-awards-contract-extend-15-express-lanes-south/">Commission Awards Contract to Extend I-15 Express Lanes from Corona to Lake Elsinore</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Improves Segments of the 91 and 15 Express Lanes Roadway for a Smoother Drive</title>
		<link>https://www.rctc.org/91-15-express-lanes-improvements/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 18 Dec 2025 16:10:59 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Finance]]></category>
		<category><![CDATA[91 Express Lanes]]></category>
		<category><![CDATA[finance]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=109915</guid>

					<description><![CDATA[<p>The Point: Sections of the 91 and 15 Express Lanes were replaced to enhance safety and travel</p>
<p>The post <a href="https://www.rctc.org/91-15-express-lanes-improvements/">RCTC Improves Segments of the 91 and 15 Express Lanes Roadway for a Smoother Drive</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Sections of the 91 and 15 Express Lanes were replaced to enhance safety and travel<br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>If you have recently traveled on the 91 and 15 Express Lanes, you may have noticed improvements to the roadway thanks to RCTC’s recently completed slab pavement replacement project. As part of the toll program’s ongoing maintenance efforts, several deteriorating slabs on the 91 and 15 Express Lanes were replaced to maintain safe and smooth roads.</p>
<p>Throughout November and December, a total of 61 slabs were replaced. These slabs displayed some cracking requiring replacement to prevent rapid deterioration and reduce roadway hazards. Construction crews cut out these existing slabs in segments, performing this work at night to ensure the safety of the crews and to reduce travel time disruptions. After the replacement slabs were in place, crews performed grinding and striping to ensure a smooth roadway.</p>
</div><div class="vc_row vc_custom_1766012504083 row-internal row-container" style="margin-top: -5px ;padding-top: 3px ;"><div class="row row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 75%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-109919" data-options="width:1500,height:1125,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-300x225.jpg'"><img decoding="async" class="wp-image-109919" src="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01.jpg" width="1500" height="1125" alt="1225 The Point Express Lanes Slab Replacement 01" srcset="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01.jpg 1500w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-300x225.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-1024x768.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-768x576.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-350x263.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-24x18.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-36x27.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-48x36.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-500x375.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-800x600.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_01-1280x960.jpg 1280w" sizes="(max-width: 1500px) 100vw, 1500px" /></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 75%;"></div><a href="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-109920" data-options="width:1500,height:1125,thumbnail: 'https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-300x225.jpg'"><img decoding="async" class="wp-image-109920" src="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02.jpg" width="1500" height="1125" alt="1225 The Point Express Lanes Slab Replacement 02" srcset="https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02.jpg 1500w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-300x225.jpg 300w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-1024x768.jpg 1024w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-768x576.jpg 768w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-350x263.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-24x18.jpg 24w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-36x27.jpg 36w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-48x36.jpg 48w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-500x375.jpg 500w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-800x600.jpg 800w, https://www.rctc.org/wp-content/uploads/2025/12/1225_The_Point_Express_Lanes_Slab_Replacement_02-1280x960.jpg 1280w" sizes="(max-width: 1500px) 100vw, 1500px" /></a></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>These slab replacements provide a noticeably enhanced driving experience thanks to smoother pavement and profile grinding. This work also helps extend the life of the pavement, reducing the frequency of future repairs and lowering long-term maintenance costs.</p>
<p>Thanks to these improvements, motorists driving on the 91 and 15 Express Lanes can also expect more consistent and reliable travel times.</p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/91-15-express-lanes-improvements/">RCTC Improves Segments of the 91 and 15 Express Lanes Roadway for a Smoother Drive</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Strong Performance Prompts Upgrades to RCTC’s Express Lanes Debt Outlook</title>
		<link>https://www.rctc.org/fitch-upgrades-commission-debt-outlook/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 11 Dec 2025 23:43:29 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Finance]]></category>
		<category><![CDATA[91 Express Lanes]]></category>
		<category><![CDATA[finance]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=109909</guid>

					<description><![CDATA[<p>The Point: Upgrade to Commission’s debt outlook a result of the 91 Express Lanes exceeding performance metrics</p>
<p>The post <a href="https://www.rctc.org/fitch-upgrades-commission-debt-outlook/">Strong Performance Prompts Upgrades to RCTC’s Express Lanes Debt Outlook</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Upgrade to Commission’s debt outlook a result of the 91 Express Lanes exceeding performance metrics<br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Fitch Ratings, a prominent New York-based credit ratings agency, has <a href="https://www.fitchratings.com/research/infrastructure-project-finance/fitch-revises-rctc-sr-91-outlook-to-positive-affirms-ratings-12-11-2025" target="_blank" rel="noopener">upgraded the debt outlook</a> for the Riverside County Transportation Commission (RCTC) from Stable to Positive. This upgrade demonstrates RCTC&#8217;s impressive financial performance and highlights the potential for a higher debt rating in the near future.</p>
<p>This upgrade is a response to the robust traffic and revenue levels on the 91 Express Lanes, indicating a strong demand for this vital transportation corridor. During the November announcement, Fitch also reaffirmed its existing ratings for RCTC’s 91 toll revenue bonds.</p>
