Current Projects:
SR-74 Curve Widening
- Widen median, shoulders, and lanes between Calvert and California
74/215 Interchange Project
- Reconstruct and modify the existing interchange by replacing the current two-lane bridge over the freeway with an eight-lane bridge
Construction Began: Summer 2010
Construction End: Summer 2012
Project Cost: $29 million
Completed Projects:
SR-74 Additional Lanes
- Wasson Canyon Road to 7th Street, Perris
- Dexter Avenue to Wasson Canyon Road, Lake Elsinore
- 7th Street to G Street