<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Projects Archives - Riverside County Transportation Commission (RCTC)</title>
	<atom:link href="https://www.rctc.org/category/construction/projects/feed/" rel="self" type="application/rss+xml" />
	<link></link>
	<description></description>
	<lastBuildDate>Wed, 18 Nov 2026 23:14:45 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://www.rctc.org/wp-content/uploads/2017/03/cropped-RCTC-Favicon@4x-32x32.png</url>
	<title>Projects Archives - Riverside County Transportation Commission (RCTC)</title>
	<link></link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Weekend Closure of Metrolink 91/Perris Valley Line Scheduled for November 21-22</title>
		<link>https://www.rctc.org/november-21-22-closure-91-perris-valley-line/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 18 Nov 2026 18:07:00 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Station]]></category>
		<category><![CDATA[Train]]></category>
		<category><![CDATA[Transit]]></category>
		<category><![CDATA[91/Perris Valley Line]]></category>
		<category><![CDATA[91/PVL]]></category>
		<category><![CDATA[metrolink]]></category>
		<category><![CDATA[metrolink station]]></category>
		<category><![CDATA[Perris]]></category>
		<category><![CDATA[Perris Valley Line]]></category>
		<category><![CDATA[train]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=117182</guid>

					<description><![CDATA[<p>The Point: Closure will allow crews to complete improvements at the Perris-South Metrolink station</p>
<p>The post <a href="https://www.rctc.org/november-21-22-closure-91-perris-valley-line/">Weekend Closure of Metrolink 91/Perris Valley Line Scheduled for November 21-22</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-0"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closure will allow crews to complete improvements at the Perris-South Metrolink station<br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-0" data-row="script-row-unique-0" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-0"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-1"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Metrolink service at four 91/Perris Valley Line stations will be suspended on Saturday, November 21 and Sunday, November 22, 2026, as part of RCTC’s <a href="https://www.rctc.org/projects/perris-south-metrolink-station-and-layover-facility/">Perris-South Metrolink Station and Layover Facility Project</a>.</p>
<p>During the weekend closure, there will be no Metrolink train service at the Riverside-Hunter Park/UCR, Moreno Valley/March Field, Perris-Downtown, and Perris-South stations. Train service is anticipated to resume on Monday, November 23, in time for the morning commute, following completion of construction and final inspections.</p>
<p>The closure will allow crews to complete critical track and station improvements at Perris-South Station, including installing new track switches, replacing emergency vehicle and pedestrian crossings, and extending the station platform. Crews will also perform related track work and required inspections before service resumes.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 55.2%;"></div><a href="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-116782" data-options="width:1200,height:662,thumbnail: 'https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-300x166.jpg'"><img fetchpriority="high" decoding="async" class="wp-image-116782" src="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg" width="1200" height="662" alt="" srcset="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg 1200w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-300x166.jpg 300w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-1024x565.jpg 1024w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-768x424.jpg 768w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-350x193.jpg 350w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-500x276.jpg 500w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-800x441.jpg 800w" sizes="(max-width: 1200px) 100vw, 1200px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Metrolink service from Riverside-Downtown and stations west will continue to operate on the regular weekend schedule. No alternate bus or shuttle service will be provided at the affected stations. Passengers traveling to or from these stations should plan ahead and arrange alternate transportation.</p>
<p>For the latest project information, please visit: <a href="https://www.rctc.org/projects/perris-south-metrolink-station-and-layover-facility/">rctc.org/perrissouthstation</a></p>
</div></div></div></div></div></div><script id="script-row-unique-1" data-row="script-row-unique-1" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-1"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-2"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-2" data-row="script-row-unique-2" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-2"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/november-21-22-closure-91-perris-valley-line/">Weekend Closure of Metrolink 91/Perris Valley Line Scheduled for November 21-22</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Two-Day Weekend Closure of Metrolink 91/Perris Valley Line October 17 and 18</title>
		<link>https://www.rctc.org/weekend-closure-91pvl-oct-2026/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 14 Oct 2026 15:03:01 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Metrolink]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Rail]]></category>
		<category><![CDATA[Station]]></category>
		<category><![CDATA[Train]]></category>
		<category><![CDATA[Transit]]></category>
		<category><![CDATA[91/Perris Valley Line]]></category>
		<category><![CDATA[91/PVL]]></category>
		<category><![CDATA[metrolink]]></category>
		<category><![CDATA[metrolink station]]></category>
		<category><![CDATA[Perris]]></category>
		<category><![CDATA[Perris Valley Line]]></category>
		<category><![CDATA[train]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=116778</guid>

					<description><![CDATA[<p>The Point: Closure will allow crews to complete improvements at the Perris-South Metrolink station</p>