<p>This upgrade signals confidence in RCTC’s fiscal health and management, suggesting that continued effective operational strategies could lead to further improvements in RCTC&#8217;s credit rating. A positive outlook benefits our community and fosters ongoing investments in infrastructure that enhance mobility and connectivity for Riverside County residents.</p>
</div></div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/fitch-upgrades-commission-debt-outlook/">Strong Performance Prompts Upgrades to RCTC’s Express Lanes Debt Outlook</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Reminder: Toll Lane Phishing Scams on the Rise</title>
		<link>https://www.rctc.org/reminder-toll-lane-phishing-scams-on-the-rise/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 03 Jan 2025 03:58:22 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Safety]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[toll lanes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=104706</guid>

					<description><![CDATA[<p>The Point: Toll lane users are advised to be wary of toll text scams</p>
<p>The post <a href="https://www.rctc.org/reminder-toll-lane-phishing-scams-on-the-rise/">Reminder: Toll Lane Phishing Scams on the Rise</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: </strong><strong>Toll lane users are advised to be wary of toll text scams</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Toll agencies across the state have noticed an increase in scam-based text messages. The text messages claim a toll lane customer has an outstanding balance, followed by a link to pay the balance due.  The link provided in the text is to a fraudulent webpage that features toll agency logos and a payment button. It is important for toll lane users to understand that toll agencies do not request payment through the use of text messages and that the link in the text should not be clicked.</p>
<p>The scam-based texts are designed to deceive drivers into entering banking or credit card information into a website, fraudulently claiming to represent tolling agencies and requesting payment of unpaid tolls.</p>
<p>Unfortunately, these scams are not new. FasTrak® toll lane customers are advised to stay alert. Thousands of complaints have been filed for these types of scams since spring 2024 and law enforcement and other government agencies have put out multiple alerts to warn the public about these scams.</p>
<p>RCTC wants you to be vigilant and know the signs to spot fake texts. This vigilance will empower you to avoid falling victim to these scams.</p>
</div><div class="vc_row row-internal row-container"><div class="row col-no-gutter row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-middle pos-center align_center column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media projectRendering text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 81%;"><div class="tmb tmb-light  tmb-shadowed tmb-shadowed-std tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-104708" src="https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam.jpg" width="473" height="1024" alt="0125 Toll Scam" srcset="https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam.jpg 473w, https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam-139x300.jpg 139w, https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam-350x758.jpg 350w, https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam-11x24.jpg 11w, https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam-17x36.jpg 17w, https://www.rctc.org/wp-content/uploads/2025/01/0125_Toll-Scam-22x48.jpg 22w" sizes="(max-width: 473px) 100vw, 473px" /></div>
					</div>
				</div></div></div></div></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><strong>Slow down, and don’t click on links that look suspicious.</strong> Many of the webpages appear authentic, so it’s important to check the information on the website closely before providing any personal information.</p>
<p><strong>Check with the tolling agency. </strong>The 91 Express Lanes and Riverside Express do not send text messages requesting payment.  You can check the status of your account at 91expresslanes.com or riversideexpress.com or receive more information regarding this scam on our home pages. Report unwanted text messages using the “report junk” feature on your phone.</p>
<p><strong>File a complaint with the FBI Internet Crime Complaint Center</strong> (IC3) at <a href="http://www.ic3.gov">www.ic3.gov</a>. Be sure to include the phone number from where the text originated, and the website listed within the text message.</p>
<p><strong>If you receive a suspicious text message, delete it immediately.</strong> Do not engage with the sender or click on any links.</p>
</div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Please share this information so that others are aware of these scam attempts. If you are ever in doubt, Riverside County toll customers can call <a href="https://www.riversideexpress.com/" target="_blank" rel="noopener">Riverside Express</a> customer service center at (855) 951-1500 or the <a href="https://www.91expresslanes.com/" target="_blank" rel="noopener">91 Express Lanes</a> customer service center at (800) 600-9191.</p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/reminder-toll-lane-phishing-scams-on-the-rise/">Reminder: Toll Lane Phishing Scams on the Rise</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Submit Your Comments on the Proposed I-15 Express Lanes Project South Extension by November 26</title>
		<link>https://www.rctc.org/provide-comments-draft-environmental-document-15-express-southern-project/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 06 Nov 2024 17:04:19 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Environment]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Study]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[commute]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Lake Elsinore]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Temescal Valley]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=102426</guid>

					<description><![CDATA[<p>The Point: There are many ways to submit your comments</p>
<p>The post <a href="https://www.rctc.org/provide-comments-draft-environmental-document-15-express-southern-project/">Submit Your Comments on the Proposed I-15 Express Lanes Project South Extension by November 26</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: There are many ways to submit your comments</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Did you miss one of the three <a href="https://www.rctc.org/projects/i15-express-southern-extension/">I-15 Express Lanes Project Southern Extension</a> public meetings in October? No need to worry. Riverside County residents still have time to <a href="https://www.rctc.org/wp-content/uploads/2024/10/15ELPSE_Draft-Environmental-Impact-Report_Environmental-Assessment_October-2024.pdf" target="_blank" rel="noopener">view</a> and <a href="https://www.rctc.org/projects/i15-express-southern-extension/">comment</a> on the Draft Environmental Impact Report and Environmental Assessment (DEIR/EA). The public comment period runs through November 26, 2024. The release of the Draft EIR/EA is a significant milestone for the project, moving the region closer to relieving traffic on this part of the heavily traveled I-15.</p>
