Applicants requesting permission to enter, construct and/or maintain improvements on RCTC property must execute a written agreement prior to commencement of the project or use. RCTC grants License Agreements and Rights of Entry (ROE's) only.

A License Agreement is required for longer term uses of RCTC property (construction of facilities, structures, crossings and other long term uses).

A Right of Entry is required for all temporary uses of or temporary access to RCTC property (surveys, potholing and other short term uses). A separate request must be submitted for each entry.

Before a License or ROE can be issued, the applicant must submit a complete application for review and approval.

Complete application submission must include:

You may download a pdf of the entire Application Process by clicking here. You can also review the process online:

RCTC review generally takes 12 weeks from the receipt of a complete application package. If the project or plans require revision, additional review time will be required after the plans are resubmitted. If railroad right of way is involved, a separate set of plans must be sent to BNSF. Plan requirements are provided in more detail in the Application Package Section.

When the application has been approved, a License or ROE agreement will be drafted by RCTC. Template agreements for Licenses and ROE's can be found in the Forms Section. RCTC's legal counsel will approve the agreement as to form and 4 copies will be sent to applicant for signature. Once the signed copies are received, RCTC will sign the documents and send the applicant a fully executed agreement.

An annual fee for Licenses will be determined by RCTC based on the type, location, and area impacted by the project or use.

After the agreement has been fully executed, applicant will need to provide 5 days notice to the RCTC Property Agent prior to beginning construction. If operating railroad right of way is impacted, the BNSF roadmaster must also be given 5 days notice. If applicable, a refund of the deposit will be issued after the facilities are installed or activity is complete and RCTC has conducted a site visit to confirm satisfactory completion of work. Further inquiries may be directed to the Property Agent at 951-787-7141 or cchase@rctc.org.

Home  |  Doing Business  |  Commuter Services  |  Delivering Mobility  |  Library  |  News  |  About Us  |  Contact
Riverside County Transportation Commission • 4080 Lemon Street, 3rd Floor • P.O. Box 12008 • Riverside, CA 92502-2208
Phone: (951) 787-7141 • Fax: (951) 787-7920 • Copyright 2006