<p>The post <a href="https://www.rctc.org/weekend-closure-91pvl-oct-2026/">Two-Day Weekend Closure of Metrolink 91/Perris Valley Line October 17 and 18</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-3"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="TrackedChange SCXW132085906 BCX8"><span class="TextRun SCXW132085906 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW132085906 BCX8">Closure will allow crews to complete improvements at the Perris-South Metrolink station</span></span></span><br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-3" data-row="script-row-unique-3" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-3"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-4"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Metrolink service at four 91/Perris Valley Line stations will be suspended on Saturday, October 17 and Sunday, October 18, 2026, as part of RCTC’s <a href="https://www.rctc.org/projects/perris-south-metrolink-station-and-layover-facility/">Perris-South Metrolink Station and Layover Facility Project</a>.</p>
<p>The two-day weekend closure will allow crews to safely perform critical construction activities at the Perris-South Metrolink Station, including construction of a new retaining wall, grading for the platform extension, demolition of a portion of the existing platform, track work, and required inspections before the track is returned to service.</p>
<p>During the weekend closure, there will be no Metrolink train service at the Perris-South, Perris-Downtown, Moreno Valley/March Field, and Riverside-Hunter Park/UCR stations. Service will resume on Monday, October 19.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 55.2%;"></div><a href="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg" class="pushed" data-active="1" data-lbox="ilightbox_single-116782" data-options="width:1200,height:662,thumbnail: 'https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-300x166.jpg'"><img decoding="async" class="wp-image-116782" src="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg" width="1200" height="662" alt="" srcset="https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3.jpg 1200w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-300x166.jpg 300w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-1024x565.jpg 1024w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-768x424.jpg 768w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-350x193.jpg 350w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-500x276.jpg 500w, https://www.rctc.org/wp-content/uploads/2026/10/RCTC_91PVL_StationClosureMap_10-7-26_v3-800x441.jpg 800w" sizes="(max-width: 1200px) 100vw, 1200px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Metrolink service from Riverside-Downtown and stations west will continue to operate on the regular weekend schedule. No alternate bus or shuttle service will be provided at the affected stations. Passengers traveling to or from these stations should plan ahead and arrange alternate transportation.</p>
<p>RCTC, in partnership with Metrolink, Caltrans, and the City of Perris, is expanding the Perris-South Metrolink Station and adjacent train layover facility. The project will add a second passenger loading platform, new canopies and other passenger amenities, more than 1,000 feet of new station track, and a fourth track at the layover maintenance facility to help improve Metrolink service operations.</p>
<p>Construction on the project began in June 2026 and is expected to be completed in 2028. Funding for the project is provided by a mix of local and state transportation sources, including <a href="https://www.rctc.org/measure-a/">Measure A</a>.</p>
<p>For the latest project information, please visit: <a href="https://www.rctc.org/projects/perris-south-metrolink-station-and-layover-facility/">rctc.org/perrissouthstation</a></p>
</div></div></div></div></div></div><script id="script-row-unique-4" data-row="script-row-unique-4" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-4"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-5"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-5" data-row="script-row-unique-5" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-5"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/weekend-closure-91pvl-oct-2026/">Two-Day Weekend Closure of Metrolink 91/Perris Valley Line October 17 and 18</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Updated Smart Room Offers Performance Data for the I-15 Smart Freeway Pilot Project</title>
		<link>https://www.rctc.org/updated-smart-room-offers-performance-data-for-the-i-15-smart-freeway-pilot-project/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 30 Sep 2026 20:11:48 +0000</pubDate>
				<category><![CDATA[Community]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Murrieta]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Smart Freeway]]></category>
		<category><![CDATA[Temecula]]></category>
		<category><![CDATA[freeway]]></category>
		<category><![CDATA[I-15 Smart Freeway Pilot Project]]></category>
		<category><![CDATA[smart]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=116615</guid>

					<description><![CDATA[<p>The Point: New online tools help residents understand how the pilot Smart Freeway system works and track the project’s performance</p>
<p>The post <a href="https://www.rctc.org/updated-smart-room-offers-performance-data-for-the-i-15-smart-freeway-pilot-project/">Updated Smart Room Offers Performance Data for the I-15 Smart Freeway Pilot Project</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-6"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="TrackedChange SCXW132085906 BCX8"><span class="TextRun SCXW132085906 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW132085906 BCX8">New online tools help residents understand how the pilot Smart Freeway system works and track the project’s performance</span></span></span><br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-6" data-row="script-row-unique-6" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-6"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-7"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>As part of the I-15 Smart Freeway Pilot Project, an updated online <a href="http://www.Smartfreeway.org" target="_blank" rel="noopener">Smart Room</a> has been relaunched and now includes a new performance dashboard to help residents understand how the system works and track its performance.</p>
<p>The Smart Freeway system uses technology and existing roadway infrastructure to help manage congestion on the northbound 15 between the Riverside/San Diego County line in Temecula and the I-15/I-215 interchange in Murrieta. Roadside sensors monitor traffic conditions, while coordinated ramp meters at Temecula Parkway, Rancho California Road, and Winchester Road adjust the flow of vehicles entering the freeway.</p>