</div><div class="vc_row row-internal row-container"><div class="row col-no-gutter row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC hosted three open house public meetings in October in Corona, Temescal Valley, and Lake Elsinore to allow residents to speak with the project team, ask questions, and provide comments on the Draft EIR/EA. At the public meeting, residents were also met with several boards and videos explaining the project, the benefits, and the technical aspects included in the draft environmental document. If you did not attend the meeting, all the presented materials are available on the project <a href="https://www.rctc.org/projects/i15-express-southern-extension/">webpage</a>. RCTC will respond to comments following the closure of the public comment period and prepare a Final Environmental Document for Commission consideration.</p>
</div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 82%;"><a class="single-media-link" href="https://www.rctc.org/wp-content/uploads/2024/10/I-15-ELPSE-Public-Meeting-Boards-FINAL.pdf" target="_blank"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-102126" src="https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb.jpg" width="984" height="807" alt="1024 ELPSE Board Thumb" srcset="https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb.jpg 984w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-300x246.jpg 300w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-768x630.jpg 768w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-500x410.jpg 500w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-800x656.jpg 800w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-350x287.jpg 350w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-24x20.jpg 24w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-36x30.jpg 36w, https://www.rctc.org/wp-content/uploads/2019/01/1024_ELPSE_Board_Thumb-48x39.jpg 48w" sizes="(max-width: 984px) 100vw, 984px" /></div>
					</div>
				</div></div></div></a></div></div><div class="uncode_text_column boardCaption vc_custom_1730828769242 text-small"  style="margin-top: -10px ;padding-bottom: 12px ;"></p>
<p style="text-align: center;">Click image above to download the project boards</p>
<p>
</div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The proposed project would extend the I-15 Express Lanes an additional 15.8 miles from El Cerrito Road in Corona through Temescal Valley to State Route 74 (Central Avenue) in Lake Elsinore. The new Express Lanes would not replace any existing lanes. The project includes adding two tolled lanes in each direction within the I-15 median by widening the pavement and bridges. The project would also add southbound I-15 auxiliary lanes between the Nichols Road on-ramp and the SR-74 (Central Avenue) off-ramp and between the SR-74 (Central Avenue) on-ramp and Main Street off-ramp. Construction on the I-15 Express Lanes Project Southern Extension may begin in 2027, depending on funding availability.</p>
<p>To review and comment on the Draft EIR/EA or to view material from the open house public meetings, please visit: <a href="https://www.rctc.org/projects/i15-express-southern-extension/">rctc.org/15ProjectSouth</a></p>
</div><div class="empty-space empty-double desktop-hidden tablet-hidden" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/provide-comments-draft-environmental-document-15-express-southern-project/">Submit Your Comments on the Proposed I-15 Express Lanes Project South Extension by November 26</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>I-15 Express Lanes Extension Reaches Significant Milestone with Release of Draft Environmental Document</title>
		<link>https://www.rctc.org/15-express-lanes-extension-release-of-draft-environmental-document/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 16 Oct 2024 20:21:26 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Environment]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Study]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[commute]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Lake Elsinore]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Temescal Valley]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=101990</guid>

					<description><![CDATA[<p>The Point: Project’s draft environmental document is available for public review and comment</p>
<p>The post <a href="https://www.rctc.org/15-express-lanes-extension-release-of-draft-environmental-document/">I-15 Express Lanes Extension Reaches Significant Milestone with Release of Draft Environmental Document</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Project’s draft environmental document is available for public review and comment</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-18"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>In what marks a significant milestone for the <a href="https://www.rctc.org/projects/i15-express-southern-extension/">Interstate 15 Express Lanes Project Southern Extension</a>, RCTC and Caltrans have released the Draft Environmental Impact Report and Environmental Assessment (EIR/EA) for the public to review and submit comments. The release of the Draft EIR/EA moves the region closer to relieving traffic on this part of the highway subject to project approval upon completion of the environmental process. Due to rapid population growth along the corridor and increased freight movement, traffic congestion continues to make the commute to and from southwest Riverside County difficult. The project aims to provide alternative travel choices and traffic relief to this region.</p>
<p>The 45-day public comment period runs from October 9 to November 26, 2024. RCTC will also be hosting three open house public meetings to provide the public information and to gather feedback from residents on the project.</p>
<p>The proposed project would extend the I-15 Express Lanes an additional 15.8 miles from El Cerrito Road in Corona through Temescal Valley to State Route 74 (Central Avenue) in Lake Elsinore. The project would add two tolled lanes in each direction within the I-15 median by widening the pavement and bridges and would not replace any existing lanes. The project would also add southbound I-15 auxiliary lanes between both the Nichols Road on-ramp and the SR-74 (Central Avenue) off-ramp, and between the SR-74 (Central Avenue) on-ramp and Main Street off-ramp.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 46.9%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-95655" data-options="width:1529,height:717,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-300x141.jpg'"><img decoding="async" class="wp-image-95655" src="https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map.jpg" width="1529" height="717" alt="0124 15 ELPSE Map" srcset="https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map.jpg 1529w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-300x141.jpg 300w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-1024x480.jpg 1024w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-768x360.jpg 768w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-500x234.jpg 500w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-800x375.jpg 800w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-1280x600.jpg 1280w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-350x164.jpg 350w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-24x11.jpg 24w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-36x17.jpg 36w, https://www.rctc.org/wp-content/uploads/2024/01/0124_15_ELPSE_Map-48x23.jpg 48w" sizes="(max-width: 1529px) 100vw, 1529px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Once the entire 15.8-mile length is constructed, the project would provide a reliable tolled travel time option to move motorists through this congested corridor and maintain compatibility with the regional Express Lanes network. The project would also increase opportunities for mass transit, such as RTA Express Buses and carpooling.</p>
<p>Residents are encouraged to review the draft environmental document at <a href="https://www.rctc.org/15ProjectSouth">rctc.org/15ProjectSouth</a> or at libraries in Corona and Lake Elsinore. Comments may be submitted through the following methods:</p>
<ul>
<li>Email: <a href="mailto:15ProjectSouth@rctc.org">15ProjectSouth@rctc.org</a></li>
<li>By U.S. Mail at:<br />
Jeff Dietzler, Capital Projects Manager (Tolling)<br />
Riverside County Transportation Commission<br />
4080 Lemon Street, Third Floor<br />
P.O. Box 12008<br />
Riverside, CA 92501</li>
<li>Three Open House Public Meetings scheduled from 6 p.m. to 8 p.m. on the dates below; the content will be the same at the three meetings. Spanish interpretation will be provided.</li>
</ul>
<table data-tablestyle="MsoTableGrid" data-tablelook="1184" aria-rowcount="1">
<tbody>
<tr aria-rowindex="1">
<td><strong>Tuesday, Oct. 22, 2024</strong><br />
<strong>Temescal Valley</strong><br />
The Retreat<br />
8007 Soft Winds Drive<br />
Corona, CA 92883</td>
<td><strong>Wednesday, Oct. 23, 2024</strong><br />
<strong>Lake Elsinore</strong><br />
Lake Elsinore Cultural Center<br />
183 N Main Street<br />
Lake Elsinore, CA 92530</td>
<td><strong>Tuesday, Oct. 29, 2024</strong><br />
<strong>Corona</strong><br />
Eagle Glen Golf Club<br />
1800 Eagle Glen Parkway<br />
Corona, CA 92883</td>
</tr>
</tbody>
</table>
<p>For more information on the 15 Express Project Southern Extension and to sign up for project updates, visit: <a href="https://www.rctc.org/projects/i15-express-southern-extension/">rctc.org/15ProjectSouth</a></p>
</div><div class="empty-space empty-double desktop-hidden tablet-hidden" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-18" data-row="script-row-unique-18" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-18"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-19"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-19" data-row="script-row-unique-19" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-19"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/15-express-lanes-extension-release-of-draft-environmental-document/">I-15 Express Lanes Extension Reaches Significant Milestone with Release of Draft Environmental Document</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Attention Riverside County Toll Lane Users</title>
		<link>https://www.rctc.org/attention-riverside-county-toll-lane-users/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 17 Jul 2024 15:49:44 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Safety]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[toll lanes]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100326</guid>

					<description><![CDATA[<p>The Point: A nationwide consumer alert advises the public to be wary of toll texts</p>
<p>The post <a href="https://www.rctc.org/attention-riverside-county-toll-lane-users/">Attention Riverside County Toll Lane Users</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-20"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: A nationwide consumer alert advises the public to be wary of toll texts</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-20" data-row="script-row-unique-20" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-20"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-21"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Toll customers across the country have become the next targets of a new type of text message scam. Since spring, the<a href="https://www.ic3.gov/Media/Y2024/PSA240412" target="_blank" rel="noopener"> Federal Bureau of Investigation</a>, attorneys general, and countless other government agencies have sent out alerts to the public about a new type of scam related to toll charges.</p>
<p>Using the FasTrak® toll system in California is a straightforward process. Each time you use Express Lanes, you pay a toll.</p>
<p>To prey on FasTrak customers, scammers are pretending to be one of many California FasTrak agencies (e.g. 91 Express Lanes, Bay Area Tolling Agency) informing the individual of unpaid toll charges through a text message. The message advises the individual to click on a link embedded in the text message to pay the outstanding balance.</p>
<p>When the individual clicks on the link, they are redirected to a fraudulent website featuring the FasTrak logo and payment button. At that point, users are asked to enter personal information such as a driver’s license number, address, name, and date of birth. After entering their personal information, users are then prompted to provide payment information such as a credit card number or bank account. The purpose of the scam is to steal your money and your identity.</p>
</div><div class="vc_row row-internal row-container"><div class="row col-no-gutter row-child"><div class="wpb_row row-inner"><div class="wpb_column pos-middle pos-center align_center column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode-single-media projectRendering text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 66%;"><div class="tmb tmb-light  tmb-shadowed tmb-shadowed-std tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-100373" src="https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01.png" width="578" height="955" alt="Toll Scam 01 01" srcset="https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01.png 578w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-182x300.png 182w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-500x826.png 500w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-350x578.png 350w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-15x24.png 15w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-22x36.png 22w, https://www.rctc.org/wp-content/uploads/2024/07/Toll-Scam-01-01-29x48.png 29w" sizes="(max-width: 578px) 100vw, 578px" /></div>