<p>The updated Smart Room is an immersive online resource for learning how the Smart Freeway works. Visitors can move through the virtual space at their own pace to see where the pilot operates, learn how the different parts of the system work together, and understand what drivers may experience when the system is active. The Smart Room also includes frequently asked questions, project updates, videos, and the performance dashboard.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-116619" src="https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard.png" width="1915" height="898" alt="0926 The Point Smart Dashboard" srcset="https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard.png 1915w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-300x141.png 300w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-1024x480.png 1024w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-768x360.png 768w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-1536x720.png 1536w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-350x164.png 350w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-24x11.png 24w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-36x17.png 36w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-48x23.png 48w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-500x234.png 500w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-800x375.png 800w, https://www.rctc.org/wp-content/uploads/2026/09/0926_The-Point_Smart-Dashboard-1280x600.png 1280w" sizes="(max-width: 1915px) 100vw, 1915px" /></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Through the new performance dashboard, residents will be able to track Smart Freeway system performance throughout the 2-year pilot period. Currently, the performance dashboard includes information on vehicle throughput and travel time. The Smart Freeway system comes with a lot of technical information, and additional key performance indicators will be added to the dashboard as RCTC gathers more data on performance. A glossary with terms and how the data should be read is also included in the performance dashboard.</p>
<p>Check out the Smart Room by visiting <a href="http://www.Smartfreeway.org" target="_blank" rel="noopener">Smartfreeway.org</a></p>
</div></div></div></div></div></div><script id="script-row-unique-7" data-row="script-row-unique-7" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-7"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-8"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-8" data-row="script-row-unique-8" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-8"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/updated-smart-room-offers-performance-data-for-the-i-15-smart-freeway-pilot-project/">Updated Smart Room Offers Performance Data for the I-15 Smart Freeway Pilot Project</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>RCTC Awarded $25 Million for Vital Improvements Along One of The Most Travelled Corridors in the United States</title>
		<link>https://www.rctc.org/rctc-awarded-25-million-for-91-ecop/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 15 Jul 2026 17:33:57 +0000</pubDate>
				<category><![CDATA[91]]></category>
		<category><![CDATA[Commission]]></category>
		<category><![CDATA[Federal Funding]]></category>
		<category><![CDATA[Funding]]></category>
		<category><![CDATA[Grants]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[MCP]]></category>
		<category><![CDATA[Measure A]]></category>
		<category><![CDATA[Mid County Parkway]]></category>
		<category><![CDATA[Ramona Expressway]]></category>
		<category><![CDATA[static]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=112706</guid>

					<description><![CDATA[<p>The Point: Thanks to the federal funds, the 91 Eastbound Corridor Operations Project is closer to begin construction in 2028</p>
<p>The post <a href="https://www.rctc.org/rctc-awarded-25-million-for-91-ecop/">RCTC Awarded $25 Million for Vital Improvements Along One of The Most Travelled Corridors in the United States</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-9"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="TextRun SCXW81223149 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW81223149 BCX8">Thanks to the federal funds, the 91 Eastbound Corridor Operations Project is closer to begin construction in 2028</span></span><br />
</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-9" data-row="script-row-unique-9" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-9"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-10"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Good news for 91 drivers heading back from Orange County – the SR-91 Eastbound Corridor Operations Project (ECOP) was awarded with new funding through the U.S. Department of Transportation (DOT) earlier this month. Once completed, the 91 ECOP project will provide motorists a three-mile, non-tolled auxiliary lane on eastbound SR-91 between the SR-241 connector and SR-71 near Green River Road. Improvements will also include widening two bridges, constructing retaining walls, implementing rockfall mitigation measures, replacing overhead signs, and building a new two-lane exit ramp at Green River Road.</p>
<p>“With more than 300,000 vehicles traveling SR-91 between Riverside and Orange counties each day, continued investment in the corridor is needed to keep our communities moving,” said RCTC Chair Raymond Gregory. “RCTC appreciates the U.S. Department of Transportation for recognizing the importance of this project through the BUILD grant program, and we thank Representatives Ken Calvert and Young Kim for their leadership in supporting the project’s grant application. These funds help improve traffic operations on the 91.&#8221;</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-img-ratio tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 56.3%;"></div><a href="https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million.png" class="pushed" data-active="1" data-lbox="ilightbox_single-112711" data-options="width:1920,height:1080,thumbnail: 'https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-300x169.png'"><img decoding="async" class="wp-image-112711" src="https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million.png" width="1920" height="1080" alt="0726 The Point ECOP $25 Million" srcset="https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million.png 1920w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-300x169.png 300w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-1024x576.png 1024w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-768x432.png 768w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-1536x864.png 1536w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-350x197.png 350w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-24x14.png 24w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-36x20.png 36w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-48x27.png 48w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-500x281.png 500w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-800x450.png 800w, https://www.rctc.org/wp-content/uploads/2026/07/0726-The-Point-ECOP-25-Million-1280x720.png 1280w" sizes="(max-width: 1920px) 100vw, 1920px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>The SR-91 corridor is one of the most traveled corridors in the United States, serving thousands of commuters, businesses, and goods movement throughout the region. The $25 million Better Utilizing Investments to Leverage Development (BUILD) grant provides a significant federal investment toward advancing the project from design to construction.</p>
<p>RCTC is advancing the project in partnership with the California Department of Transportation and the Orange County Transportation Authority to help improve traffic flow, support economic development, and enhance travel reliability throughout the region. Construction is expected to begin in 2028. The $178 million for construction of the 91 ECOP will be funded through a combination of federal, state, and local funds, as well as toll revenues.</p>
<p>USDOT’s BUILD grant program is a nationally competitive discretionary grant program that funds significant transportation infrastructure projects across the country. The grant is used for transportation infrastructure projects with significant local or regional impact.</p>
<p>For more information, visit <a href="http://rctc.org/91ecop" target="_blank" rel="noopener">rctc.org/91ecop</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-10" data-row="script-row-unique-10" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-10"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-11"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-11" data-row="script-row-unique-11" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-11"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/rctc-awarded-25-million-for-91-ecop/">RCTC Awarded $25 Million for Vital Improvements Along One of The Most Travelled Corridors in the United States</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Extended Closure of Northbound 15 Temecula Parkway On-Ramp to Begin May 11</title>
		<link>https://www.rctc.org/extended-closure-of-northbound-15-temecula-parkway-on-ramp-to-begin-may-11/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 30 Apr 2025 19:12:38 +0000</pubDate>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Lifestyle]]></category>
		<category><![CDATA[Murrieta]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Smart Freeway]]></category>
		<category><![CDATA[Temecula]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[closure]]></category>
		<category><![CDATA[construction]]></category>
		<category><![CDATA[pilot project]]></category>
		<category><![CDATA[smart]]></category>
		<category><![CDATA[technology]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=106234</guid>

					<description><![CDATA[<p>The Point: Temecula Parkway on-ramp closure will allow crews to safety reconstruct the ramp for the I-15 Smart Freeway Pilot Project </p>
<p>The post <a href="https://www.rctc.org/extended-closure-of-northbound-15-temecula-parkway-on-ramp-to-begin-may-11/">Extended Closure of Northbound 15 Temecula Parkway On-Ramp to Begin May 11</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-12"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="TextRun SCXW87024163 BCX8" lang="EN-US" xml:lang="EN-US" data-contrast="auto"><span class="NormalTextRun SCXW87024163 BCX8">Temecula Parkway on-ramp closure will </span><span class="NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW87024163 BCX8">allow</span><span class="NormalTextRun SCXW87024163 BCX8"> crews to </span><span class="NormalTextRun SpellingErrorV2Themed SCXW87024163 BCX8">safety</span><span class="NormalTextRun SCXW87024163 BCX8"> reconstruct the ramp for the I-15 Smart Freeway Pilot Project</span></span><span class="EOP SCXW87024163 BCX8" data-ccp-props="{&quot;201341983&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}"> </span></strong></p>
</div></div></div></div></div></div><script id="script-row-unique-12" data-row="script-row-unique-12" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-12"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-13"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column cancelled text-lead" ><p>The extended northbound I-15 Rancho California direct on-ramp closure has been canceled. The closure, which was scheduled to begin on Monday, June 23, was canceled due to unforeseen circumstances. Please check the <a style="color: #104987!important;" href="https://www.rctc.org/temeculaclosures/">closures webpage</a> for the rescheduled date.</p>
</div><div class="uncode_text_column text-lead" ><p>Residents and motorists who are planning to enter northbound 15 using the Temecula Parkway on-ramp are advised to plan for an extended closure of the ramp. RCTC will require an extended full closure of the northbound I-15 Temecula Parkway on-ramp beginning on Sunday, May 11 at 9 p.m. through Monday, May 19 at 5 a.m. The closures are needed to allow crews to safely demolish and reconstruct portions of the on-ramp to provide an additional lane for the I-15 Smart Freeway Pilot Project. The work will require the use of heavy construction equipment during the extended closure.</p>
<p>During the closure, motorists are advised to travel west on Temecula Parkway, northbound on Old Town Front Street, east on Santiago Road, north on Ynez Road, and west on Rancho California Road to enter northbound I-15.</p>
</div><div class="uncode-single-media  text-center"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><img decoding="async" class="wp-image-106240" src="https://www.rctc.org/wp-content/uploads/2025/04/Temecula-Pkwy-detour-map_1.gif" width="719" height="508" alt="Temecula Pkwy detour map 1"></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Closure dates are subject to change due to weather, site conditions, construction progress, and other factors.</p>
<p>Once in operation, the I-15 Smart Freeway Pilot Project will use a dynamic coordinated metering system to allow more or fewer vehicles to enter the highway at a given time, allowing for a smoother traffic flow on the northbound 15. The system is designed to improve traffic and reduce collisions on the eight-mile stretch of the northbound I-15 from the County Line in Temecula to the I-15/I-215 Interchange in Murrieta.</p>