					</div>
				</div></div></div></div><figcaption>The text message scam will include a fraudulent link </figcaption></div></div></div></div></div></div><div class="wpb_column pos-top pos-center align_left column_child col-lg-6 single-internal-gutter"><div class="uncol style-light" ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>RCTC wants to inform you, our customers, to be vigilant and know the signs to spot fake texts. This vigilance will empower you to avoid falling victim to these scams.</p>
<p><strong>Slow down, and don’t click on links that look suspicious.</strong> Many of the webpages appear authentic, so it’s important to check the information on the website closely before providing any personal information.</p>
<p><strong>Check with the tolling agency.</strong> If you are unsure if a text message is from a reputable source, you can always call the customer service center to check the validity of the text message or email.</p>
<p><strong>Report unwanted text messages using the “report junk” feature on your phone.  </strong></p>
<p><strong>If you receive a suspicious text message, delete it immediately.</strong> Do not engage with the sender or click on any links.</p>
</div></div></div></div></div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Please share this information so that others are aware of these scam attempts. If you are ever in doubt, Riverside County toll customers can call <a href="https://www.riversideexpress.com/" target="_blank" rel="noopener">Riverside Express</a> customer service center at (855) 951-1500 or the <a href="https://www.91expresslanes.com/" target="_blank" rel="noopener">91 Express Lanes</a> customer service center at (800) 600-9191.</p>
</div></div></div></div></div></div><script id="script-row-unique-21" data-row="script-row-unique-21" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-21"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-22"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-22" data-row="script-row-unique-22" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-22"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/attention-riverside-county-toll-lane-users/">Attention Riverside County Toll Lane Users</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>$12.5 Million in RCTC’s Congressional Requests Advance</title>
		<link>https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 10 Jun 2024 20:30:15 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Commission]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Federal Funding]]></category>
		<category><![CDATA[Funding]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Train]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[91 Corridor]]></category>
		<category><![CDATA[91/PVL]]></category>
		<category><![CDATA[metrolink]]></category>
		<category><![CDATA[Mid County Parkway]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=99977</guid>

					<description><![CDATA[<p>The Point: Federal funding requests would benefit numerous passenger rail and highway projects in Riverside County</p>
<p>The post <a href="https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/">$12.5 Million in RCTC’s Congressional Requests Advance</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-23"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Federal funding requests would benefit numerous passenger rail and highway projects in Riverside County</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-23" data-row="script-row-unique-23" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-23"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-24"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">The Riverside County Transportation Commission (RCTC) continues to make headways in the pursuit of much-needed federal funding for transportation improvements in Riverside County. Four Community Project Funding (CPF) projects totaling $12.5 million have received support from local members of Congress in the Fiscal Year 2025 Appropriations bill. These requests follow RCTC’s recent accomplishment of securing $9.5 million in federal funding.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Representative Young Kim has championed RCTC’s request for $4 million for the <a href="https://www.rctc.org/projects/91-eastbound-corridor-operations-project/">State Route 91 Eastbound Corridor Operations Project</a> (91 ECOP). The 91 ECOP will alleviate traffic congestion along eastbound </span><span data-contrast="auto">SR-</span><span data-contrast="auto">91 between the 241 Toll Road connector and SR-71 in Corona, especially during peak afternoon commute</span><span data-contrast="auto">s</span><span data-contrast="auto"> between Orange County and Riverside County</span><span data-contrast="auto">.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">Senators Alex Padilla and Laphonza Butler have been instrumental in advancing RCTC’s request of $3 million for the <a href="https://www.rctc.org/projects/mid-county-parkway-ramona/">Mid County Parkway: Ramona Expressway Project</a>. This project, spanning an 8.6-mile stretch of road in the rapidly growing communities of Perris, San Jacinto, Nuevo, and Lakeview, is a significant step towards enhancing safety and furthering the vision of a multimodal corridor. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-667233" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-loop="true" data-dots="true" data-nav="true" data-navmobile="true" data-navskin="light" data-navspeed="400" data-autoplay="true" data-timeout="3000" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-90841  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="0523 Point 91ECOP Banner"  data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-90841" src="https://www.rctc.org/wp-content/uploads/2023/05/0523_Point_91ECOP_Banner-uai-2000x1125.jpg" width="2000" height="1125" alt="0523 Point 91ECOP Banner" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>State Route 91 Eastbound Corridor Operations Project</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-89043  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="0123 PVLDowntown 2571"  data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-89043" src="https://www.rctc.org/wp-content/uploads/2023/01/0123_PVLDowntown_2571-uai-2100x1181.jpg" width="2100" height="1181" alt="0123 PVLDowntown 2571" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>91/Perris Valley Line</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-67680  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="RCTC Mid-County Parkway Photo"  data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-67680" src="https://www.rctc.org/wp-content/uploads/2018/04/MCP-Photo-uai-1920x1080.jpg" width="1920" height="1080" alt="RCTC Mid-County Parkway Photo" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Mid County Parkway: Ramona Expressway</span></p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-bordered tmb-id-88127  