<p>For more information about the Smart Freeway Pilot Project and the Temecula Parkway on-ramp closure, visit <a href="http://rctc.org/temeculaclosures">rctc.org/temeculaclosures</a></p>
</div></div></div></div></div></div><script id="script-row-unique-13" data-row="script-row-unique-13" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-13"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-14"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-14" data-row="script-row-unique-14" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-14"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/extended-closure-of-northbound-15-temecula-parkway-on-ramp-to-begin-may-11/">Extended Closure of Northbound 15 Temecula Parkway On-Ramp to Begin May 11</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</title>
		<link>https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Thu, 27 Feb 2025 15:00:07 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=105441</guid>

					<description><![CDATA[<p>The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes</p>
<p>The post <a href="https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/">Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-15"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Nightly closures will allow crews to safely remove support structures from the new connector above southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-15" data-row="script-row-unique-15" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-15"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-16"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column storyUpdate text-lead text-color-xsdn-color" ></p>
<p style="text-align: center;"><span style="color: #ffffff;">March 24, 2025 Update:<br />
The weeknight full closures of southbound 71 have been extended through April 4</span></p>
<p>
</div><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to be prepared for weeknight (Monday &#8211; Friday) full closures of southbound 71 from Butterfield Ranch Rd/Euclid Ave to the 91. The closures of southbound 71 will begin Monday, March 3 through Friday, April 11 as part of <a href="https://www.rctc.org/projects/71-91-interchange-project/">RCTC’s 71/91 Interchange Project</a>. The southbound 71 to eastbound and westbound 91 connectors will also be closed during this time.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and 11:59 p.m. to 6 a.m. on Friday nights. These nighttime closures will allow construction crews to safely remove support structures from the recently constructed new sections of the connector. Additional nighttime lane reduction configurations along eastbound and westbound 91 may also occur during these nightly closures.</p>
<p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100937" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png'"><img decoding="async" class="wp-image-100937" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>The new non-tolled interchange is designed to improve safety, expand access to other modes of travel, reduce greenhouse gas emissions, enhance traffic flow, and support continued movement of native wildlife through the area. Construction began in 2023 and is expected to be completed later this year. To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project <a href="https://www.rctc.org/projects/71-91-interchange-project/">webpage</a>. For the latest closure information, visit: <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a></p>
</div></div></div></div></div></div><script id="script-row-unique-16" data-row="script-row-unique-16" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-16"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-17"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-17" data-row="script-row-unique-17" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-17"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/weeknight-full-closures-southbound-71-march-2025/">Plan Ahead &#8211; Full Weeknight Closures of Southbound 71 Scheduled March 3 &#8211; April 4</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>I-15 Smart Freeway Pilot Project Construction Begins</title>
		<link>https://www.rctc.org/i-15-smart-freeway-pilot-project-construction-begins/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 27 Jan 2025 22:02:00 +0000</pubDate>
				<category><![CDATA[Construction]]></category>
		<category><![CDATA[I-15]]></category>
		<category><![CDATA[Murrieta]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Smart Freeway]]></category>
		<category><![CDATA[Temecula]]></category>
		<category><![CDATA[15]]></category>
		<category><![CDATA[construction]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=104822</guid>

					<description><![CDATA[<p>The Point: Construction on the 8-mile stretch of the northbound 15 between Temecula and Murrieta has begun</p>
<p>The post <a href="https://www.rctc.org/i-15-smart-freeway-pilot-project-construction-begins/">I-15 Smart Freeway Pilot Project Construction Begins</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-18"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: <span class="NormalTextRun CommentStart ContextualSpellingAndGrammarErrorV2Themed CommentHighlightPipeRestRefresh CommentHighlightRest GrammarErrorHighlight SCXW206577289 BCX8">Crews</span><span class="NormalTextRun CommentHighlightRest SCXW206577289 BCX8"> have begun work on the I-15 Smart Freeway Pilot Project</span><span class="NormalTextRun CommentHighlightRest SCXW206577289 BCX8"> on the</span><span class="NormalTextRun CommentHighlightRest SCXW206577289 BCX8"> northbound 15</span><span class="NormalTextRun CommentHighlightRest SCXW206577289 BCX8"> between Temecula and Murrieta</span></strong></p>
</div></div></div></div></div></div><script id="script-row-unique-18" data-row="script-row-unique-18" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-18"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-19"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>New Year, new construction project. RCTC, in partnership with Caltrans, the city of Temecula, and the Western Riverside Council of Governments, broke ground on the innovative I-15 Smart Freeway Pilot Project on January 6. When completed, the I-15 Smart Freeway system will be the first of its kind in California with the goal to improve traffic flow on northbound I-15 from the San Diego/Riverside County Line in Temecula to the I-15/I-215 Interchange in Murrieta.</p>
<p>During construction, crews will make updates and improvements to the northbound I-15. These upgrades include the construction of ramp entrance lanes, installing sensor technology, and enhancing ramp meters that will communicate with each other. This intercommunication between ramps will optimize entrance onto the freeway. To safely make these improvements, crews will require nighttime lane and ramp closures during construction.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><a class="single-media-link" href="https://www.youtube.com/watch?v=8j9C6LN4hNY"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="h3 fluid-object" style="padding-top: 56.25%"><iframe width="560" height="315" src="https://www.youtube.com/embed/8j9C6LN4hNY?si=JsvVLLS0gr2yao7r" title="YouTube video player" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" referrerpolicy="strict-origin-when-cross-origin" allowfullscreen></iframe></div></div>
					</div>
				</div></div></div></a></div></div><div class="uncode_text_column text-lead" ><p>Work to complete the project is anticipated to take 9 months and when complete, RCTC and Caltrans will activate the technology portion of the project for a two-year pilot period. This pilot period will allow time to evaluate the success of the project. Ramp metering technology will continuously monitor and adjust to real-time traffic conditions across three ramps. Tire-level sensors will track car volumes and as vehicles enter the freeway, the on-ramp meters at Temecula Parkway, Rancho California Road, and Winchester Road will work as an integrated system to optimize incoming traffic flow on I-15. A system of algorithms and specialized teams will monitor on-ramp queues for back-ups, and if needed, the system will increase cycle speed to release more cars onto the freeway to avoid backup onto local streets.</p>
<p>The public can track the results on a dashboard posted at<a href="http://Smartfreeway.org" target="_blank" rel="noopener"> Smartfreeway.org</a> during the pilot period. This project is an innovative solution to reducing traffic across our region that differs from costly, difficult-to-implement highway expansion projects.</p>
<p>Smart Freeway systems have successfully reduced travel time, accidents, and greenhouse gas emissions across various parts of Australia. The Smart Freeway system has also been tested in Denver, Colorado, with the pilot period completed in July 2022. That project was successful, and the State of Colorado seeks to make it permanent.</p>
<p>For more information about the Smart Freeway Pilot Project and to sign up for construction updates, please visit <a href="https://www.rctc.org/projects/smart-fwy-pilot/">www.rctc.org/projects/smart-fwy-pilot/</a></p>
</div></div></div></div></div></div><script id="script-row-unique-19" data-row="script-row-unique-19" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-19"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-20"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-20" data-row="script-row-unique-20" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-20"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/i-15-smart-freeway-pilot-project-construction-begins/">I-15 Smart Freeway Pilot Project Construction Begins</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</title>
		<link>https://www.rctc.org/westbound-91-full-weeknight-closures-2024/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Mon, 25 Nov 2024 23:26:33 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=103625</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely continue removing support structures above the 91</p>
<p>The post <a href="https://www.rctc.org/westbound-91-full-weeknight-closures-2024/">Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-21"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely continue removing support structures above the 91</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-21" data-row="script-row-unique-21" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-21"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-22"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling through Corona are advised to steer clear of full weeknight closures of westbound 91. Beginning December 2, 2024, the westbound 91 will be closed between the 71 and Green River Road on Monday through Wednesday nights as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a>. The closures are scheduled through Wednesday, December 18, 2024.</p>
<p><strong>Due to the holidays, no closures will be scheduled from December 20 through January 1, 2025. Closures are anticipated to restart on Monday, January 6, 2025.</strong></p>
<p>The full closure will allow crews to remove more than 40 beams of support structures that span above the westbound 91 lanes. This work requires precision and time to be completed safely. Over the summer, crews completed a similar operation with the removal of support structures over eastbound 91.</p>
</div><div class="uncode-single-media  text-left"><div class="single-wrapper" style="max-width: 100%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="h3 object-size self-video fluid-object" style="padding-top: 56.25%"><div style="width: 640px;" class="wp-video"><video class="wp-video-shortcode" id="video-103625-1" width="640" height="360" loop autoplay preload="metadata" controls="controls" playsinline data-keepplaying><source type="video/mp4" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4?_=1"><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4">https://www.rctc.org/wp-content/uploads/2024/11/1124_The_Point_WB91_Closures_Video_RZ.mp4</a></video></div></div></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Motorists traveling on the westbound 91 and southbound 71 should plan extra time to reach local destinations and businesses in the area. Detailed closure information below:</p>
<table style="width: 100%;">
<colgroup>
<col style="width: 30%;" span="1" />
<col style="width: 70%;" span="1" /> </colgroup>
<tbody>
<tr>
<th style="text-align: center;">
<h4><strong>Date &amp; Time</strong></h4>
</th>
<th style="text-align: center;">
<h4><strong>Location</strong></h4>
</th>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
10 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full closure of westbound 91 lanes from the 71 to Green River Road</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full westbound 91 Express Lanes closures from I-15 to the Orange County/Riverside County Line</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 5 a.m.</td>
<td style="text-align: center;">Full southbound 71 to westbound 91 connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