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" class="inactive-link pushed" aria-label="1122 I 15 Express Lanes Point Cover"  data-lb-index="3"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.01;"></div></div><img decoding="async" class="wp-image-88127" src="https://www.rctc.org/wp-content/uploads/2022/11/1122_I-15_Express_Lanes_Point_Cover-uai-2100x1181.jpg" width="2100" height="1181" alt="1122 I 15 Express Lanes Point Cover" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-meta"><span>Interstate 15 Express Lanes</span></p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p><span data-contrast="auto">Representative Ken Calvert has requested $3 million for the <a href="https://www.rctc.org/projects/i15-express-southern-extension/">Interstate 15 Express Lanes Project Southern Extension</a>. The project will extend the existing I-15 Express Lanes south by 14.5 miles between Corona and Lake Elsinore and will significantly improve traffic operations and enhance safety. For residents in the surrounding communities, I-15 is the lifeline connecting them to jobs, education, and regional destinations. Once completed, the project will increase travel choices</span><span data-contrast="auto">, allow for commuter buses,</span> <span data-contrast="auto">and improve travel time reliability</span><span data-contrast="auto">.</span></p>
<p><span data-contrast="auto">Representative Mark Takano has advanced RCTC’s $2.5 million request for the <a href="https://www.rctc.org/projects/metrolink-double-track-project-moreno-valley-perris/">Metrolink Double Track Project: Moreno Valley to Perris</a>. The project will upgrade 6.5 miles of existing freight track on the 91/Perris Valley Line between the Moreno Valley/March Field Station and just north of the Perris-Downtown Station. The historic tracks are currently rated for much slower speeds than passenger trains require, and the upgrade would improve the reliability of Metrolink service, increase access to jobs and education, and reduce air pollution in this rapidly expanding area of Riverside County.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
<p><span data-contrast="auto">RCTC appreciates the leadership and efforts of Senators Padilla and Butler, as well as Representatives Calvert, Kim, and Takano, to bring federal transportation funding to Riverside County to enhance mobility and quality of life for its residents.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></p>
</div></div></div></div></div></div><script id="script-row-unique-24" data-row="script-row-unique-24" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-24"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-25"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-25" data-row="script-row-unique-25" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-25"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/12-million-in-rctc-congressional-requests-advance/">$12.5 Million in RCTC’s Congressional Requests Advance</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>2023: Making Strides</title>
		<link>https://www.rctc.org/2023-making-strides/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 28 Feb 2024 17:31:37 +0000</pubDate>
				<category><![CDATA[Commission]]></category>
		<category><![CDATA[Community]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Environment]]></category>
		<category><![CDATA[Express Lanes]]></category>
		<category><![CDATA[Federal Funding]]></category>
		<category><![CDATA[FSP]]></category>
		<category><![CDATA[Ground Breaking]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[IE Commuter]]></category>
		<category><![CDATA[Interchanges]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[MSHCP]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[RCA]]></category>
		<category><![CDATA[Train]]></category>
		<category><![CDATA[Transit]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[15 Express Lanes]]></category>
		<category><![CDATA[Coachella Valley]]></category>
		<category><![CDATA[commute]]></category>
		<category><![CDATA[Draft Traffic Relief Plan]]></category>
		<category><![CDATA[metrolink]]></category>
		<category><![CDATA[projects]]></category>
		<category><![CDATA[Traffic Relief Plan]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=96508</guid>

					<description><![CDATA[<p>The Point: RCTC’s Annual Report spotlights the Commission’s various success throughout the past year</p>
<p>The post <a href="https://www.rctc.org/2023-making-strides/">2023: Making Strides</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div data-parent="true" class="vc_row row-container" id="row-unique-26"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: RCTC’s Annual Report spotlights the Commission’s various success throughout the past year</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-26" data-row="script-row-unique-26" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-26"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-27"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">Following up a banner year in 2022, a year in which RCTC delivered a staggering five capital projects, the agency carried that momentum into 2023 – advancing projects and investing in transportation improvements for communities across Riverside County. This progress was highlighted in RCTC’s <a href="https://www.rctc.org/wp-content/uploads/2024/02/2023_RCTC_Annual_Report.pdf" target="_blank" rel="noopener">2023 Annual Report</a>.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="auto">Investments in Riverside County’s highways and roads continued in 2023. The agency started and ended the year strong – breaking ground on the transformative </span><a href="https://www.rctc.org/projects/71-91-interchange-project/"><span data-contrast="none">71/91 Interchange Project</span></a><span data-contrast="auto"> in January, followed by the highly-anticipated opening of the</span><a href="https://www.rctc.org/projects/i15-91-express-lanes-connector/"><span data-contrast="none"> 15/91 Express Lanes Connector</span></a><span data-contrast="auto"> in October. Together, these projects will improve connectivity, reduce traffic flow, and expand transportation options for the region.