8 p.m. to 4 a.m.</td>
<td style="text-align: center;">Full northbound/southbound 15 to westbound 91 Express Lanes connector closure</td>
</tr>
<tr>
<td style="text-align: center;"><strong>Monday &#8211; Wednesday</strong><br />
9 p.m. to 4 a.m.</td>
<td style="text-align: center;">Westbound 91 Green River Road off-ramp closure</td>
</tr>
</tbody>
</table>
<p>To avoid lengthy traffic delays, motorists are highly advised to avoid the westbound 91 by using the northbound 71 to westbound 60 to southbound 57 to get around the closure. Construction activity is subject to change due to weather or other factors.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 74.5%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" class="pushed" data-active="1" data-lbox="ilightbox_single-103127" data-options="width:1198,height:893,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png'"><img decoding="async" class="wp-image-103127" src="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png" width="1198" height="893" alt="1124 WB91 Closures Detour Map" srcset="https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map.png 1198w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-300x224.png 300w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-1024x763.png 1024w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-768x572.png 768w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-500x373.png 500w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-800x596.png 800w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-350x261.png 350w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-24x18.png 24w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-36x27.png 36w, https://www.rctc.org/wp-content/uploads/2024/11/1124_WB91_Closures_Detour_Map-48x36.png 48w" sizes="(max-width: 1198px) 100vw, 1198px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p><span data-contrast="auto">RCTC, in partnership with Caltrans, is reconstructing the 71/91 interchange in Corona. The project will replace the single-lane loop connector between the eastbound 91 and northbound 71 with a new, two-lane, direct connector ramp. The project is anticipated to be completed in 2025. </span><span data-ccp-props="{}"> </span></p>
<p><span data-contrast="auto">To register for construction updates, text </span><i><span data-contrast="auto">7191interchange</span></i><span data-contrast="auto"> to (855) 793-2625 or sign up through the project </span><a href="https://www.rctc.org/projects/71-91-interchange-project/"><span data-contrast="none">webpage</span></a><span data-contrast="auto">. View the latest construction activity at: </span><a href="https://www.rctc.org/7191updates/"><span data-contrast="none">rctc.org/7191updates</span></a><span data-ccp-props="{}"> </span></p>
</div></div></div></div></div></div><script id="script-row-unique-22" data-row="script-row-unique-22" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-22"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-23"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-23" data-row="script-row-unique-23" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-23"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/westbound-91-full-weeknight-closures-2024/">Weeknight Full Closures of Westbound 91 in Corona Begin December 2, 2024</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</title>
		<link>https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Fri, 13 Sep 2024 22:05:09 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=101448</guid>

					<description><![CDATA[<p>The Point: Closures will allow crews to safely build support structures for the new connector</p>
<p>The post <a href="https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/">Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-24"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closures will allow crews to safely build support structures for the new connector</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-24" data-row="script-row-unique-24" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-24"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-25"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists traveling on southbound 71 through Chino Hills are advised to stay alert for weeknight full closures of southbound 71 at Butterfield Ranch Rd/Euclid Ave. The Monday through Friday nighttime closures of southbound 71 are scheduled from Monday, September 16 through late-October as part of RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project.</a> The southbound 71 to eastbound and westbound 91 connectors will also be closed.</p>
<p>The closures will take place from 9 p.m. to 5 a.m., Monday through Thursday nights, and midnight to 6 a.m. on Friday nights. During these nighttime closures, construction crews will be building a new portion of support structures for the new eastbound 91 to northbound 71 connector. Additional nighttime lane reductions along eastbound and westbound 91 may also occur during these nightly closures.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/iHQLK-pg33M" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid traffic delays, motorists are urged to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on southbound 71 will be rerouted to the Euclid Ave off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>To register for construction updates, text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>. For the latest closure information, visit <a href="https://www.rctc.org/7191closures/">rctc.org/7191Closures</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-25" data-row="script-row-unique-25" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-25"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-26"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-26" data-row="script-row-unique-26" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-26"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/full-weeknight-closures-southbound-71-september-october/">Heads Up! Full Weeknight Closures of Southbound 71 at Euclid Ave, September 16 through Late-October</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</title>
		<link>https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/</link>
		
		<dc:creator><![CDATA[RCTC]]></dc:creator>
		<pubDate>Wed, 14 Aug 2024 14:00:38 +0000</pubDate>
				<category><![CDATA[71]]></category>
		<category><![CDATA[71/91]]></category>
		<category><![CDATA[91]]></category>
		<category><![CDATA[Construction]]></category>
		<category><![CDATA[Highway]]></category>