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-339029" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-fade="true" data-loop="true" data-dots="true" data-dotsmobile="true" data-nav="true" data-navmobile="false" data-navskin="light" data-navspeed="200" data-autoplay="false" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96530  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Groundbreaking.jpg" class="pushed" aria-label="0224 7191 Groundbreaking"  data-active="1" data-lbox="ilightbox_gallery-339029" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Groundbreaking-300x196.jpg'" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96530" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Groundbreaking-uai-1500x843.jpg" width="1500" height="843" alt="0224 7191 Groundbreaking" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">Since breaking ground in January 2023, the 71/91 Interchange Project has undergone a remarkable transformation and has been a testament to innovation, safety, and collaboration. </p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96531  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Progress.jpg" class="pushed" aria-label="0224 7191 Progress"  data-active="1" data-lbox="ilightbox_gallery-339029" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Progress-300x196.jpg'" data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96531" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_7191_Progress-uai-1500x843.jpg" width="1500" height="843" alt="0224 7191 Progress" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">Crews placed an intricate web of support structures over eastbound and westbound 91 lanes. Standing over 30-feet tall and consisting of more than 200 steel beams, this support structure will allow crews to construct the new overhead connector roadway.</p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96535  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Progress.jpg" class="pushed" aria-label="0224 1591ELC Progress"  data-active="1" data-lbox="ilightbox_gallery-339029" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Progress-300x196.jpg'" data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96535" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Progress-uai-1500x843.jpg" width="1500" height="843" alt="0224 1591ELC Progress" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">Construction of the 15/91 Express Lanes Connector Project took place from April 2021 to November 2023</p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96538  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Completed.jpg" class="pushed" aria-label="0224 1591ELC Completed"  data-active="1" data-lbox="ilightbox_gallery-339029" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Completed-300x196.jpg'" data-lb-index="3"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96538" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_1591ELC_Completed-uai-1500x843.jpg" width="1500" height="843" alt="0224 1591ELC Completed" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">The new connector opened November 2023 and allows for a seamless transition from the eastbound 91 to northbound 15 and southbound 15 to westbound 91 Express Lanes.</p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p>Enhancing public transportation continued to be a point of emphasis for RCTC in 2023. The transformational <a href="https://www.rctc.org/cvr">Coachella Valley Rail Project</a> (CV Rail) was <a href="https://www.rctc.org/the-coachella-valley-rail-project-gets-national-attention/">added to the federal Identification and Development Program and awarded $500,000 by the Federal Railroad Administration.</a> This designation and grant award recognizes the value CV Rail will bring to Riverside County and throughout southern California. Crews on the <a href="https://www.rctc.org/projects/moreno-valley-march-field-station-improvements/">Moreno Valley/March Field Station Improvements Project</a> continued working on adding a second platform and extending the existing platform to accommodate the standard six car Metrolink trains, moving the project closer to completion later this year. Additionally, the <a href="https://www.rctc.org/15-million-awarded-to-rctc-and-metrolink-for-double-track-project-in-perris-valley/">California State Transportation Agency awarded $15.5 million to the Metrolink Double Track Project</a> on the 91/Perris Valley Line to improve reliability and future capacity for service, capping off a strong year of state and federal investment in the county’s rail network.</p>
<p><span data-contrast="auto">RCTC celebrated </span><span data-contrast="auto">a special birthday </span><span data-contrast="auto">– the </span><a href="https://www.rctc.org/freeway-service-patrol-30-years-of-service/"><span data-contrast="none">Freeway Service Patrol&#8217;s (FSP) 30 years of service</span></a><span data-contrast="auto">. FSP drivers assisted over 56,000 motorists during the past year and more than one million motorists total since the program’s inception in 1993. FSP drivers aid stranded motorists by jump-starting batteries, fixing flat tires, conducting other minor roadside repairs, or towing vehicles to CHP-approved locations. </span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-339030" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-fade="true" data-loop="true" data-dots="true" data-dotsmobile="true" data-nav="true" data-navmobile="false" data-navskin="light" data-navspeed="200" data-autoplay="false" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96583  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_Point_Making_Strides_CVR.jpg" class="pushed" aria-label="0224 Point Making Strides CVR"  data-active="1" data-lbox="ilightbox_gallery-339030" data-options="width:1500,height:1000,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_Point_Making_Strides_CVR-300x200.jpg'" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96583" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_Point_Making_Strides_CVR-uai-1500x843.jpg" width="1500" height="843" alt="0224 Point Making Strides CVR" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">By being included in the Corridor ID program, the CV Rail project is now considered vital to developing intercity passenger rail across the Country.</p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96543  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_91_PVL_Double_Track.jpg" class="pushed" aria-label="0224 91 PVL Double Track"  data-active="1" data-lbox="ilightbox_gallery-339030" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_91_PVL_Double_Track-300x196.jpg'" data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96543" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_91_PVL_Double_Track-uai-1500x843.jpg" width="1500" height="843" alt="0224 91 PVL Double Track" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">The Metrolink Double Track Project will add a second track to the Metrolink 91/Perris Valley Line between the Moreno Valley/March Field Station and the Perris-Downtown Station allowing for increased service frequency in the future by Metrolink’s commuter trains.</p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96541  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_FSP.jpg" class="pushed" aria-label="0224 FSP"  data-active="1" data-lbox="ilightbox_gallery-339030" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_FSP-300x196.jpg'" data-lb-index="2"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96541" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_FSP-uai-1500x843.jpg" width="1500" height="843" alt="0224 FSP" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">Over the last 30 years, Riverside County FSP drivers have assisted more than one million motorists. This includes more than 130,000 flat tires changed and over 75,000 accidents cleared.