		<category><![CDATA[Projects]]></category>
		<category><![CDATA[Travel]]></category>
		<category><![CDATA[7191]]></category>
		<category><![CDATA[closures]]></category>
		<category><![CDATA[Corona]]></category>
		<category><![CDATA[Detour]]></category>
		<category><![CDATA[eastbound]]></category>
		<category><![CDATA[riverside]]></category>
		<guid isPermaLink="false">https://www.rctc.org/?p=100704</guid>

					<description><![CDATA[<p>The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes</p>
<p>The post <a href="https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/">Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div data-parent="true" class="vc_row row-container" id="row-unique-27"><div class="row single-top-padding no-bottom-padding single-h-padding limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead text-color-xsdn-color" ><p><strong>The Point: Closure will allow crews to safely perform traffic switch to new southbound 71 lanes</strong></p>
</div></div></div></div></div></div><script id="script-row-unique-27" data-row="script-row-unique-27" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-27"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-28"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="uncode_text_column text-lead" ><p>Motorists making their way south through Chino and Chino Hills should avoid the southbound 71 or be prepared to face heavy traffic delays. RCTC’s <a href="https://www.rctc.org/projects/71-91-interchange-project/">71/91 Interchange Project</a> will require a full weekend closure beginning Friday, August 16 at 10 p.m. through Monday, August 19 at 5 a.m.</p>
<p>The full closure will safely allow crews to pave and stripe the final portion of the newly aligned southbound 71 lanes. During the weekend closure, crews will also perform a traffic switch to shift traffic onto these new lanes. This shift will extend southbound 71, create additional space for the new connector, and allow it to connect to northbound 71 lanes.</p>
</div>
	<div class="wpb_raw_code wpb_raw_html " >
		<div class="wpb_wrapper">
			<div class="video-container">
    <iframe width="1280" height="720" src="https://www.youtube.com/embed/L3Ngvy37SM4" title="Southbound 71 Closures" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe>
</div>
		</div>
	</div>
<div class="uncode_text_column text-lead" ><p>To avoid lengthy traffic delays, motorists are highly advised to avoid the southbound 71 and use southbound 57 or southbound I-15 to reach the 91 and other destinations located to the south.</p>
<p>Motorists traveling on the southbound 71 will be rerouted to the Butterfield Ranch Rd./Euclid Ave. off-ramp in Chino Hills. Traffic will be detoured northbound along Euclid Ave. to either eastbound or westbound 60, where motorists can travel to either southbound I-15 or southbound 57. Fire, police, and ambulance services will have access for emergency response.</p>
</div><div class="uncode-single-media map text-center animate_when_almost_visible alpha-anim" data-delay="200" data-speed="800"><div class="single-wrapper" style="max-width: 76%;"><div class="tmb tmb-light  tmb-media-first tmb-media-last tmb-content-overlay tmb-no-bg tmb-lightbox"><div class="t-inside"><div class="t-entry-visual"><div class="t-entry-visual-tc"><div class="uncode-single-media-wrapper"><div class="dummy" style="padding-top: 70.6%;"></div><a href="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" class="pushed" data-active="1" data-lbox="ilightbox_single-100770" data-options="width:2993,height:2113,thumbnail: 'https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png'"><img decoding="async" class="wp-image-100770" src="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png" width="2993" height="2113" alt="RCTC 7191 SB7155HourClosure DetourGraphic FINAL" srcset="https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL.png 2993w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-300x212.png 300w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1024x723.png 1024w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-768x542.png 768w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1536x1084.png 1536w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-2048x1446.png 2048w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-500x353.png 500w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-800x565.png 800w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1280x904.png 1280w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-1920x1355.png 1920w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-350x247.png 350w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-24x17.png 24w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-36x25.png 36w, https://www.rctc.org/wp-content/uploads/2024/08/RCTC_7191_SB7155HourClosure_DetourGraphic_FINAL-48x34.png 48w" sizes="(max-width: 2993px) 100vw, 2993px" /></a></div>
					</div>
				</div></div></div></div></div><div class="uncode_text_column text-lead" ><p>Construction activity is subject to change due to site conditions, weather, or other factors. If the work cannot be completed, it will be rescheduled as soon as possible.</p>
<p>Make sure to stay informed by signing up for construction updates &#8211; text 7191interchange to (855) 793-2625 or sign up through the project webpage, <a href="https://www.rctc.org/projects/71-91-interchange-project/">rctc.org/71-91interchange</a>.</p>
</div></div></div></div></div></div><script id="script-row-unique-28" data-row="script-row-unique-28" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-28"));</script></div></div></div><div data-parent="true" class="vc_row row-container" id="row-unique-29"><div class="row limit-width row-parent"><div class="wpb_row row-inner"><div class="wpb_column pos-top pos-center align_left column_parent col-lg-12 single-internal-gutter"><div class="uncol style-light"  ><div class="uncoltable"><div class="uncell no-block-padding" ><div class="uncont" ><div class="empty-space empty-single" ><span class="empty-space-inner"></span></div>
</div></div></div></div></div><script id="script-row-unique-29" data-row="script-row-unique-29" type="text/javascript" class="vc_controls">UNCODE.initRow(document.getElementById("row-unique-29"));</script></div></div></div>
</div><p>The post <a href="https://www.rctc.org/steer-clear-weekend-full-closure-soutbound-71-august-16-19/">Steer Clear! Weekend Full Closure of Southbound 71 at Butterfield Rd./Euclid Ave., August 16-19</a> appeared first on <a href="https://www.rctc.org">Riverside County Transportation Commission (RCTC)</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