</p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p><span data-contrast="auto">Sharing is caring &#8211; motorists were encouraged to share rides and reduce greenhouse gas emissions through the popular </span><a href="https://www.iecommuter.org/rp2/home/home" target="_blank" rel="noopener"><span data-contrast="none">IE Commuter program</span></a><span data-contrast="auto">. The program supported more than 1,100 employers with ridesharing programs and reduced 10.7 million pounds of vehicle emissions in 2023.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="auto">RCTC’s environmental stewardship extends beyond just transportation. As the managing agency of the </span><a href="https://www.wrc-rca.org/" target="_blank" rel="noopener"><span data-contrast="none">Western Riverside County Regional Conservation Authority</span></a><span data-contrast="auto"> (RCA), RCTC continues to help the RCA drive conservation efforts in western Riverside County. The RCA is tasked with establishing a 500,000-acre habitat reserve under the Multiple Species Habitat Conservation Plan (MSHCP) – one of the largest conservation plans in the nation. 2023 was a year marked by significant funding and agency-led advocacy effort successes. The RCA secured nearly $27 million in various state and federal grants and acquired </span><span data-contrast="auto">more</span> <span data-contrast="auto">1,120 acres of sensitive habitat for protection. As of this writing, over 415,000 acres of habitat have been assembled as part of the MSHCP.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
</div><div class="un-media-gallery owl-carousel-wrapper">
		
	
	<div class="owl-carousel-container owl-carousel-loading single-gutter" >
									<div id="gallery-339031" class="owl-carousel owl-element owl-height-auto owl-dots-outside owl-dots-single-block-padding owl-dots-align-center" data-fade="true" data-loop="true" data-dots="true" data-dotsmobile="true" data-nav="true" data-navmobile="false" data-navskin="light" data-navspeed="200" data-autoplay="false" data-stagepadding="0" data-lg="1" data-md="1" data-sm="1">
<div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-96545  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.2%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2024/02/0224_RCA_Lands.jpg" class="pushed" aria-label="0224 RCA Lands"  data-active="1" data-lbox="ilightbox_gallery-339031" data-options="width:1500,height:981,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/02/0224_RCA_Lands-300x196.jpg'" data-lb-index="0"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-96545" src="https://www.rctc.org/wp-content/uploads/2024/02/0224_RCA_Lands-uai-1500x843.jpg" width="1500" height="843" alt="0224 RCA Lands" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">Over 415,000 acres of habitat have been assembled as part of the MSHCP. The goal of the MSCHP, which began in 2004, is to assemble a 500,000-acre habitat reserve in western Riverside County.</p></div></div>
							</div></div></div><div class="tmb tmb-carousel tmb-iso-h4 tmb-light tmb-overlay-text-anim tmb-overlay-anim tmb-content-center tmb-image-anim tmb-bordered tmb-id-91956  tmb-img-ratio tmb-content-under tmb-media-first tmb-no-bg tmb-lightbox" ><div class="t-inside no-anim" ><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="t-entry-visual-cont"><div class="dummy" style="padding-top: 56.3%;"></div><a role="button" tabindex="-1" href="https://www.rctc.org/wp-content/uploads/2023/06/0623_Point_Bundy_Canyon.jpg" class="pushed" aria-label="0623 Point Bundy Canyon"  data-active="1" data-lbox="ilightbox_gallery-339031" data-options="width:1500,height:824,thumbnail: 'https://www.rctc.org/wp-content/uploads/2023/06/0623_Point_Bundy_Canyon-300x165.jpg'" data-lb-index="1"><div class="t-entry-visual-overlay"><div class="t-entry-visual-overlay-in style-dark-bg" style="opacity: 0.5;"></div></div><img decoding="async" class="wp-image-91956" src="https://www.rctc.org/wp-content/uploads/2023/06/0623_Point_Bundy_Canyon-uai-1464x824.jpg" width="1464" height="824" alt="0623 Point Bundy Canyon" /></a></div>
					</div>
				</div><div class="t-entry-text">
									<div class="t-entry-text-tc single-block-padding"><div class="t-entry"><p class="t-entry-excerpt ">The Regional Arterial Program awarded $135 million in funding to 18 significant regional transportation projects in 2023.</p></div></div>
							</div></div></div>			</div>
					</div>

	
	
	
</div>

<div class="uncode_text_column text-lead" ><p><span data-contrast="auto">The twice voter-approved Measure A continued to be a critical funding source for transit services, local roads, and highway projects. In 2023, RCTC approved over $310 million in Measure A funding for countywide projects: $135 million in funding for 18 significant regional transportation projects as part of the </span><a href="https://www.rctc.org/commission-awards-135-million-in-local-funds-for-regional-arterial-projects/"><span data-contrast="none">Regional Arterial Program</span></a><span data-contrast="auto">, an additional $143.9 million for 285 local road projects, and allocated over $32 million in Measure A funds for local bus systems, passenger rail, and specialized transit services.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="auto">As we move forward into 2024, RCTC is looking ahead at the future of transportation in our communities. To address the growing needs of Riverside County, </span><span data-contrast="auto">RCTC has drafted a 2024 Traffic Relief Plan outlining future transportation infrastructure enhancements, increased transit services, and </span><span data-contrast="auto">repairing our</span><span data-contrast="auto"> local streets and roads. Residents are urged to provide their input at </span><a href="http://trafficreliefplan.org/"><span data-contrast="none">trafficreliefplan.org</span></a><span data-contrast="auto"> to make sure future transportation needs continue to be met.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
<p><span data-contrast="auto">Learn more about RCTC’s 2023 work and accomplishments in the official <a href="https://www.rctc.org/wp-content/uploads/2024/02/2023_RCTC_Annual_Report.pdf" target="_blank" rel="noopener">Annual Report</a>.</span><span data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:160,&quot;335559740&quot;:259}"> </span></p>
</div><div class="empty-space empty-double desktop-hidden tablet-hidden" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-27" data-row="script-row-unique-27" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-27"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-28"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-28" data-row="script-row-unique-28" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-28"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/2023-making-strides/">2023: Making Strides</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
